Presentation is loading. Please wait.

Presentation is loading. Please wait.

330 kV power loop project “Kurzemes loks” AS “Augstsprieguma tīkls” Jānis Kirkovalds, 1 October 2010.

Similar presentations


Presentation on theme: "330 kV power loop project “Kurzemes loks” AS “Augstsprieguma tīkls” Jānis Kirkovalds, 1 October 2010."— Presentation transcript:

1 330 kV power loop project “Kurzemes loks” AS “Augstsprieguma tīkls” Jānis Kirkovalds, 1 October 2010

2 2014.10.12. "Kurzemes loks“ 2 Planned Activity Reconstruction of existing 110 kV transmission network loop in the Western part of Latvia “Kurzemes loks” with purpose to increase transmission capacity and voltage level to 330 kV.

3 Customers not supplied due to storm - January, 2005 2014.10.12. "Kurzemes loks" 3 14189 14022 (99%) 18191 14032 (77%) 27538 27193 (99%) 7789 7601 (98%) 14070 14000 (99%) 9559 8710 (91%) 16150 11325 (70%)

4 2014.10.12. "Kurzemes loks" 4 Challenging points for Kurzeme loop reconstruction Low power supply reliability due to bottlenecks in the Kurzeme network; emergency disconnections (internal or neighboring country network related disturbances); Baltic region power network strong dependency from limited power suppliers and isolation from European power market; Limited generating capacity development in Latvia (usage of renewable power )

5 “Kurzemes loks” project 2014.10.12. "Kurzemes loks" 5

6 Benefits from project realization 2014.10.12. "Kurzemes loks" 6 Increased power supply reliability in Kurzeme region; Removed limitations for power demand development and new powerful consumers connection; Improvement of Baltic power supply reliability providing Latvia – Estonia and Lithuania – Sweden interconnection efficiency; Extension of power trade between Baltic Sea region countries.

7 2014.10.12. "Kurzemes loks" 7 Stages of the project implementation “Riga loop” – 330 kV cable line s/st. “Imanta” – s/st. Riga TPP-1 (commissioning 2012); Existing 110 kV power line reconstruction, by strengthening it with a 330 kV overhead line in section Grobiņa - Ventspils (2011-2013); Construction of 330/110 kV substation in Ventspils (next to the existing substation site) (2011-2013); Existing 110 kV power line reconstruction, by strengthening it with a 330 kV overhead line in section Ventspils – Dundaga – Tume, new 330 kV overhead line construction in section Tume – Riga (2018); Currently an environmental impact assessment procedure for power line section Grobiņa - Ventspils - Dundaga and easement agreements signing with landowners are taking place.

8 Finance sources of the project 1 st stage Project “Kurzemes loks” is realized in framework of European Union financial support: Project environmental impact assessment and power line right-of-way study - 50% ("2009 Annual Work Programme for Grants in the field of trans – European energy networks") Project Stage Grobiņa - Ventspils construction - 50% (“European Programme for Energy Recovery”) 2014.10.12.8 "Kurzemes loks"

9 2014.10.12.9 "Kurzemes loks"

10 2014.10.12. "Kurzemes loks" 10 Thank you!


Download ppt "330 kV power loop project “Kurzemes loks” AS “Augstsprieguma tīkls” Jānis Kirkovalds, 1 October 2010."

Similar presentations


Ads by Google