HOSPITAL PENAWAR DEVELOPMENT & IMPROVEMENT 10 JANUARY 2012.

Similar presentations


Presentation on theme: "HOSPITAL PENAWAR DEVELOPMENT & IMPROVEMENT 10 JANUARY 2012."— Presentation transcript:

1 HOSPITAL PENAWAR DEVELOPMENT & IMPROVEMENT 10 JANUARY 2012

2 OPS PULIH – M & E

3 Pending Job INI ADALAH KERJA -KERJA MAINTENANCE DEPT SAHAJA UNTUK BULAN NOV YANG BELUM DAPAT DISELESAIKAN : 15 NOV HOSTEL A (suiz problem) = not done 20 NOV Tambah lampu papan tanda OHC Clinic = Done 2. Pasang lampu at HK dept = Done 21 NOV Pintu utama A&E goyang teruk = Dlm proses 22 NOV Aircond server room = Dlm Proses (staff baru masuk) 27 NOV Tambah lampu redspot hawker at cafe = lampu dah beli

4 Picture A&E

5 Lighting Classic

6 LIFT ' B ' IMPROVEMENT

7 TARGET BUAT : 10 JANUARY 2012

8 IN PROGRESS

9 BUMBUNG BOCOR

10 IN PROGRESS target date : January 2012 work order date : 31 DEC 2011 masalah : investigate period ~ waiting the raining day (belum dapat apa-apa feedback sehingga 10 JAN 2012)

11 ROOM 305 REFURBISHMENT

12 IN PROGRESS TINTED ~ DONE (4/1/2012) WALLPAPER ~ 12 JANUARY 2012 TRACK CURTAIN ~ 11 JANUARY 2012 CURTAIN ~ 11 JANUARY 2012 * CEILING YANG BOCOR BELUM DAPAT DIPERBAIKI ALTERNATIVE * TUKAR PAPAN CEILING SAHAJA UNTUK TIDAK NAMPAK KOTOR DAN BERKULAT

13 WORK DONE - TINTED

14 ASSEMBLY COVERED AREA

15 IN PROGRESS target date ~ 2nd January work order date ~ 31 DEC 2011 masalah ~ RUNGATE belum memberi feedback untuk tetapkan tarikh buat Rungate : waiting for approval

16 CURRENT AND PROPOSE IMAGE

17 MRI

18 DEMOLISH EXISTING WALL

19 CLEARANCE

20 TRANSIT WARD 3

21 overall all done accept wall lighting, tv installation and call bell lighting and painting wall not decide yet...

22 RECEPTIONIST COUNTER REFURBISHMENT

23 CURRENT

24 PROPOSAL DR ADNAN APPROVED FOR 3 RD DESIGN 1 2 3

25 OPS SUCI

26 ON JOB Training on 4-5 January Siti Nurain Hamzah

27 IT DEVELOPMENT OT CLINICAL SYSTEM – 80% -TARGET NEXT WEEK RUN NURSING REPORT – RECENT UPDATE – TRAINING TROLLEY CHINA – ON THE WAY

28 PENAWAR CORNER LANDSCAPE

29 IN PROGRESS KERJA - KERJA MEMBUAT PLAN MINI PADANG GOLF SEDANG GIAT DIJALANKAN DAN KERJA - KERJA PEMBERSIHAN RUMPUT DAN PEMOTONGAN JUGA DIJALANKAN.

30 IN PROGRESS

31 NURSING - ROSTER MX & TRAINING

32 TRAINING Meeting with Ina & Matron Marziah *Schedule / Content of Labour room Mx a) Antenatal care - Stages of labour b) Post Natal Care c) Observation - Vital sign, Pad chart, contraction, Feotal Heart, VE. d) Epidural Care e) Medication f) Compication g) Emergency Rescue h) Spritual Support i) Education for pt's & family will slide A.S.A.P.

33 CAFE IMPROVEMENT

34 PENAMBAHA N SIMEN FOOD DISPLAY NASI CAMPUR HAWKERS AREA SINK I DAPUR WORKING TABLE S I NK I KA K I L I MA ROTIROTI DONUT DISPLAY CHILLER AISKRIMAISKRIM MEJA MAKAN CAFÉ & KITCHEN DEVELOPMENT NEW PLAN LAYOUT PETI SEJUK ROTI CANAI MEJA BUAT AIR CASHEIR COUNTER

