TERMINAL LAY OUT SYSTEMSFACILITIESCAPACITIES. Quay Quay Storage Area (Yard) Storage Area (Yard) Reception/Delivery Area Reception/Delivery Area Facilities.

Similar presentations


Presentation on theme: "TERMINAL LAY OUT SYSTEMSFACILITIESCAPACITIES. Quay Quay Storage Area (Yard) Storage Area (Yard) Reception/Delivery Area Reception/Delivery Area Facilities."— Presentation transcript:

1 TERMINAL LAY OUT SYSTEMSFACILITIESCAPACITIES

2

3 Quay Quay Storage Area (Yard) Storage Area (Yard) Reception/Delivery Area Reception/Delivery Area Facilities Facilities QUAY: QUAY: Ship’s working area Ship’s working area Bollards marked and numbered Bollards marked and numbered Safe access for pedestrians etc. - marked by yellow lines Marking of trucklanes Safe access for pedestrians etc. - marked by yellow lines Marking of trucklanes

4 TERMINAL LAY OUT Backreach for hatchcovers /shifters etc. Backreach for hatchcovers /shifters etc. STORAGE AREA STORAGE AREA Stacking pattern: Stacking pattern: Straddle carrier: transversal to the quay RTG/RMG:parallel to the quay FLT:transversal to the quay Reachstacker: transversal to the quay Fire fighting connections Fire fighting connections Light masts Light masts

5 TERMINAL LAY OUT Stacking patterns - fire fighting hydrants Stacking patterns - fire fighting hydrants Terminal Lighting: Large masts, well protected (collisions) Terminal Lighting: Large masts, well protected (collisions) Working area’s: Container crane:100 - 200 Lux Yard working area: Min. 20 Lux Other:Min. 5 Lux Working area’s: Container crane:100 - 200 Lux Yard working area: Min. 20 Lux Other:Min. 5 Lux

6

7

8

9

10

11

12

13 FACILITIES GATE GATE ADMINISTRATION BUILDING: Ship’s Agents Customs Truckers etc. ADMINISTRATION BUILDING: Ship’s Agents Customs Truckers etc. CANTEEN plus wash/shower facilities CANTEEN plus wash/shower facilities WORKSHOP WORKSHOP CONTAINER FREIGHT STATION (CFS) CONTAINER FREIGHT STATION (CFS) STORE ROOM STORE ROOM RAILCONNECTION RAILCONNECTION (REPAIRFACILITIES) (REPAIRFACILITIES) MT DEPOT MT DEPOT

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45 TERMINAL LAY OUT IMPORT STACK/ZONING IMPORT STACK/ZONING EXPORT STACK/ZONING EXPORT STACK/ZONING MT STACK/DEPOT MT STACK/DEPOT REEFER STACK REEFER STACK REPAIR STACK REPAIR STACK STACKING OF DG CONTAINERS STACKING OF DG CONTAINERS STACKING OF SPECIALS/OVERSIZE STACKING OF SPECIALS/OVERSIZE

46

47

48

49

50

51

52

53

54

55

56 TERMINAL LAY OUT CAPACITY

57 CAPACITY EQUIPMENT EQUIPMENT STORAGE (AREA) STORAGE (AREA)

58 CAPACITY EQUIPMENT Container Crane: 3-4000 hrs x 25 ctrs/hr =75-100.000/yr Container Crane: 3-4000 hrs x 25 ctrs/hr =75-100.000/yr Straddle Carrier: 3000 hrs x 12 ctrs/hr = 36.000/yr Straddle Carrier: 3000 hrs x 12 ctrs/hr = 36.000/yr Rubber Tyred Gantry: 3000 hrs x 20 ctrs/hr = 60.000/yr Rubber Tyred Gantry: 3000 hrs x 20 ctrs/hr = 60.000/yr Rail Mounted Gantry Rail Mounted Gantry

59 CAPACITY STORAGE Storage Systems: Storage Systems: Chassis45 m2/TEU Chassis45 m2/TEU Straddle Carrier16 m2/TEU Straddle Carrier16 m2/TEU RTG12 m2/TEU RTG12 m2/TEU RMG 9 m2/TEU RMG 9 m2/TEU FLT (MT) 7 m2/TEU FLT (MT) 7 m2/TEU FLT (Full)25 m2/TEU FLT (Full)25 m2/TEU Reachstacker15 m2/TEU Reachstacker15 m2/TEU

60

61 CAPACITY EQUIPMENT: Containers/moves per hour/shift/year EQUIPMENT: Containers/moves per hour/shift/year STORAGE:TEU’s STORAGE:TEU’s SHIPS:TEU’s SHIPS:TEU’s TEU = Twenty feet Equivalent Unit TEU = Twenty feet Equivalent Unit FEU = Fourty feet Equivalent Unit FEU = Fourty feet Equivalent Unit

62 CAPACITY STORAGE Criteria: Criteria: Equipment (m2/TEU) Equipment (m2/TEU) Dwell Times:Exports 3-5 days Imports 6 days MT’s25 days Dwell Times:Exports 3-5 days Imports 6 days MT’s25 days Yard Occupancy Factor: 0.75 Yard Occupancy Factor: 0.75 Peak Factor: 1.3 Peak Factor: 1.3

63 CAPACITY STORAGE EXAMPLE: EXAMPLE: Annual Throughput: 350.000 ctrs=420.000 TEU Annual Throughput: 350.000 ctrs=420.000 TEU 80% Full=336.000 TEU 80% Full=336.000 TEU 20% MT = 84.000 TEU 20% MT = 84.000 TEU Average dwelltimes: 12 days Average dwelltimes: 12 days Yard Handling Equipment: RTG Yard Handling Equipment: RTG

64 CAPACITY STORAGE Storage Area Requirements: 432.000 x 12 x 12(m2) x 1.3 x 1 = 365 0.75 432.000 x 12 x 12 x 1.3= 365 x 0.75 296230 m2 = 30 ha. Storage Area Requirements: 432.000 x 12 x 12(m2) x 1.3 x 1 = 365 0.75 432.000 x 12 x 12 x 1.3= 365 x 0.75 296230 m2 = 30 ha. Facilities plus working area’s (Trucklanes - Quay - Backreach etc): abt. 35% Facilities plus working area’s (Trucklanes - Quay - Backreach etc): abt. 35% Total Area : 45 ha. Total Area : 45 ha.