Presentation is loading. Please wait.

Presentation is loading. Please wait.

B1 Discussion Group Meeting – 31/08/2012 - 1 - Paris Palais des Congrès 2012 SESSION SC B1 Insulated Cables PS1/Q1: F. LESUR (France) Guidelines for prepared.

Similar presentations


Presentation on theme: "B1 Discussion Group Meeting – 31/08/2012 - 1 - Paris Palais des Congrès 2012 SESSION SC B1 Insulated Cables PS1/Q1: F. LESUR (France) Guidelines for prepared."— Presentation transcript:

1 B1 Discussion Group Meeting – 31/08/2012 - 1 - Paris Palais des Congrès 2012 SESSION SC B1 Insulated Cables PS1/Q1: F. LESUR (France) Guidelines for prepared contributions This template is provided to contributors for prepared or spontaneous contributions Fill in Slide 3 Type in the title of the presentation Specify the number of the preferential subject, number of the question, name of the main speaker and country(replace the given example) Eventually, put the logo of the company or affiliation Fill in Foot note Menu item “View / Header and footer”: Change footer with number of the preferential subject, number of the question, name of the main speaker and country (replace the example given) Save the file with a new name, according the following syntax: “PS1-Q1 - Lesur.ppt” (number of the preferential subject, number of the question, name of the main speaker) (The Secretary will be grateful) Delete slides 1 & 2 of guidelines, and complete the slideshow

2 B1 Discussion Group Meeting – 31/08/2012 - 2 - Paris Palais des Congrès 2012 SESSION SC B1 Insulated Cables PS1/Q1: F. LESUR (France) Template for Paris Session For further information, Guide for discussion contributors can be downloaded at http://www.cigre.org/content/download/15638/554995/version/1/file/Guide+for +Discussion+Contributors.pdf. http://www.cigre.org/content/download/15638/554995/version/1/file/Guide+for +Discussion+Contributors.pdf. Do not forget A contribution is to answer only one ‘Question’ from the Special Report Time will be limited to about 3 minutes per contribution 3 slides is a good target… Visual support (ppt or pptx file) and associated text (1000 words maximum) must be sent in advance to the Special Reporter, Chairman and Secretary of SC B1, for a better organisation Contributions received after August 14 th are not guaranteed to be selected. marco.marelli@prysmiangroup.com, pierre.argaut@sileccable.com, yves.maugain@edf.fr, alain.gille@elia.be marco.marelli@prysmiangroup.compierre.argaut@sileccable.com yves.maugain@edf.fralain.gille@elia.be Only the associated text will be included in the Session proceedings With the written authorization of the authors, the slides will be published on the SC B1 private area

3 - 3 - 2012 SESSION SC B1 Insulated Cables Paris Palais des Congrès B1 Discussion Group Meeting – 31/08/2012 PS1/Q1: F. LESUR (France) Put here the title of the presentation PS1/Q1: F. LESUR (France) Logo of your company only on the first slide (eventually) Country flag (eventually). Can be downloaded here (choose PNG format, 200px).here Delete otherwise.

4 B1 Discussion Group Meeting – 31/08/2012 - 4 - Paris Palais des Congrès 2012 SESSION SC B1 Insulated Cables PS1/Q1: F. LESUR (France) Title of your first slide… Beginning of the presentation…


Download ppt "B1 Discussion Group Meeting – 31/08/2012 - 1 - Paris Palais des Congrès 2012 SESSION SC B1 Insulated Cables PS1/Q1: F. LESUR (France) Guidelines for prepared."

Similar presentations


Ads by Google