Presentation is loading. Please wait.

Presentation is loading. Please wait.

KYUNG IN CONSTRUCTION (L.L.C) May. 2006. 2 INDEX A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory.

Similar presentations


Presentation on theme: "KYUNG IN CONSTRUCTION (L.L.C) May. 2006. 2 INDEX A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory."— Presentation transcript:

1 KYUNG IN CONSTRUCTION (L.L.C) May. 2006

2 2 INDEX A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammers 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

3 3 A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Accomplishment in Middle East 6. Factory

4 4 1. Greeting Since establishing KYUNGIN PRECISION in 1989, weve supplied various equipments needed at a construction site, manufactured with accumulated techniques through continuous researches and developments at a 4,300m2-sized factory located in Ulsan. We promise to do always our best for customers satisfaction with abundant experiences and professionalism sincerely. We need your encouragements and supports hereafter and also hope your continuous prosperity. From Manufacturing To Construction

5 2. Introduction NAMEKYUNG IN CONSTRUCTION L.L.C DATE OF ESTABLISHMENT FEB MANAGING DIRECTOR CHA, YEONSUK LOCATIONDUBAI MAIN PRODUCTION 1. PILING MACHINE MANUFACTURING 2. BOREHOLE PILING WORKS

6 6 3. Organization OperatorsLaborsFactory Workers Office WorkersTotal Managing Director Construction Division Manufacturing Division Piling TeamSalesFactoryAdministratio n

7 7 4. Current Available Equipment in Middle East NoNo ItemQntyMaker( or Brand)Remark 1Pile Driver5KYUNG IN 3ea * KID600-L30 2ea * KID1200-L42 2Crane2 SMITOMO /KOBELLCO 55Ton 3Generator5 CAT 3306 /NTTA-855 4Compressor5SULLAIR 5Excavator2HUYNDAI 1M ³

8 8 5. Accomplishment in Middle East (Dubai) Project Name JEBEL ALI POWR AND DESALINATION PLANT PHASE L- PHASE II, U.A.E Scope of Works Borehole Piling Works, Load Test, Pile Trimming Works Project Volume 1. Original Order - Dia. * Depth : Ø600 * 15M - No. of Piles : 2,547ea - Total Length : 38,205M 2. Additional Order - Dia. * Depth : Ø600 * 14M - No. of Piles : 249ea - Total Length : 3,486M Remarks - Shortened Construction Period by 90 days

9 9 5. Accomplishment in Middle East (Bahrain) Project Name AL-MARSA FLOATING CITY: MEENA TOWER PROJECT Scope of Works Borehole Piling Works, Load Test, Pile Trimming Works Project Volume A. for Ø600 - Dia. * Depth : Ø600 * 11M - No. of Piles : 402ea - Total Length : 4,422M B. for Ø700 - Dia. * Depth : Ø600 * 11M - No. of Piles : 82ea - Total Length : 902M Remarks

10 10 6. Factory

11 11 B. Construction Site 1. Full Casing Method 1-1. Merits of Full Casing Method 1-2. Procedure of Full Casing Method 1-3. Our Strength in Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea

12 Merits of Full Casing Method (1) Excellent Quality of Pillars: Ensuring Vertically Straightness Even Surface in comparison with Bentonite Method

13 Merits of Full Casing Method (2) Quick Performance: High Productivity & Cost Saving

14 14 Environmentally Friendly: Keeping Job-Site Clean owing to No Waste Low level of Noise Pollution 1-1. Merits of Full Casing Method (3)

15 Procedure of Full Casing Method (1) Preparation Drilling Completion of Drilling

16 Procedure of Full Casing Method (2) Re-bar Cage Installment Concrete Placement Casing Removal

17 Our Strength in Full Casing Method 1.We achieved a great success in Full Casing Method in Middle East for the first time. 2. Due to our Success in Full Casing Method in Jebel Ali Plant, Dubai City hall has picked up Full Casing Method as a Recommendable Boring Method for the piling construction in Dubai. 3. International Patent applied for Boring Method for Sand Layer and Auger Machine for the first time in the World. * Tile of Invention : AUGER BORING MACHINE HAVING VIBRATOR AND BORING METHOD USING THE SAME * Applied Number : PCT/KR2006/001391

