Presentation is loading. Please wait.

Presentation is loading. Please wait.

AC Transit SATCOM Program Route and Schedule Adherence Overview

Similar presentations


Presentation on theme: "AC Transit SATCOM Program Route and Schedule Adherence Overview"— Presentation transcript:

1 AC Transit SATCOM Program Route and Schedule Adherence Overview
AC Transit SATCOM 2000 SYSTEM - PRELIMINARY DESIGN REVIEW AC Transit SATCOM Program Route and Schedule Adherence Overview

2 RSA Information on CAD PERFORMANCE QUEUE INDICATORS
Provides status-only information about each Route/Block Display sorted on any column Default is priority of Status Display can be filtered Default is all Route/Blocks (Filter is Off), or route-based Work Assignment Route/Block status by user-defined sort and filter criteria Double click to display schedule data for Route/Block 13 columns of data, vertical and horizontal scroll bars

3 RSA Information on AVL AVL INDICATORS
(Configurable) Vehicle Icon color indicates vehicle’s status: Red Emergency Alarm Sea Green Unreachable (No Response) Green Normal Yellow Ahead of Schedule Orange Behind Schedule Cyan Off Route Purple In a Late Logoff condition Gray Logged Off Pink No Schedule (Special Block) Navy In Deadhead AVL colors match CAD colors, except ‘Normal’, shown as white on Performance Queue

4 Text Report – RSA by Trip

5 Text Report – RSA Detail

6 Text Report – RSA by Timepoint

7 Graphic Report – Route & Schedule Adherence


Download ppt "AC Transit SATCOM Program Route and Schedule Adherence Overview"

Similar presentations


Ads by Google