Presentation is loading. Please wait.

Presentation is loading. Please wait.

Royal Building System General RBS Aplications Construction Process

Similar presentations


Presentation on theme: "Royal Building System General RBS Aplications Construction Process"— Presentation transcript:

1 Royal Building System General RBS Aplications Construction Process
Specifications and Construction details Approvals and Certifications Royal Andina kits Royal Building System

2 General 1.1. Company-Policies 1.2. Products Lines
RBS Construction System Properties and Advantages Construction Process Construction Process-Video Institutional Video General

3 Royal Andina S.A. We are a company dedicated to make PVC panels and profiles to offer a variety of solutions for the construction field. Our products are made with Canadian technology and excellent quality. From our plant in Cartagena we attended the Andina market, Central America and the Caribbean. Our best reference is the testimony of our costumers and our projects since Our commitment is simple: complete satisfaction to our costumers. We provide the ideal solution even for the most demanding projects.

4 Royal Andina Central and South America

5 RBS CONSTRUCTION SYSTEM
PRODUCT LINES RBS CONSTRUCTION SYSTEM Window Systems

6 RBS Construction System
Electric Ducts or hydraulics Concrete or empty with metallic structure Steel of reinforcement PVC Panel The RBS system is made from PVC panels ready to assembly for any type of project. Depending on the project, the width or thickness could be less than 100 mm or 64 mm. Reinforced concrete filling for permanent construction or reinforced metal frame for reusable constructions.

7 RBS Construction System
64mm System Basic Module 64mm System Connector Panel 100mm System Basic Module Panels Connector 100 mm System. Versatile and easy to project

8 Product properties Durable Waterproof Ignífuge and self-extinguishable
UV protection Aseptic Corrosion resistant (oxide), salinity, chemical and microorganisms Homogeneous quality

9 Advantages of RBS System
Quick On –site Assemblyn Acoustic and thermal insulation Resistant to extreme weather condiions Rodent/Pest Resistant Can be designed to handle earthquake and hurricane conditions Finished Adjust to any design Easy to maintain & clean Compatible with others constructions Long-Term Durability: Will not rust, corrode, flake, peel or rot! Condominium after hurricane Michelle, built with RBS System, October 2001

10 Building Preparations
Walls filled with concrete Walls filled with steel bars

11 RBS Aplications 2.1. Social Housing 2.2. Private Housing
Education Health Industry and Commerce Camps Hotels Military Installations Other applications RBS Aplications

12 Social Housing

13 Social Solutions for the community
The properties and advantages of the RBS system offer an optimal alternative for the construction of social housing: Worthy High quality Finished Lasting and Comfortable Waterproof and UV protection remains stable over time.

14 Advantages RBS SYSTEM TRADITIONAL Finished remains stable over time

15 Advantages La Habana, Cuba The durability of the materials can be seen when you compare our products with others

16 Advantages RBS SYSTEM TRADITIONAL Better finishes

17 Advantages RBS SYSTEM TRADITIONAL The System doesn´t crack after the construction is settles down

18 Housing 24 units of 42 Sqm. 12 years built Houses, Cartagena, Colombia

19 Housing 50 units 65 Sqm. Social Housing, Curacao

20 Housing 120 apartments 45 Sqm. Tirima Project, Venezuela

21 Housing 150 units 60 Sqm. House in Venezuela

22 Housing 200 units 100 Sqm. area House in Santa Lucía,Venezuela

23 Housing 300 units 62 Sqm. House in Isla Margarita, Venezuela

24 Housing 80 units 65 Sqm. Engineer houses, Changuinola, Panamá

25 Housing 56 Sqm. houses Condominium project, Rep. Dominicana

26 Housing Apartments, La Habana, Cuba

27 Housings Las Lomas, México

28 Housing Condominium project, St. Marteen

29 Private Housing

30 Housing House in San José, Costa Rica

31 Housing House in San José, Costa Rica

32 Housing House in Cajicá, Colombia

33 Housing House, Colombia

34 Housing Country house, Rionegro, Colombia

35 Housing La Arena house in Isla Del Rosario, Colombia

36 Housing Summer house, Medellín, Colombia

37 Education

38 Education “Infrastructure for educational areas”
The RBS system adapts to both rural and urban areas temporarily or permanently Rapid execution Quality of materials Low cost and low maintenance Fixed cost Adapts thermally to regional climates In addition, the RBS system provides an integral finish for immediate use, and allows to incorporate other finishes highlighting the sense of the community for the educational areas.

