Presentation is loading. Please wait.

Presentation is loading. Please wait.

This is a rough “working” powerpoint, of the spreadsheet “RBR Results Jan’07.” These were the basis for the Jan CAMREX proposal, and are intended to be.

Similar presentations


Presentation on theme: "This is a rough “working” powerpoint, of the spreadsheet “RBR Results Jan’07.” These were the basis for the Jan CAMREX proposal, and are intended to be."— Presentation transcript:

1 This is a rough “working” powerpoint, of the spreadsheet “RBR Results Jan’07.” These were the basis for the Jan CAMREX proposal, and are intended to be the basis of the “completion” of a cleaned RBR dataset. Please find, identify, and fix any and all gaps, errors.... Jeff, Feb 9,’07

2 Tab PV Man PV TP Man Tab TP HYDROGRAPHS Julian days, Jan 1, 2004 – Dec 31, 2006 Porto Velho Solimoes at Manacapuru Teles Alta Floresta Tabajara

3 Regua (m)

4 Temp oC agua

5 pH w

6 DIC

7 TP %pCO2

8 O2mg/L

9 pCO2

10 DOCmg

11 Rsp

12 FSSmg

13 13C

14 15N

15 C/N

16 %C

17 %N

18 NO3μM

19 CONDµS/cm

20 Ca μM

21 NaμM

22 Mg μM

23 K μM

24 Cl μM

25 SO4μM

26


Download ppt "This is a rough “working” powerpoint, of the spreadsheet “RBR Results Jan’07.” These were the basis for the Jan CAMREX proposal, and are intended to be."

Similar presentations


Ads by Google