“INFRASTRUCTURE DEVELOPMENT ROADMAP AND PROGRESS IN INDONESIA” Dedy Supriadi Priatna, Ph.D Deputy Minister of Infrastructure Affairs Ministry of National.

Similar presentations


Presentation on theme: "“INFRASTRUCTURE DEVELOPMENT ROADMAP AND PROGRESS IN INDONESIA” Dedy Supriadi Priatna, Ph.D Deputy Minister of Infrastructure Affairs Ministry of National."— Presentation transcript:

1 “INFRASTRUCTURE DEVELOPMENT ROADMAP AND PROGRESS IN INDONESIA” Dedy Supriadi Priatna, Ph.D Deputy Minister of Infrastructure Affairs Ministry of National Development Planning / Bappenas

2 1. Infrastructure Challenges 2. Mid Term National Development Plan Central Government Financing a. Rupiah b. External Loan/ Grant c. Government Guarantee 4. Public Private Partnership 5. Summary 2

3

4 4 Signal from Asian Economic Growth and Emerging Market becoming at Q3 … Economic Growth 4

5 Infrastructure Financing of other countries (%from GDP) THE PERCENTAGE OF INFRASTRUCTURE FINANCING AND GROSS DOMESTIC PRODUCT IndonesiaAlbaniaRussiaCambodiaKazakhstan Private Govt Source: World Bank 5

6 Actual investments are less than half of the annual requirements to achieve target growth and poverty reduction; So, a Actual investments are less than half of the annual requirements to achieve target growth and poverty reduction; So, a continued push for the development of infrastructure is expected for rapid growth and poverty reduction; Budget for infrastructure only 1 % of GDP, meanwhile requirement about 5 %. Budget for infrastructure only 1 % of GDP, meanwhile requirement about 5 %. Insufficient budget allocation in infrastructure at all levels of government. Fiscal space does not allow all infrastructure needs to be funded by the public sector; From total national budget, 20 % for education sector, repayment of foreign loan 9,8 %, subsidy 16 %, transfer to local goverment 30 %. Thus, the potencial for infrastructure not more than 25 % from national budget or 5% from GDP. Insufficient budget allocation in infrastructure at all levels of government. Fiscal space does not allow all infrastructure needs to be funded by the public sector; From total national budget, 20 % for education sector, repayment of foreign loan 9,8 %, subsidy 16 %, transfer to local goverment 30 %. Thus, the potencial for infrastructure not more than 25 % from national budget or 5% from GDP. Deteriorating quality and shortages of infrastructure are major impediments to growth and recovery; Quality infrastructure services are necessary to sustain growth and maintain or improve competitiveness. And inadequate infrastructure services mean a lower quality of life; However, the huge investment needs in infrastructure during the next five years and beyond, clearly confront us with enormous challenges. 6 Note: Infrastructure: Transport, Power / Energy, Housing, Telecommunication, Water Resources.

7 Growth Competitiveness Index/GCI Ranking ( ) ArgentinaIndonesia Philipine s BrazilKoreaChinaJapan Thailan d Malaysi a  Difficult challenges to promote foreign and domestic investment  National competitiveness is low  Based on World Economic Forum (WEF), Indonesia ranked 55th out of 134 countries. Meanwhile, Malaysia and Thailand ranked 21st and 34th, respectively. Note: In 2003 cover 101 countries, 2004 cover 104 countries, & 2005 cover 117 countries, 2007 cover 131 countries, 2008 cover 134 countries Source: World Economic Forum 7

8 8

9 Argentina Indonesia PhilippinesBrazilKoreaChinaVietnamThailandMalaysia Infrastructure Roads Railroad Port Air Transport Electricity Telephone Sumber: World Competitiveness Report, 2009 – 2010 In 1996, Competitiveness Rating of Indonesia better than China, Thailand, Taiwan, dan Srilanka. This fact indicate that Indonesia Infrastructure development is slowing down Growth Competitiveness Index/GCI Ranked 2009, (out of 134 countries) 9