39 Education School in Buenos Aires (Citibank), Quibdó, Colombia

40 Education School in Buenos Aires (Citibank), Quibdó, Colombia

41 Education Schools (Citibank), Providencia, Colombia

42 Education El Divino Niño school (Citibank), Marinilla, Colombia

43 Education Pedagogic unit, Cota, Colombia

44 Education UNICEF Emilio Carvajal school, Buenaventura, Colombia

45 Education Ferrostal school , Palonegro, Quindio, Colombia

46 Education Several projects, Quindío, Colombia
Santa Maria Micaela school Adoratrices , Armenia Hermanitas de la Anunciación, Calarcá Several projects, Quindío, Colombia

47 Education Plan Padrino school, B/ventura, Colombia

48 Education School Fundación Pies Descalzos, Bogotá, Colombia

49 Education Paujil school, Caquetá, Colombia

50 Education OIM – Timbiquí rural school, Cauca, Colombia

51 Education OIM – Divina Pastora, Cucutá, Colombia

52 Education Classroom , Nueva Granada school, Bogotá, Colombia

53 Education San Miguel school, La Calera, Colombia

54 Education Los Pinos school, Bogotá, Colombia

55 Education Universidad Del Norte, Barranquilla, Colombia

56 Education University classrooms, México

57 Education Schools, México

58 Education Coliseum, USA

59 Health

60 Advantages of RBS System
The materials used by the RBS system, offer construction free of mold and low maintenance. The thermal and acoustic characteristics of the RBS system provides comfort in any climate regardless of geographical location

61 Health Medical center in Acacias, Meta, Colombia

62 Health Hospital in Bahía Solano, Colombia

63 Health Cafesalud Medical center, Bogotá, Colombia

64 Health Red Cross, La Tebaida, Colombia

65 Health Administrative offices COACEMED, México

66 Health Computer center COACEMED, México

67 Industry and Commerce

68 Construction Process 2. Walls panels 1. Foundation
3. Metal or concrete structure

69 Construction Process 4. Wall assemble 5. Section hoisted
6. Union between sections

70 Proceso Constructivo Detalle fijación muros a estructura
Contraflambeos para nivelar los largueros en grandes luces La frecuencia de los refuerzos se determina según la zona eólica Largueros Aspecto muro instalado Detalle fijación muros a estructura

71 Construction Process 7. Hydraulic Inst. 8. Electric Inst.
9. Cover structure 11. Finishes 10. Roofing

72 Industry Prince Plastics plant, Canadá

73 Industry Agricultural Warehouse, USA

74 Industry Biofilm plant Sqm, Colombia

75 Industry El Trébol, industrial warehouse, Colombia

76 Industry Lime warehouse, Bogotá, Colombia

77 Industry Refisal, Cartagena, Colombia

78 Industry Minipak plant, Colombia

79 Industry Warehouse project

80 Industry Several projects, North America

81 Industry Innovatec offices, Cali, Colombia

82 Agriculture Industry Dairy farms, Canadá

83 Commerce Supermarket Olímpica, Colombia

84 Commerce Ford Sales Center, México

85 Camps and Accommodations

86 IT DOESN´T MATTER WHERE YOU NEED US,
RBS CONSTRUCTION SYSTEM IT DOESN´T MATTER WHERE YOU NEED US, WE´´LL BE THERE We will be there!

87 Construction Process Floor and walls assemble systems 1. FOUNDATION
2. PLATE 3. INSTALLATIONS 4. WALL STRUCTURE 5. WALL ASSEMBLE 6. FRAMES INSTALLATION Floor and walls assemble systems

88 Construction Process Installations, roofing and finishes
7. HYDRAULIC INST. 8. ELECTRIC INST. 9. COVER STRUCTURE 10. ROOF ASSEMBLE 11. FINISHES Installations, roofing and finishes

