Presentation is loading. Please wait.

Presentation is loading. Please wait.

Reference: FM 3-25.26, FM 3-21.8 Task Organization: WTB – Personnel as needed throughout 1 st PLT- 56 2 nd PLT- 56 HQ PLT- 12 I. SITUATION: A. Enemy: None.

Similar presentations


Presentation on theme: "Reference: FM 3-25.26, FM 3-21.8 Task Organization: WTB – Personnel as needed throughout 1 st PLT- 56 2 nd PLT- 56 HQ PLT- 12 I. SITUATION: A. Enemy: None."— Presentation transcript:

1 Reference: FM 3-25.26, FM 3-21.8 Task Organization: WTB – Personnel as needed throughout 1 st PLT- 56 2 nd PLT- 56 HQ PLT- 12 I. SITUATION: A. Enemy: None B. Friendly: RR Cadets must be proficient in day and night land navigation IOT complete BRC, which will be conducted on the same BFTC Land-Nav. course that we practice on. C. Terrain: Urban streets will be utilized on the march out to BFTC. At BFTC the terrain is uneven with deep gullies and heavy brush, with small clearings interspersed. D. Light/Weather: Rudders Ranger Company LNFTX 16 -17 OCT 2009 Staff/HQ PLT 2 SQDS ~6 PAX/SQD 1 st PLT 4 SQDs ~14 PAX/SQD 2 nd PLT 4 – SQDs ~14 PAX/SQD 1 st PLT2 nd PLT Staff/HQ Training Area DateForecast High/ LowBMNTEEMT 16-Oct87/667291853 17-Oct88/557301852

2 II. Mission: Rudder’s Ranger Company will conduct a Land Navigation practical exercise on the established Land-Nav. course to the northeast of the BFTC from 161530OCT09 to 171500OCT09 IOT familiarize first-year cadets with the practical applications of Land Navigation and prepare them for the tested event at BRC. III. Execution Commander's Intent: It is my intent for the company to deploy to BFTC in a timely manner, conduct 4 separate LN PEs, and release all cadets NLT 171500OCT09. The key to successful training will be for squad leaders and team leaders to give their cadet’s individual instruction to correct deficiencies. Successful End state: All Brown shirts have participated in 4 LN PEs and have successfully completed a day and a night exercise without injury and with no equipment lost. Safety will be the key to the success of this operation. A. Concept of the Operation: This operation will be conducted in 7 phases. Phase I: Advanced Party This phase begins when the S3, S4, XO, and all available senior staff begin transporting equipment out to the TOC @ BFTC and doing a final check of point locations NLT 161200OCT09. This phase ends when the RR company is formed up on the grassy knoll. Phase II: MVMT This phase begins when the RR company is formed up with full accountability of all personnel and equipment NLT 161530OCT09. The company will then step off for BFTC NLT 1600 after PCCs have been conducted. This phase ends with the RR Company’s arrival at the TOC/ SP area of BFTC NLT 1700. Stragglers will from-up on the grassy knoll NLT 161700OCT09 and be transported to BFTC by the S-1. Anyone who cannot make this time will POV to the Land-Nav. Sight. Phase III: Land Navigation PE & RON Upon arrival at BFTC cadets will drop rucks in a company formation and immediately receive a briefing on the first PE. Cadets will begin plotting NLT 161730OCT09 and will return NLT 1815. Over the course of the next several hours RR will conduct two night iterations, poncho shelter training/construction, RON, and another day iteration, which will end NLT 171030OCT09. Phase IV: MVMT Begins with Company accountability formation following the final iteration of Day-Nav. After policing the area RR will step off for the O-Course NLT 171100OCT09. This phase ends with the arrival at the O-Course NLT 171130OCT09. Phase V: O-Course After arrival and accountability formation RR will conduct O-Course and Stamina Course. This phase is completed when all brown shirts have completed both events. Phase VI: Return MVMT Begins with Company formation and accountability following the O- Course completion. After policing the area RR will step off for main campus NLT 171330OCT09. The phase ends with arrival at the Trigon NLT 171430OCT09. Phase VII: Recovery & Release Begins with arrival at Trigon and ends when all equipment is recovered and the safety brief given to all cadets prior to release. Rudders Ranger Company LNFTX 16 -17 OCT 2009 12 Staff 1SG CO RR LNFTX (16 – 17 OCT) First Formation

3 Rudders Ranger Company LNFTX 16 -17 OCT 2009 B. Task to Maneuver Units Phase I: Advanced Party Staff: S3 & S4 will coordinate setup of TOC, confirm points, and complete site prep NLT 161500OCT09. 1 st PLT: NONE 2 nd PLT: NONE Phase II, IV & VI: Movement Staff: S3 & XO will run trail vehicles, other staff members will finalize on-site setup. 1 st PLT: Will march in tactical road march formation on the right side of the Joe Route until we reach the George Bush Library, where 1 st PLT will shift into a tight platoon formation in preparation for crossing 2818 2 nd PLT: Will march in tactical road march formation on the left side of Joe Route until we reach the George Bush Library, where 2 nd PLT will shift into a tight platoon formation in preparation for crossing 2818 Phase VI will be done in reverse order of Phase II Trigon Training Area Route: 2818/ George Bush Dr. Intersection Note to Staff: It is critical that Phase I is completed on time. We have zero leniency in our timeline once the Company has arrived at BFTC, therefore we MUST be 100% ready to send cadets out as soon as they arrive.