10 10

11 Housing Problems:  Limited access to land acquisition and legality for low income community  Limited public access to housing financing  Low efficiency level in housing dev’t.  Non-optimal utilization of housing and settlement resources Strategy: Subsidy for Housing Credit for ‘Rumah Sederhana Sehat‘ (RSS) is 685,000 units until The accumulated backlog is expected to continue to occur due to growth of 710,000 new households per year 11 Housing Backlog (in thousand units) Outstanding Ratio for housing credit to GDP USA (47%) Malaysia (27 %) Indonesia (1,8%) Outstanding Ratio for housing credit to GDP USA (47%) Malaysia (27 %) Indonesia (1,8%)

12  Slow growth of improved drinking water coverage, especially piped drinking water  from 18.91% to 47.63% ( )  Supply capacity growth can not keep up with population growth Susenas, BPS, various years 12

13 Government investment is IDR 200/capita/year. If the investment for sanitation infrastructure is around IDR 47,000/capita/year   Increase in community productive time : 34%-79%  Decrease in health cost : 6%-19%  Decrease in medical cost : 2%-5% 13 Impact of Poor Sanitation: 75 % river polluted 70 % ground water polluted 150 thousand peoples died annually by diarrhea For every increment of 1 mg/liter of BOD in river  25% of increase in PDAM cost production from national average tariff Economic loss related to poor sanitation estimated about US$ 6,3 billion annually (2.3% of GDP)

14  Only 20.63% solid waste collected, the remainder is burnt, burried, disposed to rivers, and anywhere  Only 2% of existing Final Disposal Site using sanitary landfill method  Improper solid waste management contributes to global warming  climate change  Other impacts : flood, environmental pollution, public health Persentage of Collected Solid Waste Cities in Indonesia produce solid waste 10 million ton/year 10 million ton of solid waste produce 404 million m3 of metan annually 14

15 15 National Target 75/100 : Year 2020 (75 years after indipendent day) electrification ratio will rise 100 %

16

17 1.Creating noble, moralized, ethical, cultured, and civilized society 2. Creating competitive nation 3. Creating democratic society based on the law 4. Creating the safe, peace, and united of Indonesia 5. Creating fair and equal development 6. Creating harmonized and eternal Indonesia 7. Creating Indonesia to be independent, advance, strong, and prioritizing national interest 8. Creating Indonesia to be participated in international community MISSION VISION ADVANCE, INDEPENDENT, FAIR, WEALTHTY Sufficient and advanced Infrastructure Government focus to the infrastructure development policy formulation, and enhancing private participation (PPP) Development of water resources infrastructure Development of transportation infrastructure Development of post and telecommunication infrastructure Development of energy and electricity infrastructure Development of drinking water provision and sanitation infrastructure Sufficient and advanced Infrastructure Government focus to the infrastructure development policy formulation, and enhancing private participation (PPP) Development of water resources infrastructure Development of transportation infrastructure Development of post and telecommunication infrastructure Development of energy and electricity infrastructure Development of drinking water provision and sanitation infrastructure System of food security is directed to sustain reliability and independency of national food by developing domestic product Fulfillment of housing infrastructure Fulfillment of society basic needs in the form of drinking water and sanitation System of food security is directed to sustain reliability and independency of national food by developing domestic product Fulfillment of housing infrastructure Fulfillment of society basic needs in the form of drinking water and sanitation To utilize the renewable natural resources To manage the non-renewable natural resources to sustain the energy provision To sustain and conserve water resources To mitigate natural disaster according to the Indonesia Geological Condition To utilize the renewable natural resources To manage the non-renewable natural resources to sustain the energy provision To sustain and conserve water resources To mitigate natural disaster according to the Indonesia Geological Condition To decrease the impact of coastal disaster and sea pollution DIRECTION OF LONG TERM DEVELOPMENT PLANNING (RPJP) IN INFRASTRUCTURE DEVELOPMENT 17

18 Current Condition (end of 2009) Guidance 1.Long-term Plan Vision, Mision & Program of Presiden Elect Continuation of unfinished Medium-term Plan (RPJM) 2005 – MDG Target 5.Line Ministry/Agency Strategic Plan 6. World Infrastructure Competitiveness Ranking Target by end of (1) (2) (3) (4)

19 FOCUS AND PRIORITY OF INFRASTRUCTURE DEVELOPMENT FOR Enhancement of infrastructure services according to the Minimum Standard of Services (SPM) o Rehability o Accessibility o Safety 2. Infrastructure support to the enhancement of Real Sector Competitiveness o New development 3. Enhancement of infrastructure investment through PPP 19

