Presentation is loading. Please wait.

Presentation is loading. Please wait.

CNET : Task Force Excel Had tasked Staff in 2000 to Report status / requirements for.

Similar presentations


Presentation on theme: "CNET : Task Force Excel Had tasked Staff in 2000 to Report status / requirements for."— Presentation transcript:

1 www.ITEinc.US1 CNET : Task Force Excel http://www.uscg.mil/TCYORKTOWN/PTC/downloads/TFE.ppt Had tasked Staff in 2000 to Report status / requirements for CNSF training See CNSF PPT Jan 2002 Engineers at Ingalls scope CAD & dynamic Design Validation using physics models 9 Year History: Physics Modeling Applied to Design, V&V, Training & Decision Aids r1 Navy Training Requirements 200020012002 200320042005 1999 SBIR Ph 2 Ends PMS 430 BFTT Observes SIMSMART Physics Ship Model at SNAME 2006 LPD 17 is Navys First attempt at full digital design incorporating CAD and Physics Dynamic Validation, Selects SIMSMART via competition 2007 Draft DOP and ROI provided for CNSF Executive Summary CNO ADM Clark ordered Executive Review Navy Training (ERNT) CNET: 5 Vector Model / Career Training & Education from Ship Acquisition thru Ship Lifecycle 430 Has BFTT CS SIM-STIM; Needs HM&E & DC SIM-STIM 1 st Demo/Model delivered Notional CG I/ITSEC 2001 International BFTT Demo Tactical & Eng, DC via WAN U.S. U.K.- Aus.-Netherlands. New NAVSEA VADM Balisle Re-org NAVSEA IWS-1E Rick Bragg. All new contracts. Staff change over. DSR SBIR Contract Mod to add Simsmart HM&E-DC model Model of notional CG DSR / Simsmart / OAK contracts end Raytheon Phase 4 of DD(X) HM&E dynamic design validation tools acquired by BIW & Ingalls for Modeling DD21 (DDX);by Avondale for PD17; by Ingalls for CG47 Mod; Gibbs & Cox, JJMA and NAVSEA etc. I/ITSEC 2000, see DCAMS at BFTT booth, Recommend join SBIR First Real Time cascading casualties for damage and HM&E / repair tied to BFTT CS, using EOSS / EOCC / CSOSS CNSF VADM Tim LaFleur observes BFTT / Simsmart Demo @ SNA 2002 SNA 2002 Mar 2002:Directed Demo for VADM LaFleur & Staff @ SD @ SBIR 2002 CNSF: Can you provide CD for A School Sailors per ERNT? Yes. CoC CNSF RADM Terry Etnyre 3/05 GAO Report 05-183: findings include … ship design incomplete before production causing cost over run & deficient systems. Also see INSURV MSG: PREINSURV Norfolk VA 181811Z July 05 LPD-17 Incomplete … DD(X) begins BIW/ Ingalls Together = DD21 Alliance Both select Simsmart via Competition Ingalls sells idea to DD21 Alliance & Navy DD21 Dies NGSS wins DDX Protest NGSS wins again, as Design Agent Katrina Flood Damage NAVSEA National Shipbuilding Research Program (NSRP), Increase US - international Competitive Capability with an Advanced Shipbuilding Enterprise (ASE) & Processes NSRP $$ to Simsmart to integrate with CATIA CAD for Dynamic Validation NSRP $$ to Simsmart to integrate with AutoCAD (Ship Constructor) for Dynamic Validation NSRP $$ to Simsmart to integrate with Intergraph CAD for Dynamic Validation OAK e-DCAMSOAK DCTMS VADM Lee Gunn Report Revolution in Training w/ To build careers / use Multi-Level Metrics … BTSWG Mtgs OAK added to SBIR Ingalls FSO CG 47 Mod dynamic design Validation / Model: Electrical Plant 13K Objects Firemain 4K Objects Chill Water 4K Objects TSTC ICD Drafted … Effort stopped with NAVSEA Reorg. SBIR Phase 2 BFTT CS / HM&E and DC Model demonstrated Ship Models for Training from Ship Design Validation Tools DD21 Program CATIA CAD + Simsmart Physics for Design Validation DCAMS NAVSEA O5L4 Program Objective Memorandum (POM) 5 years System of Record: Budget line LCS Ships (did not use dynamic design validation = no model) DDG1000 Simsmart Physics to CATIA V5 Revs 15, 16, 17 … continues DDX Starts DD(X) obtains CATIA- SIMSMART integration in Dec 04 for Dynamic Validation of Fluid and HVAC (Electrical TBD) Replace Dongle license plugs for SIMSMART DDX Dynamic Validation and Integration to Continue LPD17: 11 Vital Fluid systems validated with models for NAVSEA. HVAC & Electrical not validated (SB Space Undersized) 2003 ASNE Tech Paper: Achieve HSI through Design LHD-8 Modeling for SEA-05D. CSC 2004 I/TSEC Tech Paper A Total Ship – Crew Model to Achieve HSI Premise: Use ship design tools to support ship design / program managers during all phases of design, trials and tests, permitting IV&V monitoring the designs and HSI objectives in progress, linked to corresponding CAD drawings. Physics – math models (basis of design), now lost, are captured for reuse for: Distance Support, Performance Monitoring, Readiness Assessment, Operational Decision Aids for DC and Engineering, and future ShipAlt planning. Also support advanced dynamic interactive training ashore and afloat, as well as to provide the underlying computations to teach students how and why systems work – prepare them for critical thinking, college work, etc. NAVSESS $$ HPAC Model for ICAS Virtual Hot Plant and OBT 2005 – 2007 ANZAC Frigate Total Ship HME&DC Model IWS-1E BFTT NAVSESS $$ AC Unit Model for ICAS Virtual Hot Plant and OBT


Download ppt "CNET : Task Force Excel Had tasked Staff in 2000 to Report status / requirements for."

Similar presentations


Ads by Google