35 BUDGET FOR NEW EQUIPMENT QUOTATION / BUDGET (RM)DECISSION 1. FOOD DISPLAY 6 HOLD STAINLESS STEEL – 6 HOLE/1 RACK RM 2030, 5 HOLES/2 RACK RM 2080, 6 HOLE/2 RACK RM 2150 APPROVED - 5 HOLES/2 RACK RM 2080, TO PROCEED PO 2. DAPUR 3 TUNGKU STAINLESS STEEL NASI AYAM STAINLESS STEEL STALL – 2 TUNGKU RM 950, 3 TUNGKU RM 1050 – RM 1250 APPROVED - 3 TUNGKU RM 1250 TO PROCEED PO RM 1230 TO PROCEED PO 3. COUNTER AIR STAINESS STEEL – 2 RACK RM 1330, 2 RACK & SINK RM 1660 TO DESIGN BY RUNGATE – EN KENT 4. COUNTER CASHEIR – BUDGET RM 1500 (TO FIND QUOTATION) TO DESIGN BY RUNGATE – EN KENT 5. MENU LIGHT BOX - 10 BOX – RM 1000 (EXCLUDE PICTURE) WAITING HAWKERS & KOUNTER AIR RENOVATION DONE 6. MEJA MAKAN + KERUSI EMPAT BULAT SET – BUDGET RM 300/SET = 3000 (TO FIND QUOTATION) PENDING 7. NEW PINGAN MAKAN HIJAU (50 PCS) BERALAS KERTAS TOTAL BUDGET RM 10,510 – BUDGET RM 150 (TO FIND QUOTATION) TOTAL BUDGET APPROVED RM 4560

36 IN PROGRESS – PO ISSUE

37 ORHER THING / MATTERSPROPOSEDECISSION 1. PROPOSE KITCHEN HELPER CUM CHEF – PROPOSE MENU ALA THAI DAN LAUK NASI CAMPUR - ADA CANDIDATE APPROVED 2. WATER FILTER FOR DRINK TO REDUCE COST EXPENSES – TO REDUCE COST WATER SUPPLY FROM DR SUKIDA RM RM280/MTH APPROVED BUDGET RM 1000

38 CAFÉ RENOVATION WORKBUDGET (RM)DECISSION 1. KERJA MENYEMIN DEPAN HAWKERS 2. KERJA PEMECAHAN BILIK BUAT AIR SEKARANG TOTAL BUDGET RM 4000 – RM 500 – RM 3500 JOBS ORDER: REQUEST FOR PLAN AND DESIGN FORWARD TO RUNGATE – DONE

39 PENAWAR BUS

40 IN PROGRESS BUS DESIGN APPROVAL Target : Date send letter : 11 January SPAD Muar Date to get approval : within 1 week.

41 AMBULANCE JER - NEW DESIGN & PUSPAKOM

42 IN PROGESS PROJEK: 1. NEW DESIGN EXTERNAL FOR AMBULAN JER NEW DESIGN FOR INTERNAL (PESSENGER AREA) 3. UPGRADING EQUIPMENT / MACHINE 4. PENGHANTARAN AMBULAN KE PUSPAKOM UNTUK PEMERIKSAAN BERKALA PLANNING THIS WEEK: MEMBUAT LAKARAN CADANGAN DESIGN AMBULAN (STICKER BAHAGIAN LUAR) CONFORMATION STICKER MENGHANTGAR LAKARAN STICKER KE SYARIKAT PEMBUAT STICKER DAN DAPATKAN QUOTATION CONFORMATION STICKER DAN HANTAR AMBULAN UNTUK PENAMPALAN PENGHANTARAN PEMERIKSAAN KE PUSPAKOM. GAMBARAN LAKARAN KOSONG AMBULAN

43 PROPOSAL NEW DESIGN

44 NEW LOOK

45 NEW UNIFORM – HOSPITAL BLOCK

46 Total staff involved:- NoDepartmentTotal Staff 1Billing4 2Cashier/Dispensary7 3Imaging7 4Medical Record5 5Physio5 6Clinic6 7Reception4 Total38

47 1st stage - distribution to Medical Record & Receptionist Staff - distribute by Thursday Staff list - * Samsilawati said * Norwahidah Rahmat * Mohd Nizwan * Premela * Siti Aminah * Siti Syafiqa * Siti NUrain Hamzah * Zulaiha Nordin * Noorpazilah Tukiman

48 NEUROSURGERY

49 UPDATE - Infrastructure for ICU - ICP Monitor - pending and sourcing by Ahmad (Post Craniotomy) - Appointment with Dr Johari (visiting consultant )

50 HEALTHY WORK POLICY FOR STAFFS

51 CATEGORY Pre employment medical check up - By category - male & female - Type of test - * Medical History * BMI * Urine Drug * UPT * Blood Pressure * height * Fasting Blood Sugar * Proposed date - 15th January 2012

52 THANK YOU