METRO STATE COLLEGE BACKFILL PROJECT DRAFT PROGRAM PLAN REVIEW.

Similar presentations


Presentation on theme: "METRO STATE COLLEGE BACKFILL PROJECT DRAFT PROGRAM PLAN REVIEW."— Presentation transcript:

1 METRO STATE COLLEGE BACKFILL PROJECT DRAFT PROGRAM PLAN REVIEW

2 BACKFILL SCOPE

3  Address most critical space deficiencies for Metro Schools and Programs included in the study  Create an net increase in classroom space on the campus  Consolidate (where possible) LAS in Central, SPS in West and SCOB in Admin. Buildings  Distribute space equitably between schools  Improve spaces through remodel and reconfiguration to make more efficient, meet standards and codes  Minimize disruption and cost, while achieving the above.  Implement green design standards where possible PROJECT GOALS AND OBJECTIVES

4 CURRENT CONDITIONS  ADMINISTRATION BUILDING – Approx. 20,000 SF +/- available after moves related to Science Building – Can support primarily office space and minimal new classroom space due to restroom capacities, exiting issues and existing room configurations – Is at “edge” of campus – Slated as new home for School of Business

5  Being driven by enrollment, current space shortages in office and classroom/lab space, and institutional goals  Space available through backfill project is finite, and not able to meet the full program requirements defined  Total space requested : 153,400 SF  Total space available: 144,000 SF  Difference: 9,400 SF (Does not include classroom space) SPACE NEEDS

6 Summary of Non-Classroom Space Per School SPACE NEEDS

7 ADMINISTRATION, LEVEL 4 REMODEL / OCCUPANCY PLANS

8 Two primary phases  Phase 1: After staging space in Admin. vacates – Five sub-phases – Approx. 30,360 SF in Admin, 2,700 SF in Central and 12,350 SF in West Buildings effected  Phase 2: After Student Success Bldg. is completed – Four sub-phases – Approx. 2,500 SF in Admin, 51,730 SF in Central, 9,500 SF in West, 4,850 SF in Art, 9,200 SF in King and 1,830 SF in Tech Buildings effected PHASING

9 COST ESTIMATE

10  Schools Review Program Plan Draft Document  Final review comments due back no later than November 9. Additional changes past this will be addressed during design process.  Finalize draft document for submittal for Metro, AHEC, and State review and approval NEXT STEPS

11 Q U E S T I O N S