89 Camps Pluspetrol camp, Pisco, Perú

90 Camps Trompeteros project, Perú

91 Camps Yanacocha, Perú

92 Camps Camisea project, Perú

93 Camps Airport project, Arequipa, Perú

94 Camps Houses in Changuinola, Panamá

95 Camps Military camps, Colombia

96 Camps Houses for the Army, Melgar, Colombia

97 Camps Cerrejón, Guajira, Colombia

98 Camps Conconcreto Camps, Medellín, Colombia

99 Hotels

100 Hotels Los Delfines Hotel, San Andrés Isla, Colombia

101 Hotels Fiscal Hotel, Cuba

102 Hotels Nitana Hotel, Coveñas, Colombia

103 Hotels Morritt’s Grand Resort, Islas Cayman

104 Military Installations

105 Military Installations
Administrative office, the Fourth military division, Colombia

106 Military Installations
Hangar in Juanchaco, Colombia

107 Military Installations
Cotecmar hangar, Colombia

108 Military Installations
Gasur control tower, Colombia

109 Camps Military camps, Colombia

110 Camps Army housing, La Macarena, Colombia

111 Housing Fiscal homes, Turbo, Colombia

112 Other Applications

113 Otther Applications Prodesa sales center, Colombia

114 Other Applications Carwash, Canadá

115 Other Applications Gas stations, Brasil

116 Other Applications Offices, Bogotá - Colombia

117 Other Applications Oxicol offices, Cartagena, Colombia

118 Other Applications Construction in flood zone, Panamá

119 Other Applications Portable toilet, Colombia

120 Other Applications Portables toilets, Argentina

121 Other Applications Booth Royal Andina Expoconstrucción, Bogotá, Colombia

122 Other Applications Church in Bolívar, Colombia

123 Other Applications Refrigerators, Colombia

124 Other Applications Swimming pools, Colombia

125 Other Applications Swimming pools, Colombia

126 Other Applications Several

127 RBS Construction Process
Concrete walls Empty walls with metallic structure RBS Construction Process

128 Content 3.1. Concrete walls 3.1.1 System description
mm and 100 mm systems Preliminaries Foundation Plan location Walls assemble Installations Steal reinforcements Wall bracing Frames installation Concrete placement Flooring plates Roof Installation 3.1. Concrete walls

129 RBS CONSTRUCTION SYSTEM
Electric Ducts or hydraulics Concrete or empty with metallic structure Steel of reinforcement PVC Panel The RBS system is made from PVC panels ready to assembly for any type of project. Depending on the project, the width could be less than 100 mm or 64 mm, reinforced concrete filling for permanent construction or reinforced metal frame for reusable constructions.

130 64 and 100 mm Systems 64 mm SYSTEM 100 mm System
64 mm SYSTEM Basic Module 64 mm SYSTEM Connector Panel 100 mm SYSTEM Basic Module Panels Connector 100 mm System

131 Preliminaries Preparation of the ground and installations
The structural design of the floor tile is the same as any other system, it is made base on the weight capacity of the floor. The electric, hydraulic and sanitary installations including the steel reinforcement must stay inside the walls Preparation of the ground and installations

132 Preliminaries Royal material download to the construction site
The PVC profiles must be placed according to the size on the construction site, this will be warranty The best performance. Royal material download to the construction site

133 Foundation FOUNDATION Plate detail The foundation must be well level
RBS WALLS GUÍDE GUÍDE The foundation must be well level REINFORCING STEEL BAR ANCLAJE DE VARILLAS PLATE FOUNDATION

134 Replanteo Muros DEMARCACION MUROS
Imprescindible uso de la cimbra para asegurar la posición de los muros y la colocación de las guías. Placa lista para la colocación de los paneles de muros

135 Ensamble Muros IDENTIFICACIÓN PIEZAS Todos los elementos que componen
Empresa Proyecto Tipo de Panel Longitud del Panel Todos los elementos que componen un kit están marcados y en el plano se especifica su ubicación.

136 Walls assembly

137 Ensamble Muros La verticalidad de las juntas deberá revisarse al plomar los muros en uno y otro sentido. Es conveniente contemplar la escuadra de los muros. 0.80 1.0 0.60 EJEMPLO DE MAL PLOMADO DE MUROS 90° EJEMPLO DE VERTICALIDAD DE ESTRÍAS ENTRE PANELES Y CONECTORES EJEMPLO DEL TRAZO DE ESCUADRA

138 Ensamble Muros Ya completo el armado de los muros se procede a la nivelación y plomado de los mismos verificando las escuadras que se deben tener entre muros y entre losa de piso y muros. VISTA EN PLANTA VISTA EN ALZADO MURO ROYAL MURO ROYAL ESCUADRA 5 4 LOSA DE PISO 90° 3 90° MURO ROYAL

139 Hydraulics Installations

140 Electric Installations
Installation of switch and outlet boxes

141 Steel Reinforcements Depending of structural design, ¾ or ½ rod are used as vertical or horizontal reinforcement.

142 Shoring walls Wood or metal angles are used to shore walls, windows and doors

143 Placement of frames See detail “A” See detail “C” Detail “A” See detail “B” The andino frame can be placed inside the connector panel or over it. The frames can be placed before or after filling the walls. Detail “B” Detail “C”