20 WATER RESOURCES MANAGEMENT DEV’T TARGET Number of Dam Constructed Number of Small Dam/Ponds Constructed Number of O & M Dams/Ponds Performance Length of Coastal Protection (km) areas protected from flood hazards (thousand ha) Performance Target ,66 m 3 /sec 70,60 m 3 /sec Development of Raw Water Infrastructure Coverage and Improving Raw Water Services Target Improvement of irrigation system (thousands ha) Rehabilitation of irrigation system (thousands ha) O & M irrigation system (thousands ha) Improvement / rehabilitation of swamps (thousands / ha) O & M swamps system (thousands / ha)

21  From 83 % in 2009, National Road targeted 90 % in “Good Condition” and no damaged;  Average vehicle velocity in increase from 44,4 km/hour to 60 km/hour in national road  Share of cargo sea transport incease from : domestic 85, 7 % and export import 9 % in 2009 ; increase 100 % and 12,5 % respectively in 2014  Market Share of Railway Transport : Freight : from 0,6 % in 2009 to 7 % in 2010 and passenger from 6 % in 2009 to 23% in 2014  Keep growth of air transport passenger : domestic 9,78 % /year and non domestic 12,3%/year; 21

22  Access to drinking water to 70% of total population which is divided into detailed target: 32% of piped system and 38% of improved non-piping system  The realization of Open Defecation Free condition (BABS), which is marked by the available access to off-site wastewater management system for 10% of the total population, either through a off-site wastewater treatment system at city-scale (5%) or communal scale (5%) and access provision and quality improvement of adequate on-site wastewater management systems for 90% of the total population  Access to solid waste management system for 80% of urban household  The reduction of inundation area of hectares in 100 strategic urban areas 22

23  Energy Mix  Oil Utilization : 38,33 %  New & Renewable Energy Utilization: 16,1 %  Energy Elasticity : 1,48  Natural gas infrastructure development e.g. city gas distribution, natural gas station for transportation (SPBG)  Power plant additional capacity ± MW  Electrification Ratio : 80,0 %  Rural Electrification Ratio : 98,9 % 23

24 24 GOVERNMENT PLAN Central Government Financing (APBN) Public Private Partnership (PPP) Government Plan: finance by private execute by private Public Private Partnership (PPP) Government Plan: finance by private execute by private External Loans/Grants (PHLN) RUPIAH Blue Book PPP Book GOVERNMENT GUARANTEE FOR SOE’S PROJECT

25  Rupiah  External Loan/ Grant  Government Guarantee

26 Growth (%) 5,15,15,56,26,87,37,7 Nominal GDP (Rp Trillion) 5.206, , , , ,09.523,3 Infrastructure Needs 5% GDP (Rp. Trillion) 260,3 299,5 335,9 381,6 430,6476,2 Total of Infrastructure Needs (2010 – 2014) Rp ,7 Trillion 26

27 *) exclude PSO for PT. KAI, PT. Pelni, PT. Posindo, TVRI dan RRI TOTAL (Rp. Trillion) Central Goverment * 82,65 104,37 105,30 108,24 110,47 511,02 Local Goverment75,7177,6179,5581,5484,19398,59 Provincial16, ,82 Regency/Municipality58,7460,2161,7263,2664,84308,77 PPP 10, ,11407,11 Private / SOE 16,8819,69 25,3130,94112,47 TOTAL OF INFRASTRUCURE INVESTMENT 185,24201,66204,53215,09622, ,19 (Rp. Triliun)

28 ESTIMATION OF INFRASTRUCTURE INVESTMENT NEEDS FINANCING GAP is expected to be funded through PPP development, CSR, and community participation Needs Rp. 1,429 Trillion 28  Financing Gap (Rp. 519,58 trillion) 36,55 %  Govt ability (central % Local Gov’) (Rp. 902,3 trillion) 63,45 %

