1 OFFSHORE PIPELINE CONSTRUCTION PHASE  Pipe Laying : Normal S-Laying Method

2 OFFSHORE PIPE LAYING: Normal S-Laying Method

3 Step 1: PIPE BEVELING  Lift the pipe out of the supply barge onto the incoming rack  Pipe Tallying (pipe number, length, joint number)  Making the J-Bevel on pipe ends for Auto welding

4 Step 2: Station 1 (Fit up, Root and Hot Pass)  Preheat on pipe end prior to welding (based on approved WPS)  Fitting pipe ends to be aligned by means of internal clamp  Root weld followed by Hot pass

5 Step 3: Station 2,3,4&5  Filler passes on Station 2 and 3  Cap welding on Station 4  Visual Inspection on Station 5 Sta # 2 Sta # 3 Sta # 4 Sta # 5

6 Step 4: Station 6 (X-Ray) X-ray operators control the movement of the X-ray crawler inside the pipe Wrapping the film around the intended joint Radiographic intrepeters from HHI, Client and Migas are reviewing the X-ray result

7 Step 5: Station 7& 8 (Brush up and Cold Wrap) Sta # 8: Cold Wrap Sta # 7: Brush up

8 Step 6: Station 9 (FIELD JOINT COATING) & PULLING  Foam Coating performed by OJS (Offshore Joints Service)

9 WELDING

10 X - Ray

11 Coating

12 Laying

13 HD 423 Laying

14 HD 423 LINE PIPE ON SEA BED

15 P2 P1 S1 S2 P4 S4 P5S5 How the Barge Moves

16 P2 P1 S1 S2 P4 S4 P5S5

17 P2 P1 S1 S2 P5 S5 P4 S4 P5 S5

18 P2 P1 S1 S2 P4 S4 P4 S4 P5 S5

19 P1 S1 P2 S2 P4 S4 P2 S2 P5S5

20 P2 S2 P4 S4 P1 S1 P5S5