Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITU Seminar – Warsaw Poland, May 2012 1 TRANSITION TO DIGITAL TERRESTRIAL TELEVISION BROADCASTING, BORDERLINE FREQUENCY COORDINATION AND DIGITAL DIVIDEND.

Similar presentations


Presentation on theme: "ITU Seminar – Warsaw Poland, May 2012 1 TRANSITION TO DIGITAL TERRESTRIAL TELEVISION BROADCASTING, BORDERLINE FREQUENCY COORDINATION AND DIGITAL DIVIDEND."— Presentation transcript:

1 ITU Seminar – Warsaw Poland, May TRANSITION TO DIGITAL TERRESTRIAL TELEVISION BROADCASTING, BORDERLINE FREQUENCY COORDINATION AND DIGITAL DIVIDEND Warsaw, Poland 7-9 May 2012 Conclusions of the ITU WRC-12 Pham Nhu Hai Head, Broadcasting Services Radiocommunication Bureau

2 ITU Seminar – Warsaw Poland, May 2012 International Radiotelegraph Convention

3 ITU Seminar – Warsaw Poland, May 2012 WRC-12  33 Agenda Items  165 Member State delegations  Major private sector representatives  Over 3500 registered participants 3

4 ITU Seminar – Warsaw Poland, May 2012 Main Issues  Mobile broadband including IMT  Regulatory  Safety  Environment  Science  Navigation and Mobile Satellite 4

5 ITU Seminar – Warsaw Poland, May 2012 MOBILE BROADBAND INCLUDING IMT 5

6 ITU Seminar – Warsaw Poland, May 2012 Mobile broadband including IMT  Further allocations to facilitate the development of terrestrial mobile broadband applications  800 MHz Band  700 MHz Band  WRC-15 Agenda Item 6

7 ITU Seminar – Warsaw Poland, May 2012 REGULATORY ISSUES 7

8 ITU Seminar – Warsaw Poland, May 2012 Regulatory  Enhancement of the international regulatory framework  Considerations of difficulties in Space regulations  BSS in 22 GHz Band  Impact on spectrum management from SDR, CRS, SRD  Use of free space optical links 8

9 ITU Seminar – Warsaw Poland, May 2012 Enhancement of the international regulatory framework  Current framework is adequate  Need to review regularly  A standing Agenda Item for future conferences 9

10 ITU Seminar – Warsaw Poland, May 2012 Considerations of difficulties in the space regulations  Large number of proposals  WRC12 agreed  Clearer definition of date of bringing into use – at least 90 days  Extension of the suspension period to 3 years  Reduce coordination arc (C and Ku bands)  Better information of movements of spacecrafts 10

11 ITU Seminar – Warsaw Poland, May GHz Band  Advanced digital satellite broadcasting applications (UHDTV, 3DTV, VIS, LSDI, EHRI)  WRC12 agreed  Priori planning not necessary  Equitable access to be observed under Article 44 of ITU Convention  Improved regulatory procedures  New FSS allocation with PFD limits 11

12 ITU Seminar – Warsaw Poland, May 2012 Impact on spectrum management from SDR, CRS, SRD  WRC12 decided  Not to modify RR  The needs of these systems to be addressed in ITU-R Study Groups 12

13 ITU Seminar – Warsaw Poland, May 2012 SAFETY ISSUES 13

14 ITU Seminar – Warsaw Poland, May 2012 Safety and security of services  Aeronautical  Maritime  Radiolocation 14

15 ITU Seminar – Warsaw Poland, May 2012 Aeronautical Services  Spectrum and regulatory actions for safe operation of Unmanned Aircraft Systems (UAS) in non-segregated airspace used by civil aviation  WRC-12 agreed  Worldwide allocation in 5 GHz Band for terrestrial and satellite components 15

16 ITU Seminar – Warsaw Poland, May 2012 Aeronautical Services (2)  The use of L-Band ( GHz) by AMSS (in route)  Concern that current coordination procedure not transparent and effective  WRC-12 agreed  Detailed coordination meeting procedure  Participation of ITU-BR 16