29 (*) Including Search and Rescue Agency MINISTRY/AGENCY Total MIN. OF PUBLIC WORKS , , , , , ,3 MIN. Of TRANSPORTATION(*) , , , , , ,7 MIN. Of ENERGY AND MINERAL RESOURCES , , , , , ,0 MIN. Of COMMUNICATION AND INFORMATICS 2.811, ,63.616,54.107,24.432, ,2 STATE MIN. Of HOUSING 2.395,72.759,54.199,42.065,12.274, ,5 BPLS 1.216,01.286,01.456,01.516,01.737, ,0 SEARCH AND RESCUE AGENCY 565,71.163,8798,6902,81.046,84.477,7 TOTAL , , , , , ,2 29

30 *)Exclude financing from local goverment, private, and SOE **) Potential PPP Poject Rp 340 billion for water supply under DG. Housing and Resetlement. Currently, Water Conveyance in Banten (Karian) and Lampung are proceed as PPP project. SECTOR PUBLIC PRIVATE TOTAL RUPIAH PHLN TOTAL INFRASTRUCTURE , , , , ,6 Min. Of Public Works , , , , ,3 DG. Water Resources39.355, , ,50,0**)59.949,5 DG. Highway , , , , ,9 DG. Cipta Karya (Housing and Resetlement ) , , ,07.735, ,0 Others (supporting program)10.435,90, ,90, ,9 State Min. of Housing ,50, ,50, ,5 Ministry of Transportation98.113, , , , ,1 DG. Land Transportation11.401,0450, ,01.228, ,0 DG. Railway19.992, , , , ,5 DG. Sea Transportation28.044,75.000, ,75.455, ,2 DG Air Transportation19.135,6400, , , ,4 Others (supporting suporting)19.540,00, ,00, ,0 Ministry of Energy and Mineral Resources80.821,00, , , ,0 Min istry of Communication and Informatics ,0 830, ,20, ,2 Search and Rescue Agency4.052,7425,04.477,70,04.477,7 BPLS 7.210,80, ,80,07.210,8 30

31 31 Minister of FinanceMinister of NDP M/A/LG/SOE Proposals RKPLN (Borrowing Strategy) Donor/Lender Lending Program Evaluation DRPHLN-JM (Blue Book) Synchronization of projects Preparation of Detailed Activity Plan Indications of the LG/SOE’s financial capacity Request for Indications of the LG/SOE’s financial capacity Enhancing Preparedness Readiness DRPPHLN (Green Book) List of Projects Funding Commitment Indication Fund Allocation Loan/Grant Agreement RPKPHLN (Brown Book) Risk Management Plan for Project Implementation Projects of LG/SOE Projects of M/A 31

32 32  The Blue Book is in line with the period of medium-term development plan (5 years), issued after RPJM completed and could be up-dated if needed.  Currently in transition period, thus the new Blue Book cover period of  Contains list of projects that are viable to be funded by external loans / grants and used as basis for preparing development cooperation with Donors/Lenders  The projects should :  be in line with RPJM and Borrowing Strategy (RKPLN)  be proposed and signed by Minister / Chairman of Agencies / Head of Local Governments / Director of State Own Enterprises ( One Gate Policy)  have approval letter from local parliament for project proposed by LG, and from Ministry of SOE for project proposed by SOE  Only projects listed in DRPHLN-JM will be proceed to financed by foreign assistance.

33 33  Contains list of projects that already have indicative funding sources from lender/donor and will be negotiated within 1-2 year ahead.  The project listed in DRPPHLN should meet certain readiness criteria and ready to be Appraised, and will be put in Daftar Kegiatan (Definite Projects List) after having commitment for funding by lender/donor and put in corresponding annual work plan. Readiness Criteria:  detailed activity plan has already been compiled;  performance indicators on implementation of projects for carrying out monitoring and evaluation have already been compiled;  a statement is already available on the willingness of the Regional Government/BUMN to prepare funds for implementing projects that constitute the tasks of the relevant Regional Government/BUMN, including the availability of counterpart funds, in accordance with the schedule of implementation;  counterpart fund for the first-year implementation of the project has already been prepared in the Work Plan of the State Ministry/Agency/Regional Government/BUMN;  there is already the plan on procurement of land and/or on resettlement, including the availability of funds that are needed in the Work Plan of the State Ministry/Agency/Regional Government/BUMN;  the draft on the formation of the Project Management Unit and the Project Implementation Unit has already been compiled;  projects management plan has already been compiled

34 34  Contains further information of signed and agreed project for project implementation.  Source of information for :  Monitoring and evaluation during implementation period.  Preparing DIPA (Government annual budget).  Assist Executing Agencies to implement projects in timely manner.  Should be prepared 3 months after Loan Agreement was signed (the latest).