4 Formation/RON: TOC: Medic: H2O: Latrines: Rudders Ranger Company LNFTX 16 -17 OCT 2009 B. Task to Maneuver Units (Cont.) Phase III: Land Nav. PE & RON Staff: S3 will run TOC operations & enforce timeline while XO coordinates lane-walkers as a safety measure. S4 will maintain accountability for all compasses and other equipment. 1 st PLT: Release brown shirts to participate in PE, SLs & TLs will walk lanes to assist brown shirts who are having trouble. Take accountability of all personnel after each iteration and maintain a 2 man fireguard during RON. 2 nd PLT: Release brown shirts to participate in PE, SLs & TLs will walk lanes to assist brown shirts who are having trouble. Take accountability of all personnel after each iteration and maintain a 2 man fireguard during RON. Punches will be used to ID all points. Timeline for Phase III: Not To Scale Day/NightStart TimeEnd Time# of PTS Day173018153 Night190021007 Night220001007 Night01000630RON Day073010307

5 Rudders Ranger Company LNFTX 16 -17 OCT 2009 B. Task to Maneuver Units (Cont.) Phase V: O-Course Upon arrival accountability formation will take place, rucks and equipment will be dropped in formation. SL and TL will guide brown shirts through the course. Spotters will be in place on all obstacles to reduce the risk of injury. 1 st PLT: Will be first on the O-Course and follow 2 nd PLT on the Stamina course once all 1 st PLT brown shirts have completed all O-Course obstacles. 2 nd PLT: Will be first on the Stamina course and will follow 1 st PLT on the O-Course once all 2 nd PLT brown shirts have completed all Stamina course obstacles. Formation/NS: Medic: H2O: OC HGAC Stamina Course

6 Rudders Ranger Company LNFTX 16 -17 OCT 2009 Training Area B. Task to Maneuver Units (Cont.) Phase VII: Recovery & Release Staff: Staff will assist S4 with getting positive accountability of all equipment. 1 st PLT: Maintain accountability of personnel until safety brief by CO is complete, release cadets. 2 nd PLT: Maintain accountability of personnel until safety brief by CO is complete, release cadets. C. Coordinating Instructions TimeTask 1200 Staff begins Phase I setup, S3 & S4 begin moving equipment 1530Formation on Grassy Knoll 1600Company steps off for BFTC 1700Company arrives @ BFTC 1730First iteration begins 1815First iteration ends 1900Second iteration begins 2100Second iteration ends, chow 2200 Third iteration begins 100Third iteration ends 100RON 630Stand-to, hygiene, chow 730Final iteration begins 1030Final iteration ends 1100Step off for O-Course 1130Arrive @ O-Course 1145Run O-Course and Stamina Course 1330Step off for Trigon 1430Arrive @ Trigon 1430Recover all equipment 1500Safety brief & cadets released

7 Rudders Ranger Company LNFTX 16 -17 OCT 2009 Training Area C. Coordinating Instructions (Cont.) Uniform & Packing List Items Worn Complete ACU/BDU set Patrol cover Boots Boot socks LCE/LBV (complete) Pen/paper TACSOP Items Packed 550 Cord Rucksack Poncho Wet weather top Wet weather bottom Field jacket Field jacket liner/polypro Black gloves Glove liners Beanie ACU/BDU complete set (2 pair) Tan/brown shirt (2) Boot socks (3 pair) Red lens flashlight Foot care kit Knife Ziploc bags MRE (2)

8 Rudders Ranger Company LNFTX 16 -17 OCT 2009 Training Area IV. Service & Support Company Trains: Food & Water 340 MREs 26 water cans TOC supplies 3 table 1 pavilion 6 chairs First Aid Kit Lantern Engineering Tape Chem Lights Rope Land Nav. supplies Lane strips 3 GPS units Maps Protractors Pencils Compasses Land Nav. Box Comms 18 ICOMS, If available

9 Rudders Ranger Company LNFTX 16 -17 OCT 2009 Training Area V. Command & Signal: COMMAND Succession of Command CO S-3 XO 1SGT 1PL 2PL 1PSG 2PSG S-1 S-2 S-4 S-5 S-6 Call Signs- CO: Ranger 6 XO: Ranger 5 1SG: Ranger 7 S3: Ranger 3 1PL: Red 6 2PL: White 6 TOC: Ranger Main Note: as soon as we establish the TOC, S3 will be answering for Ranger Main. Frequencies- Primary: Ch. 6 ALT: Ch. 2 Emergency: Cell Ph. Trigon: (979) 845-2814 CO Cell: (316) 648-9242 Emergency: 911 SIGNAL


Download ppt "Reference: FM 3-25.26, FM 3-21.8 Task Organization: WTB – Personnel as needed throughout 1 st PLT- 56 2 nd PLT- 56 HQ PLT- 12 I. SITUATION: A. Enemy: None."

Similar presentations


Ads by Google