G-LIO.NET “The logical evolution of LIO” http: // g-lio.jrc.ec.europa.eu / G-LioDotNet 2014 Campaign KO.

Similar presentations


Presentation on theme: "G-LIO.NET “The logical evolution of LIO” http: // g-lio.jrc.ec.europa.eu / G-LioDotNet 2014 Campaign KO."— Presentation transcript:

1 G-LIO.NET “The logical evolution of LIO” http: // g-lio.jrc.ec.europa.eu / G-LioDotNet 2014 Campaign KO

2 What is G-LIO.NET? // Technical presentation will be avoided this time New version of LioDotNet for 2014 campaign  Profiles driven workflow  More automatic controls on data (dates, upload metadata, coverages status…)  Acquisitions are new delivery units  Monthly invoicing of validated and billable acquisitions (basketification)  Automatic import of feasibility results  Integrated simplified version of the G - QuickLook Browser (G-QLB)  New users’ roles  Improvements in the layout Starting point for the NG-LIO.NET 2/16 (new colors!) 6 th March 2014

3 What is JRC providing? The G-LIO.NET 1.0 version and all potential bugs fixings (1.0.x versions) Hosting infrastructure Operational support Control over validation of conflicting acquisitions (Basket management to allow monthly invoicing of acquisitions) Technical guidance for NG-LIO.NET developments Documentation 3/16 6 th March 2014

4 Introducing G-LIO.NET - Actors 4/16 6 th March 2014

5 5/16 6 th March 2014 Introducing G-LIO.NET – Actors

6 6/16 6 th March 2014 Introducing G-LIO.NET – WF

7 2. Image Requests definition 6 th March 2014

8 2. Image Requests definition Who? – MS Administrator accounts Why? – To insert baseline information for future ARs When? – At the beginning of each new campaign Periodicity? – Normally once for campaign; twice if HR autumn/winter requested Tools? – G-LIO.NET Issues? – coherency shape file and IRs (zones, areas), feasibility analysis 8/16 6 th March 2014

9 5. Acceptance of Acquisitions 6 th March 2014

10 5. Acceptance of Acquisitions Who? – Contractor accounts (if Proposed or Retained) and Operator accounts Why? – To express conformity with the Acquisition(s) uploaded so far When? – As soon as a new Acquisition has been uploaded (up to 2 days after the upload date for Operators, up to 1 day for Contractors) Periodicity? – Several times during the whole campaign, every time a Provider is uploading an Acquisition (Contractor only if Proposed or Retained) Tools? – G-LIO.NET (+G-QLB) Issues? – Important to closely follow the notifications and to react accordingly with workflow 10/16 6 th March 2014

11 6. Delivery, Reception and IDQA validation 6 th March 2014

12 6. Delivery, Reception and IDQA validation Who? – Contractor accounts Why? – To allow Contractors to evaluate the quality of received images When? – As soon as a new Acquisition has been received (up to 5 working days after the receipt date) Periodicity? – Several times during the lasting of each window, every time new images are received Tools? – G-LIO.NET Issues? – Important to assert the actual covered area for each acquisition, as this value will be used to check for total zone coverage 12/16 6 th March 2014

13 8. Close Acquisition Requests 6 th March 2014

14 8. Close Acquisition Requests Who? – Operator accounts Why? – To declare the final status of an Acquisition Request When? – Depending on the final status of the AR: Fully/Accepted -> when the whole Zone area has been covered Partially/Accepted -> when the window ended and at least one Acquisition has been accepted by Contractor and the whole Zone area has not been covered Failed -> when the window ended and not acquisition has been accepted Closed -> in case of issues with the definition of the AR or if Contractor does not need images anymore Periodicity? – Several times during the whole campaign, once for each Acquisition Request Tools? – G-LIO.NET Issues? – ensure Contractor does not wish an extension before entering Partially/Accepted or Failed status. 14/16 6 th March 2014

15 15/16 6 th March 2014 Future G-LIO.NET? Outsourcing of developments Framework contractors will provide the NG-LIO.NET (2015 campaign), following JRC technical guidance …We look forward to it, now the ball is in EUSI and ASTRIUM hands…

16 Let’s play it! (curb your enthusiasm, please) 16/16 ‘Trailer’ video 6 th March 2014

17 Thank you SimsEC-IAT team Thank you SimsEC-IAT team Pär Åstrand, Giovanni Di Matteo, Csaba Wirnhardt, Juergen Breunig, Ignacio San-Miguel, Blanka Vajsova simsEC, Digital Earth and Reference Data unit, JRC Ispra 6 th March 2014


Download ppt "G-LIO.NET “The logical evolution of LIO” http: // g-lio.jrc.ec.europa.eu / G-LioDotNet 2014 Campaign KO."

Similar presentations


Ads by Google