35 35 SEKTOR Blue Book , Revisision I and II Project Cost Loan Grant Counterpart Fund Total Ministry of Transportation Ministry of Public Works Ministry of Communication and Information Ministry of Energy and Mineral Resources State Ministry of Housing PT Merpati PT. KAI PT PLN TOTAL

36 36 SECTOR Project Cost Loan Grant Counterpart Fund Total Ministry of Transportation 1.818, , ,30 Ministry of Public Works 4.517,06 11,00 574, ,20 Ministry of Communication and Information 74,85 - 7,49 82,33 Ministry of Energy and Mineral Resources and PT PLN 5.206,80 10,50 700, ,30 State Ministry of Housing 300,00 - 6,00 306,00 TOTAL ,51 21, , ,13

37 AS OF 31 st DESEMBER

38 Note : Update 31 tt Desember 2009 AS OF 31 ST DESEMBER

39 AS OF 31 ST DESEMBER

40 40

41 41 GOVERNMENT GUARANTEE PROJECTS BANK SOE Loan Example : MW PLN Project Phase I

42

43  Transportation infrastructure  Road infrastructure  Infrastructure for the distribution of water  Infrastructure for drinking water  Waste water infrastructure  Telecommunication infrastructure  Electrical power infrastructure  Oil and natural gas infrastructure. 43

44 44 Selection and Priority Complete Test Tender Process Negotiation Contract Management Project Study: Need Analysis Multi Criteria Analysis Value for Money Analysis Public Consultation Identify and set priority project Feasibility study: Project Technical Evaluation Social Cost Benefit Analysis Social and Environment Analysis Financial Analysis Risk Analysis and Study Identify the need of Government Support. Choose PPP Form Set Project to be tendered Build Transaction Team Prepare Offered Document Pre-Qualification Tender Participants Do the Tender Evaluate Tender Set Winner Candidate Build Negotiation Team. Prepare Negotiation Strategy Prepare Risk Allocation Limit Negotiate Partnership Agreement Draft Set Winner Make Sure and Monitor Financial Closing, Construction, Commissioning, Operation, Monitoring, and diversion in the end of concession.

45  Government realize the importance of PPP to cover infrastructure financing gap;  Measures have been taken on:  Policy and regulatory framework  Institutional and financial framework  Project development facilities  Government is now in the final stage of completing the framework by establishing the PPP Central Unit (PPP-CU) and launching of the PPP Book. 45

46  PPP as part of Government policy package 2006  Issuance of Presidential regulation 67/2005 that governing the process of developing PPP projects;  Issuance of Presidential regulations 36/2005 and 65/2006 on Land Acquisition to outline the rules and procedures for infrastructure projects serving public purpose;  Minister of Finance Decree No. 38/2006 on risks management of PPP projects  Various ministerial decrees related to PPP implementation 46

47  The Committee on the Policy for the Acceleration of Infrastructure Provision (KKPPI) established under PD 42/2005;  A Risk Management Unit on Fiscal Support already up and running since 2006 in the Ministry of Finance.  PT. SMI/Indonesia Infrastructure Financing Faciliy (IIFF) established in February 2009  PDF to fund PPP projects preparation  PPP Nodes established in the (MEMR, MPW and MOT)  PPP Units in various Local Governments  PPP-CU in Bappenas issued PPP Book  Infrastructure Guarantee Fund (under preparation) 47 Infrastructure Sector Ministries (MPW, MOT, MEMR, MCI) KKPPI CMEA, Bappena s MOF PPP Nodes (PPP Units) Project Identification, Preparation, Monitoring & Quality Control: -- Screening -- Due Diligence -- Bid Documents -- Transaction & Post- transaction Process Secretariat/P3CU Policy Analysis, Development and Planning & Coord. Monitoring & Quality Ctrl Identify Projects requiring Government Support Resolving cross-sector issues Risk Mgt Unit Assess Government Support Issue Guarantee Fund Project Dev.Fac. & PPP Book IIFF, Land Fund, etc. MOHAMSOE SOEs Project Dev’t Project Impl. & Monitoring Local Gov’t & ROEs Project Development Project Impl. & Monitor

