Presentation is loading. Please wait.

Presentation is loading. Please wait.

“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”

Similar presentations


Presentation on theme: "“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”"— Presentation transcript:

1 “L3” Jeff Landgraf

2 In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.” and followed up with a few paragraphs of rather obvious, unconsidered, unprioritized, inconclusive, rambling opinions. Here they are.

3 Point #1 – TPC is not going to be a slow detector. Point #1 – TPC is not going to be a slow detector. –TPC as fast, if not faster than EMC’s L0FEE’sRDO’sRBSB’sEVB Linux Farm RCFDST L2 L0 FEE’sRDO’s RCF DST RB/SB/EVB/L2 700hz 100hz100hz 500hz ??? 500hz The Old System: The New System: 700hz 1-5khz 500hz ???

4 So what is the role of L2 / L3? It won’t be to abort TPC. It won’t be to abort TPC. Why not? Why not? –L2 detectors would have to be faster than TPC (at least 10x faster to be worthwhile) –Gated Grid would have to be faster than TPC readout (10x for to be worthwhile)

5 Reduce Data Volume? Write out tracks? Write out tracks? –8 helix parameters (including dedx & track length), all floats. Need ~8 words per track not including niceties like chisquare, number of hits. Current L3 structure has 13 words. –Need multiple origins for each track to extrapolate to origin and to outer detectors? –Between 16-26 words needed to define track. –Clusters only are 2 words / hit, so a 20 hit track needs only ~40 words. –Perhaps there is a 50% data volume savings… but –Calibrations need to be final before run starts. –Tracking algorithm would need to be trusted.

6 Reduce Data Volume? (continued) Pileup rejection… Pileup rejection… –Do tracking –Tag hits from tracks –Remove hits from datafile if they come from pileup events –Idea suffers from same calibration / verification issues as writing out tracks.

7 Monitoring Monitoring has been one of the biggest bonuses from both L2 and L3 Monitoring has been one of the biggest bonuses from both L2 and L3 Its important to keep this functionality up (and to keep expanding it), even if in the end there is no room for higher level triggers. Its important to keep this functionality up (and to keep expanding it), even if in the end there is no room for higher level triggers.

8 Analysis Calibrations Calibrations –It would be very nice to see more detector calibration procedures get automated and move into the counting house – ideally in an L2/L3 like entity, could save weeks commissioning each year. L4 trigger, used only to reject events from going to RCF is a very possible idea… But the purpose would be to lighten the load on the reconstruction rather than increase bandwith. L4 trigger, used only to reject events from going to RCF is a very possible idea… But the purpose would be to lighten the load on the reconstruction rather than increase bandwith.

9 Express Streams Express streams are always associated with L2/L3 triggers, but are not! It is the event builders that determine data files. Express streams are always associated with L2/L3 triggers, but are not! It is the event builders that determine data files. I would like to expand express streams dramatically. I would like to expand express streams dramatically. –2005 ppProduction: if we separate EVERY trigger into separate stream, then only suffer ~9% data overhead. –Analysis chains could be specifically tailored to each trigger – in many cases (I believe) this would lead to much more efficient analysis. –Reconstruction could be better prioritized.

10 Summary I’m pessimistic about high level triggers used to abort the TPC in the daq1000 era. I’m pessimistic about high level triggers used to abort the TPC in the daq1000 era. We need to put real effort into maintaining and improving some analysis capability in the control room for monitoring & calibrations. We need to put real effort into maintaining and improving some analysis capability in the control room for monitoring & calibrations. The function of L2/L3 like entities in the new system will be to support efficient offline analysis, not to trigger. The function of L2/L3 like entities in the new system will be to support efficient offline analysis, not to trigger. New L0 trigger ideas, detectors are the path for improving STAR’s trigger. New L0 trigger ideas, detectors are the path for improving STAR’s trigger.


Download ppt "“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”"

Similar presentations


Ads by Google