17 ITU Seminar – Warsaw Poland, May 2012 Maritime Services  To enhance maritime safety systems for ships and ports  WRC-12 adopted  Satellite detection of AIS onboard ships  Worldwide allocations around and 162 MHz for search and rescue  Worldwide allocation in 500 kHz range for broadcast of safety information 17

18 ITU Seminar – Warsaw Poland, May 2012 Radiolocation Services  New applications using radars for surveillance, tracking and maneuvering spacecraft in VHF Band  WRC-12 decided  Additional primary allocation in MHz subject to regulatory restrictions of 12 coiuntries 18

19 ITU Seminar – Warsaw Poland, May 2012 ENVIRONMENT ISSUES 19

20 ITU Seminar – Warsaw Poland, May 2012 Environment  Growing importance of the use of ICT in the combat of climate change in the prediction and relief of natural disasters. 20

21 ITU Seminar – Warsaw Poland, May 2012 Oceanographic Radars  3 to 50 MHz  Gather data to  mitigate the effect of disasters  Understand climate change  Safe maritime travel  WRC-12 agreed  World wide primary and secondary allocations 21

22 ITU Seminar – Warsaw Poland, May 2012 Lightning Detection  Introduction of automated arrival time difference (ATD)  Able to detect lightning stroke at thousands of Km from stoke location  WRC-12 decided  New primary allocation at 8.3 and 11.3 kHz 22

23 ITU Seminar – Warsaw Poland, May 2012 Meteorological Satellites (MetSat)  GHz  New generation MetSats  Higher data rates and bandwidth  WRC-12 decided  Extension current allocation to 7.9GHz 23

24 ITU Seminar – Warsaw Poland, May 2012 SCIENCE ISSUES 24

25 ITU Seminar – Warsaw Poland, May 2012 Space Research Missions  Robotic and other missions in transit to or near the Moon  GHz (downlink)  Data retrieval  Voice/video communication  WRC-12 agreed  New allocation GHz under condition to protect FS and MS in neighbouring countries 25

26 ITU Seminar – Warsaw Poland, May 2012 SRS Earth Stations  GHz  Support manned near Earth and deep space missions  WRC-12 decided  To exclude aeronautical mobile service from this band to protect these space applications 26

27 ITU Seminar – Warsaw Poland, May 2012 NAVIGATION AND MOBILE SATELLITES 27

28 ITU Seminar – Warsaw Poland, May 2012 Radiodetermination Satellite Service (RDSS)  MHz  Interest to provide global services  Harmonized regulatory framework  New allocation  WRC-12 decided to harmonize 2.5GHz band  New primary allocation for Region 1  Upgrade RDSS allocation in the same band in Region 3. 28

29 ITU Seminar – Warsaw Poland, May 2012 Mobile Satellite Service (MSS)  Increased use for telephony and data applications  Development constrained due to lack of spectrum  Difficult to find additional allocation in 4-16 GHz  WRC-15 Agenda Item looking at GHz 29

30 ITU Seminar – Warsaw Poland, May 2012 CONCLUSIONS 30

31 ITU Seminar – Warsaw Poland, May 2012 WRC-12 A BIG SUCCESS! 31

32 ITU Seminar – Warsaw Poland, May 2012 PARTICIPATE IN CPM-15 PLEASE! 32

33 ITU Seminar – Warsaw Poland, May 2012 SEE YOU ALL AT WRC-15! 33

34 ITU Seminar – Warsaw Poland, May 2012 Thank you for your attention!


Download ppt "ITU Seminar – Warsaw Poland, May 2012 1 TRANSITION TO DIGITAL TERRESTRIAL TELEVISION BROADCASTING, BORDERLINE FREQUENCY COORDINATION AND DIGITAL DIVIDEND."

Similar presentations


Ads by Google