48  Direct Support (PD 36/2005 and PD 65/2006)  Land  Part of Construction Costs  Government Guarantee (MoFD 38/2006)  Political Risks  Project Performance Risks  Project Location Risks  Project Operational Risks  Demand Risks 48

49  Based on Presidential Instruction (Inpres) No. 5/2008 on Economic Development Focus  To confirm list of PPP Projects in the Government pipeline;  To ensure that the PPP project planning is transparent and preparations are done properly;  As an instrument to monitor the progress of PPP implementation;  As a mean for cross-sector and inter-region synchronization and coordination for PPP project preparation  As a mean for Public Consultation on PPP projects 49

50 50 POTENTIAL PR0JECTS PRIORITY PROJECTS PROJECTS READY FOR OFFER 1.Conformity with the National/Regional Medium Term Development Plan and the infrastructure sector’s strategi plan; 2.Conformity of the project’s location with the spatial plan; 3.Linkage between the infrastructure sector and regional area; 4.Cost recovery potential 1.Included in the list of PPP Potential projects or proposed by the contracting agency as unsolicited project; 2.Pre-FS shows that the project is feasible (legal, technical, economic and financial); 3.Project risks identified and allocated properly; 4.PPP Modality defined; 5.Government support identified; 1.Bidding documents completed; 2.PPP Procurement Team formed and capable to transact project; 3.Procurement schedule defined and agreed upon; 4.Government support (if applicable) has been approved and allocated

51 51

52 52

53 53

54 54

55 55

56

57  Opportunities are widely open for China Business entity and Indonesian partner in Infrastructure Development in Indonesia, i.e consultancy, EPC (Engineering, Procurement, & Construction), Supplier, Investment, etc.  The involvement of China Business entity and Indonesian partner could be in the area of:  Projects financed by China Loans and Grants  Projects financed by multilateral donor such as World Bank, ADB, EU, etc  PPP Projects 57

58 THANK YOU

59 59

60 60

61 61

62 62

63 63

64 64

65 65 PROJECTS LIST OF MW STAGE II PLN (STATE OWN ENTEPRISE OF ELECTRICITY) PROJECTS NO PROJECTPROVICECAPACITY 1 Geo PP Tangkuban Perahu I Jawa Barat2 x 55 2 Geo PP Kamojan 5 dan 6 Jawa Barat1 x 40 3 Geo PP ljenJawa Timur1 x 40 1 x 60 4 Geo PP Iyang ArgopuroJawa Timur2 x 55 5 Geo PP Wilis/NgebelJawa Timur1 x 55 6 Geo PP Sungai PenuhJambi3 x 55 7 Geo PP HululaisBengkulu2 x 55 8 Geo PP Kotamobagu 1 dan 2Sulawesi Utara2 x 20 9 Geo PP Kotamobagu 3 dan 4Sulawesi Utara2 x Geo PP SembalunNusa Tenggara Barat2 x Geo PP TulehuMaluku2 x Hydro PP Upper Cisokan Jawa Barat4 x Hydro PP Asahan 3 Sumatera Utara2 x Coal FPP Indramayu Jawa Barat1 x Coal FPP Pangkalan Susu 3 dan 4 Sumatera Utara2 x Coal FPP Sampit Kalimantan Tengah2 x Coal FPP Kotabaru Kalimantan Selatan2 x 7 18 Coal FPP Parit Baru Kalimantan Barat2 x Coal FPP Takalar Sulawesi Selatan2 x Gas FPP Kaltim (Peaking) Kalimantan Timur2 x Gas FPP Muara Tawar Add-On 2, 3 dan 4 Jawa Barat1 x x 350

