Presentation is loading. Please wait.

Presentation is loading. Please wait.

Directorate for Mathematical and Physical Sciences Facilities and Cyberinfrastructure April 2, 2014 Advisory Committee for Cyberinfrastructure Wayne Van.

Similar presentations


Presentation on theme: "Directorate for Mathematical and Physical Sciences Facilities and Cyberinfrastructure April 2, 2014 Advisory Committee for Cyberinfrastructure Wayne Van."— Presentation transcript:

1 Directorate for Mathematical and Physical Sciences Facilities and Cyberinfrastructure April 2, 2014 Advisory Committee for Cyberinfrastructure Wayne Van Citters Senior Advisor Office of the Assistant Director Mathematical and Physical Sciences

2 Outline Context CI elements of the MPS facilities portfolio Some challenges to ACI collaborations and why they may exist

3 The National Science Foundation Materials Mathematics Astronomy Chemistry Physics 2H 2 O2H 2 + O 2

4 Chemistry (CHE) Materials Research (DMR) Mathematics (DMS) Astronomy (AST) Astronomy (AST) Physics (PHY) Mathematical and Physical Sciences (MPS) 74% IIA, Small Teams 84% IIA Small Teams IIA, Small Teams 63% 30% Facilities IIA, Small Teams 56% 19% Facilities IIA Small Teams 57% 18% Facilities $ 233M$ 229M$ 291M$ 220M$ 251M

5 Astronomy (AST)  Daniel K. Inouye Solar Telescope (DKIST (ATST))  National Optical Astronomy Observatory (NOAO)  Arecibo Observatory  Atacama Large Millimeter Array (ALMA)  Gemini Observatory  Large Synoptic Survey Telescope (LSST)  National Radio Astronomy Observatory (NRAO)  National Solar Observatory (NSO) Physics (PHY)  Ice Cube Neutrino Observatory  Large Hadron Collider (LHC)  Laser Interferometer Gravitational Wave Observatory (LIGO)  National Superconducting Cyclotron Laboratory (NSCL) Materials Research (DMR)  Cornell High Energy Synchrotron Source (CHESS)  National High Magnetic Field Laboratory (NHMFL)  National Nanotechnology Infrastructure Network (NNIN) 57% 30% 19%

6 Sample of Facilities CI Solutions/Needs

7 30% 19% Two Different Budget Lines for Facilities AST PHY DMR Operations (R&RA) ALMA IceCube Major Research Equipment and Facilities Construction (MREFC) DKISTLSST 57%

8 Two Different Budget Lines for Facilities Operations (R&RA) Major Research Equipment and Facilities Construction (MREFC) NSF Budget (millions)  Not-to-exceed cost for a scope delivered on schedule  Resultant intense pressure on Project Managers ARRA

9 POTENTIAL BARRIERS NIH (not the agency!) Natural desire for local control Uncertainty about continuity of service Different cultures Mutual lack of awareness (what ACI can provide; what facility needs) Flat budgets - priority given to staff and instrumentation 9

10 CREDITS Copyrighted material used under Fair Use. If you are the copyright holder and believe your material has been used unfairly, or if you have any suggestions, feedback, or support, please contact ciseitsupport@nsf.gov Except where otherwise indicated, permission is granted to copy, distribute, and/or modify all images in this document under the terms of the GNU Free Documentation license, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled “GNU Free Documentation license” at http://commons.wikimedia.org/wiki/ Commons:GNU_Free_Documentation_License The inclusion of a logo does not express or imply the endorsement by NSF of the entities' products, services, or enterprises.


Download ppt "Directorate for Mathematical and Physical Sciences Facilities and Cyberinfrastructure April 2, 2014 Advisory Committee for Cyberinfrastructure Wayne Van."

Similar presentations


Ads by Google