Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status report for revision of API 17F (ISO )

Similar presentations


Presentation on theme: "Status report for revision of API 17F (ISO )"— Presentation transcript:

1 Status report for revision of API 17F (ISO 13628-6)
API Winter 2013

2 Status Draft document was balloted by API
ballot closing on 1st October 2012. Ballot passed with 15 affirmative and 2 negative votes. Total of 473 comments, (editorial ~ 200), draft did not include latest SISS group comments. comments addressed, reviewing with negative voters to reach agreement. Plan to circulate updated document or submit for re-ballot.

3 Milestones Milestone Targets Completion Date API Ballot closed
October 2012 Draft updated December 2012 Circulate comments or re-ballot 1Q 2013 Planned publication 2Q 2013

4 ISO task group participants
Project leader Roald Loug Hansen, StatoilHydro, Norway, Members Paul Thomas, Aker Solutions, UK, Bruce Scott, Halliburton, , Christopher Curran, BP, USA, Frederico Nicoletti, Subsea 7, Brazil, Gerhard Wilche, Cameron, Germany, Ian Kent, GE, UK, Jesper Jacobsen, Dong Energy, Denmark, John Bodine, Chevron, USA, Ken Ellis, SES, , Mike Theobald, Maersk Oil, Denmark, Stefan Knepper, Cameron, Germany, Svein Lilleland, FMC, Norway, Sverre Corneliussen, FMC, Norway, Trond Bertmand, StatoilHydro, Norway, Werner Menz, Cameron, Germany, David Saul, BP, UK, Jens-Henrik Neuenkirchen, StatoilHydro, Norway,

5 API 17F working group Christopher Curran, BP Brian Skeels, FMC
David Lansbury, FMC Jay Hursh, Aker Solutions John Allen, Worley Parsons John Simon, Shell Mike Brashear, Chevron Lee Mitchell, Chevron Richard Barratt, GE Vetco Brant Caton, BP Jim Metzinger, Technip Butch Taggart, Murphy Al Williams, Dril-Quip Don Ogwude, CSI Jose D Baca ExxonMobil Lon Ngo, Dril-Quip Mark Marsalis, Dril-Quip Ryan Chladek, ExxonMobil


Download ppt "Status report for revision of API 17F (ISO )"

Similar presentations


Ads by Google