ESA UNCLASSIFIED – For Official Use EGNOS Evolution Program Update D. Flament : Head of ESA EGNOS Division and Program manager IWG#26 – New Delhi, India,

Similar presentations


Presentation on theme: "ESA UNCLASSIFIED – For Official Use EGNOS Evolution Program Update D. Flament : Head of ESA EGNOS Division and Program manager IWG#26 – New Delhi, India,"— Presentation transcript:

1 ESA UNCLASSIFIED – For Official Use EGNOS Evolution Program Update D. Flament : Head of ESA EGNOS Division and Program manager IWG#26 – New Delhi, India, 5-7 Feb 2014

2 D/NAV/ER | Slide 2 Presentation outline System Status Release Plan Current Industrial activities −Com network migration in 2013 What is next ?

3 GPS EGNOS Wide Area Network NLES (two per GEO) Ranging and Integrity Monitoring Stations MCC1MCC2MCC3MCC4 Mission Control Centres SOUSPU Support Facilities RIMS1 RIMS2 RIMS … n Ground Segment CPFCCF GEO Space Segment EGNOS Architecture

4 D/NAV/ER | Slide 4 System Status & Release Plan

5 ESA UNCLASSIFIED – For Official Use User Adoption Evolutions Maintenance & operations The real life of an operational system Lessons learned, best practices and Reform in US DoD Space acquisition program (GAO report 2007) after 2 decades of problems (cost, delays, etc..) Evolutionary development. “.. incremental path toward meeting market and user needs rather than attempting to satisfy all needs in a single step. This provided program managers with more achievable requirements, which, in turn, facilitated shorter cycle times...”

6 EGNOS V2 Release Plan

7 D/NAV/ER | Slide 7 ESA UNCLASSIFIED – For Official Use Status of RIMS Deployment Site Status as of December 2012 Remaining ESA activities Expected completion Agadir Qualified within V2.3.2 NA Tamanrassetsite survey carried outCompletion of site infrastructure and deployment of RIMS. Qualification. To be defined based upon EC decision Abu SimbelQualified within V2.3.2 NA HaïfaSite survey performed Second survey carried out in October 2012 Completion of site infrastructure and deployment of RIMS. Qualification. V2.4.2

8 D/NAV/ER | Slide 8 EGNOS RIMS Network – Targeted network 41 RIMS sites

9 D/NAV/ER | Slide 9 ESA UNCLASSIFIED – For Official Use 2013 – EC Delegation framework - Major Achievements System: −QR of V2.3.2 in summer and deployment / start of operations in Oct Improvement in Performance & robustness to IONO.. −CDR V2.4.1 M in summer Major step in obsolescence management −Completion of TWAN G2 qualification, HO to ESSP, operational migration (see detailed slides after) −First phase of V2.4.1 M AIV Sub-system: −NLES G2 detailed design & development −CCF G2 detailed design & development −Support Facilities major evolutions development and qualification −Communication network technology refresh Preparation of the new Industrial activities procurements for 2014/2017 Follow up of PROSBAS activity (EC funding) to support DFMC work plan (see dedicated presentation)

10 V2.3.2 Jan 2014 V2.2 May 2011 Operational EGNOS APV-1 Availability

11 ESA UNCLASSIFIED – For Official Use Major Obsolescence management achievement in 2013: EGNOS Wide Area Communication Network Migration (G1 to G2)

12 D/NAV/ER | Slide 12 ESA UNCLASSIFIED – For Official Use Requirements 1.Programmatic context: 1.Existing EGNOS Network Technology Obsolete with a deadline imposed by BT of early Necessity to migrate on time in order to avoid risk to service availability and/or considerable cost impacts 2.Initial trade-off between approaches: 1.Migrate with Notice to Users with a Service Interruption 2.Migrate without Service Interruption (Continued Service) : Chosen Option 3.Migration high level requirements: −service at least as good as current service −Migrate without Service Interruption (Continuous service) −Migrate without risk on Integrity

13 D/NAV/ER | Slide 13 Before migration situation : -RIMS attached to one MCC (FR before 2.3.1) -MCC interconnected with IPLC. -NLES connected through IPLC network. -VSAT (C, Ku) partially redundant After migration situation : -RIMS (MPLS) attached to ALL MCC. -MCC interconnected with MPLS. -NLES connected through MPLS. -VSAT C band only fully redundant Full MPLS Network with added redundancy. VPN1 to VPN2 Migration

14 D/NAV/ER | Slide 14 Original Situation. EGNOS Migrated to the new VPN. During migration : -Deployment of a second MPLS network. -Connection of each RIMS to the network (Raw data only). -Independence of the networks (For safety reasons). -Testing of EGNOS on the new network independently of EGNOS in operation.

15 D/NAV/ER | Slide 15 ESA UNCLASSIFIED – For Official Use Results : 10 days encompassing the operational migration executed by ESSP

16 GEO Roadmap – Satellite view

17 D/NAV/ER | Slide 17 EGNOS short / medium term plan Urgent procurements ( ) −WO1 (2.4.2 Phase B and pre-devpts) −WO2(ASTRA 5B Integration and Qualification) −WO3(Recurring RIMS (2)) −PCIP6(Security analysis) −PCIP7 (V2.4.2 Phase C/D)) Continue R&D (EGEP / H2020) Preparation of the CD Phase of EGNOS V3 Transition to new framework (Working arrangement with GSA)

18 D/NAV/ER | Slide 18 Conclusion Major successes in 2013 (V2 Evolutions, V3 SRR, EGEP results) Ambitious program of work (on both V2 and V3) for next 8 years 2014 is the year to transition to new framework for (GSA, new working arrangement) International momentum around SBAS still growing Cooperation between ESA & ASECNA has started (MOU for Ionospheric data collection & processing)

19 D/NAV/ER | Slide 19 EGNOS Evolutions in the context of EGNOS Exploitation Program (GSA) Service Provision (GSA) Infrastructure (ESA) R&D System & techno (ESA) WAAS & other SBAS IWG, Eurocae, RTCA, ProSBAS New services preparation EGNOS V2 services (OS, SoL, EDAS) ; EU28, LPV200, and other extensions TBC (Ukraine..) V3 Phase B2 V3 Phase C/D Test Beds; Techno Pre-Devpt, SBAS Infra R&T. IWG, SBAS L1/L5 / multi-const. Standardisation Avionics L1/L5 multi-const MOPS Phase III- LPV200 Tech. Ref. Phase III- LPV200 OPS Phase IV- LPV200 OPS SBAS L1/L5. SBAS L1/L5 ICD V2.4.1P; V2.4.2 ; V2.5 (TBC ) Second generation services Procurement & Implementation GAGAN, SDCM, etc………….. Validated MOPS