18 18 2. Procedure of Pile Cutting (1) Excavation for Pile Cutting Pile Cutter Setting Placing Pile into Pile Cutter

19 19 2. Procedure of Pile Cutting (2) Cutting Pile and Moving Debris Clean Pile Head

20 20 3. Procedure of Load Test (1) Excavation for Load Test Pile head Cutting and Leveling Setting of Cylinder Hydraulic Jack

21 21 3. Procedure of Load Test (2) Lying of Test Beam Loading Concrete Blocks Gage Setting

22 Job Site in Dubai : Jebel Ali Power Plant (1) Jebel Ali Power Station & Desalination L-Phase

23 Job Site in Dubai : Jebel Ali Power Plant (2) Jebel Ali Power Station & Desalination L-Phase

24 Job Site in Bahrain Bahrain MEENA TOWER PROJECT

25 Job-Site in Korea : DTH Hammer Rock Piling KTX (Korea Train Express) Construction Site Our DTH Hammer Machine is used for all railroad tracks in Korea Such as KTX tracks, Kyungbu line Honam line and so on.

26 Job-Site in Korea : Rock-Bed Piling

27 Job-Site in Korea : Ø1000 Piling

28 Job-Site in Korea : Soil Piling

29 29 C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammer 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

30 30 Dia. Ø800Ø600 10M 15M 20M 25M 30M 35M 40M 45M 1-1. Drilling Rig : KID800 Ø600*29.5M Ø800*27M Ø600+27M K-150DP KCA-890 ModelHole Dia.Drilling DepthLeader LengthAuger DriverCasing Driver KID800 Ø800Max. 36M 33M * Ø711 K-150DPKCA-890 Ø600Max. 42M Note; 1. & Hole : drilled with One Full Casing at one time. 2. Hole : another casing of 15M is jointed by welding with the first casing. 3. KID800 is compatible for Ø600 & Ø800 hole by using Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. +15M 27M 42M Depth 29.5M

31 Drilling Rig : KID1200 Dia. Ø1200Ø800 10M 15M 20M 25M 30M 35M 40M 45M Ø800*29.5M Ø1200*27M Depth Ø800+27M K-240DP KCA-1200 ModelHole Dia.Drilling DepthLeader LengthAuger DriverCasing Driver KID1200-A Ø1200Max. 39M 39M * Ø711 K-240DPKCA-1200 Ø800Max. 42M +15M 27M 42M 29.5M Note; 1. & Hole : drilled with One Full Casing at one time. 2. Hole : another casing of 15M is jointed by welding with the first casing. 3. KID1200 is compatible for Ø800 & Ø1200 hole by change Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E.

32 32 * Structure of Drilling Rig Ø Ø Ø * Note : The specification is subject to be changed for improvement without prior notice.

33 Pictures of Pile Drivers (1) KID1200 KID800

34 Pictures of Pile Drivers (2) KID1200-L36JSP Machine

35 35 2. DTH Hammer (1) from Ø400 to Ø1200

36 36 2. DTH Hammer (2) from Ø400 to Ø1200

37 37 3. Auger & Casing Drivers Casing Drivers Earth Augers Hydraulic Auger Multi Shaft Augers Doughnut Auger

38 Auger Driver K-Series (1)

39 Auger Driver K-Series (2)

40 Casing Driver KCA-Series (1)

41 Casing Driver Series (2)

42 Screw & Bits

43 Hammers Set & Bits

44 44 Contact Us Website : Tel: Mobile : Fax : Address :


Download ppt "KYUNG IN CONSTRUCTION (L.L.C) May. 2006. 2 INDEX A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory."

Similar presentations


Ads by Google