Presentation is loading. Please wait.

Presentation is loading. Please wait.

ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS Possible applications with: MUNICIPAL WASTE (MW)

Similar presentations


Presentation on theme: "ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS Possible applications with: MUNICIPAL WASTE (MW)"— Presentation transcript:

1 ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS Possible applications with: MUNICIPAL WASTE (MW) RDF (Refuse Derived Fuels) WOODEN and ORGANIC CHIPS INDUSTRIAL AND PLASTIC WASTES OR FLUFF HOSPITAL WASTES ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA1 Continuous loading by means of a feeder conveyor with loading hopper and ram loading machine / ash continuous discharge For more details please contact our office

2 ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATOR KILNS SERIES ROT ADAPTED FOR BIG WASTE TO ENERGY APPLICATIONS ROT furnace technology offers many advantages: Complete incineration Complete ash inertizing Minimum ash quantity Great loading flexibility Precise combustion control Continuous service Low working costs Very high economic profit Long duration of plant ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA2 The ROT furnace basic plant is normally coupled to a dry super depuration plant with very low emissions (NZEP plants)

3 ATI G&G IMPIANTI INCINERATORS BRANCH FLUE GAS DRY SUPER DEPURATION PLANTS AT CEE NORMS PREVISION 2012 (NEAR TO ZERO EMISSIONS PLANTS) ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA3

4 ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA4

5 ATI G&G IMPIANTI INCINERATORS BRANCH FLUE GAS CLEANING PLANTS (NEAR TO ZERO EMISSION PLANTS) ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA5 NZEP plant lay out with n.4 rotating counter current furnaces ROT150, n.4 HP boilers and n.4 steam turbines for 8 Mw el. each – capacity MTPY (metric tons per year)

6 ATI G&G IMPIANTI INCINERATORS BRANCH FLUE GAS CLEANING PLANTS AT CEE NORMS WITH NEAR TO ZERO EMISSIONS ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA6

7 ATI G&G IMPIANTI INCINERATORS BRANCH OPERATIVE STRUCTURE ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA7

8 ATI G&G IMPIANTI INCINERATORS BRANCH INCINERATORS ENGINEERING AND PRODUCTION Contact information: G.&G.IMPIANTI SAS di Ing.Gallarati C.&C. Local workshop: via dei Marinoni 43 CAP CIGOGNOLA PV - ITALIA tel. & fax.: : Find further information on web sites : ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA8 DWG trade-mark ®:


Download ppt "ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS Possible applications with: MUNICIPAL WASTE (MW)"

Similar presentations


Ads by Google