Presentation is loading. Please wait.

Presentation is loading. Please wait.

PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.

Similar presentations


Presentation on theme: "PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching."— Presentation transcript:

1 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

2 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC2 Major Goal: Smooth Transition between Mission Phases

3 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC3 EGSE/HCSS Set-up for ILT

4 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC4 AVM-ILT in the PACS Lab

5 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC5 ICC (I) ICC Meeting at MPE, June 26/27 and Oct 7/8: Major topics: –Analysis results of Ge:Ga six-pack data –Discussion of Calibration Implementation Procedures (CIPS), corresponding Test Procedures and Command Sequences –´Godfather´principle: ICC members become familiar with hardware Scientific Simulator WG –Revision of design and architecture, link to HCSS framework –S/C attitude and telescope emissivity and thermal noise included –Chopper commands and spatial sampling added –Complete chain for blue photometer is ready, red part under test

6 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC6 ICC (II) Commanding WG –AVM-ILT: Definition of on-board control procedures, test procedures and related IA/QLA requirements ongoing EGSE WG –Improvements to TestControl to be compliant with CCS environment at Astrium –Discussion on Instrument EGSE hardware (to be delivered to Astrium) with HIFI and SPIRE Operations WG –Support of test activities –Analysis of Ge:Ga six-pack data

7 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC7 Instrument Overview and Subsystem Responsibilities

8 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC8 Test Equipment and OGSE: Overview

9 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC9 CQM ILT Programme ("Blue" means range of parameter settings reduced or test modified) F1.1FPU integration with test cryostat and OGSE3, alignment F1.2Electrical continuity check F1.3Functional test exercising all mechanisms, temperature sensors, sources and detector array read-outs F1.4Cool down to LHe F1.5Functional test exercising all mechanisms, temperature sensors, sources and detector array read-out Q2.1FPU Thermal behaviour Q2.2Focus definition Q2.3Relative alignment check spectrometer vs. photometer arrays after vibration respectively thermal cycling Q2.4sensitivity Q2.5spatial performance Q2.6spectral performance E1.1 Instrument EMC tests C3.1Absolute flux calibration, linearity C3.2Flat field C3.3Point spread function C3.4Distortion, grating alignment C3.5Relative Spectral Response Funct. C3.6Wavelength-calibration using TUFIR replaced by vapour absorption cell C3.7Instrumental profile (grating) measured with TUFIR replaced (however, some initial profile information from absorption line measurements are planned. C3.8Ghosts (search for spectral ghosts) TUFIR only, maybe Ge laser? (C3.9)Stray light (ghosts) with Ge laser? C3.10Detector time response, stability (C3.11) Definition of PACS pass bands with TUFIR (not possible with Ge laser) (C3.12) AOT try out

10 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC10 Calibration WG Compilation and release of PCD draft 7 –CIP´s and CAP´s for functional tests of Ge:Ga detectors –First ideas how to include proton irradiation measurements from tests at UCL-CRC –More details on tests of internal calibration sources AOT design –Preparation of AOT´s for photometer –TN on spectrometer AOT´s Work on spatial calibrators –HiRes images for stellar and extragalactic fields –Astrometric alignment on 2MASS images CIP = Calibration Implementation Procedure CAP = Calibration Analysis Procedure PCD = PACS Calibration Document

11 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC11

12 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC12 Completed Test Descriptions and Command Scripts Requirements CIP/CAP TIP/TAP Tcl IA Functional tests (F1.x, F2.x) Performance tests (P2.x) Calibration measurements (C3.x) Spectrometer 12 6 17 5 6 16 4 6 13 2 0 2 6 14 Requirements CIP/CAP TIP/TAP Tcl IA Functional tests (F1.x, F2.x) Performance tests (P2.x) Calibration measurements (C3.x) Photometer 15 6 11 1 4 9 0 1 6 0 1 0 6* * not complete Most missing spectrometer scripts are in progress, in part pending due to missing technical information Many photometer scripts are pending due to missing technical information, situation slowly improving now

13 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC13 Current PCSS Functionalities (I) Quick-Look Analysis QLA: monitoring of signals in Photometer and Spectrometer pixels –Offline on stored telemetry or decompressed data Preparation of detector selection tables for uplink via GUI Inspect Telemetry and Telecommand Packets: –Automatically propagated from the MIB definitions –Overview of types, number of packets and parameters in the packet sequence –Selection on type, header fields and any telemetry measure in the packets –Extraction of telemetry measures into Tables for convenient plotting, trend analysis, operations, save/restore, export Decompression of science data –Telemetry Packets to Data Frames reduced signals, DMC headers and selected raw data –Access to signals, samples and DMC headers as Tables and Measures for plotting, visualization, fitting, etc… Import of component level CRE/photoconductor data into same structures –of Tables (automatic labeling, inc. units) and on some primitive arrays –Labels, zooming, hardcopy, plotsymbols,...

14 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC14 Current PCSS Functionalities (II) Inspection of raw and reduced detector signals –Statistics on datasets (max, min, mean, median, RMS, sum, ….) –Polynomial fitting on datasets (e.g. integration ramps) –Some functions (FFT, Convolutions) Plotting –of Tables (automatic labeling, inc. units) and on some primitive arrays Labels, zooming, hardcopy, plotsymbols,... Store the History of your session, edit it and rerun it Write your own data reduction scripts in jython –starting from templates and examples Define Tables or other data structures to hold intermediate results or CAP results (Calfiles), populate them, save/restore as fits, exchange them Export any dataset to FITS

15 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC15 Current PCSS Functionalities (III) Improved support of CRE Data analysis Interface to OBSW development Image dataset (image, WCS) + viewer + operations Image cube dataset + viewer + operations Spectrum dataset + viewer + operations Select/where on tables and Data HK correlation with Science Data QLA running on near real-time telemetry stream MIB Calibration curves applied on housekeeping measures More functions and optimization algorithms Access to PACS operational Database Data rate monitor Use simulator data to test reduction scripts / CAPS Access to instrument properties (e.g. Calibration source spectrum/cube, detector numbering) for different instrument models / configurations Improved User Documentation Optimization for Decompression IDL Bridge implementation Intensive User developer ‘workshops’ with immediate implementations of missing functionalities IA Processes as plug ins into QLA : BG Subtraction, Averaging, … TC to TM verification framework Version control for Detector Selection Tables

16 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC16 OVERALL HERSCHEL S/C Test Configuration

17 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC17 IEGSE for IST OOL TCH

18 PACS IHDR MPE, 12/13 Nov 2003 PACS ICC18 IEGSE, CCS/PLM – DPU I/F Tests IEGSE  H/W configuration under discussion between 3 instruments  CCS - IEGSE I/F tests: Router, SCOS 2000, TOPE, Test Control: end March 04 at Astrium, Ottobrunn DPU 1553 I/F test:  Contract with Satellite Services, NL: test of physical layers (MIL 1553B) at MPE, first week of December: 6k€  CCS/PLM – DPU+SPU, DECMEC Simulators: test at Astrium, Ottobrunn, second week of December, supported by Satellite Servives


Download ppt "PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching."

Similar presentations


Ads by Google