1 RSRDC UNIT-II JODHPUR

2 ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL KUMAR MATHUR ARE SH. AJIT JAIN ARE SH. SHANTI CHAND ARE SH. MAHENDERA SINGH DEORA ARE (E) SH. SANJAY NARAIN MATHUR JEN SH JASPAL SINGH ACCOUNTANT

3 Financial Work Load in Unit S. No. Name of WorkClient Deptt. A& F SanctionExpenditure till dateBalance Work ARE – I SHRI ASHOK KUMAR MATHUR 1Strengthening & DEV. PAL ROAD MDM CIRCLE - BORANADA UIT/JDA JODHPUR UDD/01/07/Dt OF RS CRORE CRORE22.60 Crores 2INDOOR STADIUM UIT/JDA JODHPUR LT. NO LACS DT RS LACS lacs63.69 lacs ARE – II Sh.Rakesh Chandra Mathur 1Constt. Of USQ & LSQ at PTS Jodhpur Police Deptt. (Govt of Raj) LACS LACS LACS 2Constt. Of LSQ& USQ at RAC Ist Ballalion (Mandore Campus ) Jodhpur Police Deptt. (Govt of Raj) 3Constt. Of LSQ & USQ at RPTC Jodhpur Police Deptt. (Govt of Raj) Rs Lacs

4 Financial Work Load in Unit S. No. Name of WorkClient Deptt.A& F SanctionExpenditure till dateBalance Work ARE – III Sh.Shanti Chand Mathur 1Construction of OIL HOUSE at Jodhpur OIL India Ltd lacs lacs lacs ARE – IV Sh.Nirmal Mathur 1Construction of ROB in lieu of LC No. C-27 at Pali. State Govt.(PWD) lacs26.36 lacs lacs 2Residencial Boys School Kenpura Pali. REIS lacs lacsWork Completed & handed over to client in the month of June 09. ARE – V Sh.Ajit Jain 1Construction of ROB in lieu of LC No. 134-B at Abu Road. State Govt.(PWD) lacs lacs lacs ARE – VI Sh.Mahendra Singh Deora 1Elect work of all work of unit II Jodhpur ARE – VII Sh. Sanjay Narain Mathur 1Residencial Boys School Mandore Jodhpur REIS lacs lacsWork Completed & handed over to client in the month of June 09. Rs. In Lacs

5 Important Works Completed during last 5 years Civil and architectural work in superstructure of main power house building at GLTPP BARMER DATE OF START DATE OF COMP WORK IS COMPLETED COST OF WORK LACS

6 Important Works Completed during last 5 years AREA DEVELOPMENT WORK SUCH AS WATERSUPPLY,SEVERAGE,ROAD AND DRAINAGE WORK IN VARIOUS RESIDENTIAL COLONIES &DEVELOPMENT OF LAND FILL SITES AT JODHPUR PACKAGE JOD-ST-O5 DATE OF START DARE OF COMP COST LACS

7 Residential Boys School Mandore Jodhpur Total Cost:Rs Lacs Location: Residential Boys School Mandore Jodhpur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date:Work Completed. Bottlenecks if any:

8 ROB Rashala Road Jodhpur Completion Cost – Rs Crs. Important Works Completed during last 5 years

9 Residential Boys School Kenpura Pali. Total Cost:Rs Crores Location:Construction of ROB in lieu of LC No. C-27 at Pali. Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date:Work is Completed.

10 Indoor Stadium Jodhpur Total Cost:Rs Crores Location:Jodhpur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date:On the availability of fund Bottlenecks if any:Funds are not made available by JDA

11 Strengthening & Dev. Pal Road MDM Circle to Boranada Jodhpur Total Cost:Rs Crores Location:Jodhpur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date:On the available of fund Bottlenecks if any:Funds are not made available by JDA

12 Construction of LSQ&USQ at PTS Jodhpur Total Cost:Rs Crores Location:RPTC Campus Jodhpur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date: Bottlenecks if any:

13 Construction of LSQ&USQ at RPTC Jodhpur Total Cost:Rs Crores Location:RPTC Campus Jodhpur Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date: Bottlenecks if any:

14 Construction of LSQ&USQ at RAC Ist Battalion Jodhpur Total Cost:Rs Crores Location: RPTC Campus & RAC Campus Jodhpur Date of Start: Stipulated Date of Completion: Expenditure till Date: Rs lacs Likely Completion date: Bottlenecks if any:

15 Construction of OIL HOUSE at Jodhpur Total Cost:Rs Crores Location:Construction of OIL HOUSE at Jodhpur Date of Start: Stipulated Date of Completion : Expenditure till Date:Rs lacs Likely Completion date: Bottlenecks if any: 1. Some decisions about RCC designs and finishing work are pending from OIL India Ltd. 2. Approval for subletting of some works like Aluminum and fire fighting is pending 3. Tenders for Electrical and AC works are not finalised.

16 Construction of ROB in lieu of LC No. C-27 at Pali. Total Cost:Rs Crores Location:Construction of ROB in lieu of LC No. C-27 at Pali. Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date:Work is temporarily suspended. Bottlenecks if any:Revised A&F is required

17 Construction of ROB in lieu of LC No. 134-B at Abu Road. Total Cost:Rs Crores Location:Construction of ROB in lieu of LC No. 134-B at Abu Road. Date of Start: Stipulated Date of Completion: Expenditure till Date:Rs lacs Likely Completion date: Bottlenecks if any: GAD was revised by RAILWAY delayed the work by 2 month. Some qty Steel supplied didnt confirm to specifications and had to be replaced by supplier three times so work delayed by 3months..

18 DEC 09JAN 10FEB 10MAR 10APRIL 10MAY 10JUNE 10 ABUTMENT A2 ABU ROAD SIDE APPROACH ABU ROAD SIDE ABATMENT A1 (AMBAJI SIDE) APPROACH AMBAJI SIDE SERVICE ROAD AMBAJI SIDE SERVICE ROAD ABU ROAD SIDE DRAIN ABU ROAD SIDE DRAIN AMBAJI SIDE WMM, BT ABUROAD SIDE WMM BT AMBAJI SIDE P,A1 SPAN SUPPER STRACTURE P5,A2 SPAN SUPPER STRACTURE ROAD FURNITURE BAR CHART FOR Construction of ROB in lieu of LC No. 134-B at Abu Road.

19 Proposed New Works S. No. Name of WorkClient Deptt.ModeEstimated Cost 1ROB Barmer LC-325State Govt. (PWD) Actual plusGAD under approval

20 THANKS