1 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Under Ground Excavation in Twin Tunnel Nathdwara end

2 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Under Ground Excavation in Twin Tunnel Nathdwara end

3 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Tunnel face of Nathdwara end

4 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
DBM completed Service Road with Ch LHS DBM Ch LHS

5 Girder Erection work in progress at Khari River Bridge @ Ch. 214+507
SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Girder Erection work in progress at Khari River Ch

6 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
DBM Ch

7 WMM work in progress at Major Junction @ Ch. 183+800 LHS
SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED WMM work in progress at Major Ch LHS

8 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Girder Erection work in progress at Rajsamand Ch

9 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Foundation work in progress at Minor Ch Reinforcement Steel fixing for Raft of Box Ch

10 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Girder Erection work in progress at Rajsamand Ch

11 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Arrangement of 2nd pile load test by Kentledge Khari River Ch

12 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Hard barricading provided at Rajsamand Flyover Hard barricading provided at Nathdwara Elevated Flyover

13 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Fixing of flexi Road Signages at various prominent locations

14 SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED
Road safety Awareness programme conducted at various locations