144 Wall Bracing Brace with pump
Metal funnel to avoid wasting the concrete. Brace with pump

145 Shoring walls Roof anchors Cleaning the walls with water

146 Mezzanine Plates Plate system with blocks
Flooring plates for more than two floors

147 Plate system with Steeldeck
Mezzanine Plates Plate system with Steeldeck Solid Plate

148 Enlarged picture of the RBS beam and roof anchors
Roof installation Placement of the ridge beam on the wall´s axis Placement of the beam anchor Enlarged picture of the RBS beam and roof anchors Roof anchors

149 Roof Installation Once the connectors are aligned in place, procede to present the panels, which will slide between connectors .

150 Roof Installation Ridge Installation Ventilation lid is placed
Place lid Se procede a colocar la tapa de cumbrera caballete Ridge Installation

151 Roof Installation TILES ALTERNATIVES Roof with clay tile
Roof with andina tile TILES ALTERNATIVES

152 3.2. Empty walls with metal structure
Floor assemble system Wall assemble system Frame installation Installations Roof structure Assemble of roof and finishes 3.2. Empty walls with metal structure

153 Construction process Floor assemble system 1. BASE SUPPORT
2. BASE OR PLATE 3. INSTALLATIONS Floor assemble system

154 Construction Process Walls assemble system 4. WALL STRUCTURE

155 Construction Process Frames for doors and windows
6. FRAMES INSTALLATION Frames for doors and windows

156 Construction Process Installations 7. HYDRAULICS INST.
8. ELECTRIC INST. Installations

157 Construction Process 9. ROOF STRUCTURE Roof structure

158 Construction Process Roof assemble and finishes 10. ROOF ASSEMBLE

159 Specifications and detailes of construction

160 Approvals and Certifications
5.1. Fire resistant (English) 5.2. Fire resistant 5.3. Chemical resistant 5.4. Structural resistance of 64mm 5.5. Acoustic resistance of 100mm 5.6. Balistic testing 5.7. Maintenance technical guide 5.8. Tool list Approvals and Certifications

161 Housing kits Institutional Kits Royal Andina Kits

162 Labrador house sqm Montana house - 27sqm La Inés house sqm Paraiso house – 39 sqm La Cabaña house- 42sqm Verano house sqm Caribe house sqm La Calera house – 60sqm Lebrija house sqm Palmeras house120sqm 6.1. Housing Kits

163 Labrador house – 15 Sqm

164 Labrador house – 15 Sqm

165 Montana house – 27 Sqm

166 Montana house – 27 Sqm

167 La Inés house – 36 Sqm

168 La Inés house – 36 Sqm

169 Paraíso house – 39 Sqm

170 Paraíso house – 39 Sqm

171 La Cabaña house – 42 Sqm

172 Verano house – 46 Sqm

173 Verano – 46 Sqm

174 Caribe house 52 Sqm

175 Caribe house 52 Sqm

176 La Cabaña – 42 Sqm

177 La Calera house 60 Sqm

178 La Calera house 60 Sqm

179 Lebrija 70 Sqm

180 Lebrija house 70 Sqm

181 Palmeras house 120 Sqm

182 Palmeras house 120 Sqm

183 6. 2. 1. Lodging of - 81 Sqm 6. 2. 2. Service module of 36 Sqm 6. 2. 3
Lodging of Sqm Service module of 36 Sqm Administration module of 48 Sqm Large classroom of 48 Sqm Bathroom set of 24 Sqm Classroom module 2 of 74 Sqm Classroom module 3 of 110 Sqm Educational classroom module 4 + Set Bathrooms Módulo Educativo 6 Aulas+Bat. Baños 6.2. Institutionals Kits

184 Lodging of 81 Sqm

185 Lodging of 81 Sqm

186 Service module of 36 Sqm

187 Service module of 36 Sqm

188 Administration module of 48 Sqm

189 Administration module of 48 Sqm

190 Large classroom of 48 Sqm

191 Large classroom of 48 Sqm

192 Bathrooms set of 24 Sqm

193 Bathrooms set of 24 Sqm

194 Classroom module 2 of 74 Sqm

195 Classroom module 2 of 74 Sqm

196 Classroom module 3 of 110 Sqm

197 Classroom module 3 of 110 Sqm

198 Módulo Educativo 4 Aulas+Batería Baños

199 Módulo Educativo 6 Aulas+Batería Baños


Download ppt "Royal Building System General RBS Aplications Construction Process"

Similar presentations


Ads by Google