Presentation is loading. Please wait.

Presentation is loading. Please wait.

SEESIM 14 UNCLASSIFIED 1 POA&M DatesTaskPOCStatus 25 Aug 13DRAFT EXSPEC DocumentOps GroupCompleted 24-27 Sep 13Exercise Specification Conference (ESC)AllCompleted.

Similar presentations


Presentation on theme: "SEESIM 14 UNCLASSIFIED 1 POA&M DatesTaskPOCStatus 25 Aug 13DRAFT EXSPEC DocumentOps GroupCompleted 24-27 Sep 13Exercise Specification Conference (ESC)AllCompleted."— Presentation transcript:

1 SEESIM 14 UNCLASSIFIED 1 POA&M DatesTaskPOCStatus 25 Aug 13DRAFT EXSPEC DocumentOps GroupCompleted 24-27 Sep 13Exercise Specification Conference (ESC)AllCompleted 15 Dec 13Install JEMM server in CroatiaHN 15 Dec 13Create JEMM accountsHN 21 Dec 13Updated EXSPEC DocumentOps Group 17 Jan 14Identify billets in Manning DocumentAll 21-24 Jan 14Initial Planning Conference (IPC)All 22-23 Jan 14MEL/MIL Development WorkshopOps Group 23 Mar14Develop Scenario (Road to Crisis)Ops Group 1-4 Apr 14Main Planning Conference (MPC)All 2-3 Apr 14MEL/MIL Development WorkshopOps Group 26 Apr 14DRAFT Exercise Control PlanOps Group 26 Apr 14DRAFT Exercise Manning DocumentAll 26 Apr 14DRAFT EXCON Training PlanOps Group

2 SEESIM 14 UNCLASSIFIED 2 POA&M (cont.) DatesTaskPOCStatus 26 Apr 14DRAFT EXCON Architecture, Floor PlansOps Group 26 May 14Final Information Management (IM) PlanInfo Manager 3 Jun14Identify names for Manning DocumentAll 3-5 Jun 14Final Coordination Conference (FCC)All 3-5 Jun 14Technical Training in CroatiaTech Group 15 Jun 14Updated Exercise Manning DocumentAll 15 Jun 14Final Exercise Control PlanOps Group 15 Jun 14Updated EXCON Training PlanOps Group 15 Jun 14Final EXCON Architecture, Floor PlansOps Group 15 Jun 14Final EXSPEC DocumentOps Group 1 Sep 14Comms “Hot” to All SitesTech Group 15-31 Aug 14Equipment Installation in CroatiaTech Group 8-12 Sep 14Remote Site Installations and TestingTech Group 10-12 Sep 14Site Manager and AAR Training in CroatiaSM / AAR

3 SEESIM 14 UNCLASSIFIED 3 POA&M (cont.) DatesTaskPOCStatus 15 Sep 14Final Collection Management Plan (CMP)AAR 15-17 Sep 14Final Setup and TestingTech Group 18-19 Sep 14End-to-End TestTech Group 18-19 Sep 14JTLS TrainingTech Group 22 Sep 14EXCON MINIEXAll 22 Sep 14EXCON Main TrainingAll 23-26 Sep 14Exercise ExecutionAll 26 Sep 14Distinguished Visitor (DV) DayAll 26 Sep 14Post Exercise HotwashAll 26 Sep 14After Action Review (AAR)AAR 26 Sep 14Closing CeremonyAll 12 Oct 14First Impressions Report (FIR)AAR 26 Dec14Final Exercise Report (FER)AAR


Download ppt "SEESIM 14 UNCLASSIFIED 1 POA&M DatesTaskPOCStatus 25 Aug 13DRAFT EXSPEC DocumentOps GroupCompleted 24-27 Sep 13Exercise Specification Conference (ESC)AllCompleted."

Similar presentations


Ads by Google