66 66 PROJECTS LIST OF MW STAGE II PRIVATE PROJECTS NOPROJECTPROVICECAPACITY 1 Geo PP Rawa Dano Banten1 x Geo PP Cibuni West of Java1 x 10 3 Geo PP Cisolok-Cisukarame West of Java1 x 50 4 Geo PP Darajat West of Java2 x 55 5 Geo PP Karaha Bodas West of Java 1 x 30 2 x 55 6 Geo PP Patuha West of Java3 x 60 7 Geo PP Salak West of Java1 x 40 8 Geo PP Tampomas West of Java1 x 45 9 Geo PP Tangkuban perahu II West of Java2 x Geo PP Wayang Windu West of Java2 x Geo PP Baturaden Central of Java2 x Geo PP Dieng Central of Java 1 x 55 1 x Geo PP Guci Central of Java1 x Geo PP Ungaran Central of Java1 x Geo PP Seulawah Agam Central of Java 1 x Geo PP Jaboi Nanggroe Aceh Darussalam1 x 7 17 Geo PP Sarula 1 North of Sumatera3 x Geo PP Sarula 2 North of Sumatera2 x Geo PP Sorik Merapi North of Sumatera1 x Geo PP Muaralaboh West of Sumatera2 x Geo PP Lumut Balai Soulth of Sumatera4 x Geo PP Rantau Dadap Soulth of Sumatera2 x Geo PP Rajabasa Lampung2 x Geo PP Ulubelu 3 dan 4 Lampung2 x Geo PP Lahendong5 dan 6 North of Sulawesi2 x Geo PP Bora Sulawesi Tengah1 x 5 27 Geo PP Merana/Mesaingi Sulawesi Tengah2 x Geo PP Mangolo Sulawesi Tenggara2 x 5 29 Geo PP Huu Nusa Tenggara Barat2 x Geo PP Atadei Nusa Tenggara Timur2 x 2.5

67 67 31 Geo PP Sukoria Nusa Tenggara Timur2 x Geo PP Jailolo Maluku Utara2 x 5 33 Geo PP Songa Wayaua Maluku Utara1 x 5 34 Hydro PP Simpang Aur Bengkulu2 x6 2 x 9 35 Coal FPP Bali Timur Bali2 x Coal FPP Madura Jawa Timur1 x Coal FPP Sabang Nanggroe Aceh Darussalam2 x 4 38 Coal FPP Nias Sumatera Utara2 x 7 39 Coal FPP Tanjung Pinang Kepulauan Riau2 x Coal FPP Tanjung Balai Karimun Kepulauan Riau2 x Coal FPP Tanjung Batu Kepulauan Riau2 x 4 42 Coal FPP Bangka Bangka Belitung2 x Coal FPP Ketapang Kalimantan Barat2 x Coal FPP Petung Kalimantan Timur2 x 7 45 Coal FPP Melak Kalimantan Timur2 x 7 46 Coal FPP Nunukan Kalimantan Timur2 x 7 47 Coal FPP Kaltim Kalimantan Timur2 x Coal FPP Putussibau Kalimantan Barat2 x 4 49 Coal FPP Kalsel Kalimantan Selatan2 x Coal FPP Tahuna Sulawesi Utara2 x 4 51 Coal FPP Mautong Sulawesi Tengah2 x 4 52 Coal FPP Luwuk Sulawesi Tengah2 x Coal FPP Mamuju Sulawesi Barat2 x 7 54 Coal FPP Selayar Sulawesi Selatan2 x 4 55 Coal FPP Bau-Bau Sulawesi Tenggara2 x Coal FPP Kendari Sulawesi Tenggara2 x Coal FPP Kolaka Sulawesi Tenggara2 x Coal FPP Sumbawa Nusa Tenggara Barat2 x Coal FPP Larantuka Nusa Tenggara Timur2 x 4 60 Coal FPP Waingapu Nusa Tenggara Timur2 x 4 61 Coal FPP Tobelo Maluku Utara2 x 4 62 Coal FPP Tidore Maluku Utara2 x 7 63 Coal FPP Tual Maluku2 x 4 64 Coal FPP Masohi Maluku2 x 4 65 Coal FPP Biak Papua2 x 7 66 Coal FPP Jayapura Papua2 x Gas FPP Senoro Sulawesi Tengah2 x 120

68 68 67 Coal FPP Nabire Papua2 x 7 68 Coal FPP Merauke Papua2 x 7 69 Coal FPP Klalin (Sorong) Papua Barat2 x Coal FPP Andai Papua Barat2 x 7 71 Gas FPP Bangkanai Kalimantan Tengah2 x Gas FPP Senoro Sulawesi Tengah2 x 120 PROJECTS LIST OF MW STAGE II PRIVATE PROJECTS (3)