1 MontingEnergetika Group Presentation March MontingEnergetika Group

2 1.Who we are 2.History 3.Location 4.Mission and Vision 5.Employees 6.Fields of Operation and Service 7.Quality system Certification 8.Fabrication 9.Institute for welding and QC 10.Non Destructive Testing NDT 11.Project 12.Costumers and Partners Contents 2 MontingEnergetika Group

3 Who we are MontingEnergetika Group is a global European company that operates in the field of industrial piping and plant construction. MontingEnergetika Group’s main activity is the providing service montage and dismantling of power and industrial facilities, processing equipment and steel structures with the possibility of restoring the individual elements, and preforming installation of heating, air conditioning and vents. 3www.m-e-g.eu MontingEnergetika Group

4 History The company started in 1951 under the name „Braća Kavurić“. In 1977 the company changed its name to „Monting“ and from 1987 to „Montingenergetika“. After the breakup of the former company, in 2008, we are opening the company under the name „Montingenergetika“ Ltd. 4www.m-e-g.eu MontingEnergetika Group

5 Location The head office is in Tuzla, Bosnia & Herzegovina (B & H) Operating units: –Germany:Ludwigshafen on the Rhine –Finland:Pori –Serbia:Kikinda Branch office: –Slovenia:Maribor –Macedonia:Ohrid –Croatia:Zagreb 5www.m-e-g.eu MontingEnergetika Group

6 Mission and Vision Mission Respond quickly to market needs with high quality and standards. Recognize and satisfy customer needs. Develop teamwork with continued investment and improvement. The continuing concern about the protection and safety of workers and the environment. Create an atmosphere,,The Other House,, for each worker. 6www.m-e-g.eu MontingEnergetika Group

7 Mission and Vision Vision Continuous investment in existing and new markets. Using new technologies and education of the employees. Reinforcing the leading position in the region and become a significant entity in the global market. Strengthen local and regional partnerships in order to offering better service. Provide new EU markets. 7www.m-e-g.eu MontingEnergetika Group

8 Employees 8www.m-e-g.eu MontingEnergetika Group

9 Employees 9www.m-e-g.eu MontingEnergetika Group

10 Employees 10www.m-e-g.eu MontingEnergetika Group

11 Fields of Operation and Service Fields of Operation Energy conventional Energy nuclear Chemical and petrochemical plants Public and Industrial Utilities 11www.m-e-g.eu MontingEnergetika Group

12 Fields of Operation and Service Service Project management Engineering Consulting Supervision Fabrication Revitalization Dismantling Mantling Maintenance NDT Heat treatment Design and development of the project (Outsourcing) 12www.m-e-g.eu MontingEnergetika Group

13 ISO 9001:2008 Sicherheits Certifikat Contraktoren SCC**:2006 AD 2000 – Merkblatt HP0 PED 97/23 EC Radiation Protection accordance with the Radiation Protection Ordinance 15 All welders have certificates according by EN Quality system Certification 13www.m-e-g.eu MontingEnergetika Group

14 Production hall in Lopare – BiH –Workshop space 3850m² –Total area m² Fabrication 14www.m-e-g.eu MontingEnergetika Group Location: 25 km fom PP Tuzla (750 MW), 20 km from PP Ugljevik (400 MW), 30 km from harbour Brčko,45 km from highway E-70

15 Fabrication Production hall is equipped with the following machines: –Hydraulic press brakes (400T/3000mm) –Hydraulic press brakes (125T/3000mm) –Hydraulic guillotine shears (20x3000mm) –Symmetrical three-roller rolling machine (20x3000mm) –CNC plasma cutting machine (dimension of the desk: 2x4m) Max. cutting thickness – Ferritic steel = 68mm Max. cutting thickness – Austenitic steel = 54mm –Universal lathe machine –CNC milling machine –Machine for bending of pipes ø88.9x6mm 15www.m-e-g.eu MontingEnergetika Group

16 Due to the great importance of welding operations, and improve the quality of our service, we opened the welding institute. The institute is consisted of “Bureau of welding” and “Quality control department” –Training of welders –Training of fitters –Materials testing –Making welding procedure (WPAR, WPQR) Institute for welding and QC 16www.m-e-g.eu MontingEnergetika Group

17 Non Destructive Testing NDT Radiographic testing Ultrasonic testing Penetrant testing Magnetic testing Hardness Measurements 17www.m-e-g.eu MontingEnergetika Group

18 Key projects Project 18www.m-e-g.eu MontingEnergetika Group

19 Project Olkiluoto 3 – Finland Pipeline installations in the reactor and safety buildings Customer: BHR Hochdruck Rohrleitungsbau GmbH Duration: March 2009 – works in progres Value: 9 million € Scope: Engineering, prefabrication and erection of pipe on Nuclear Island 19www.m-e-g.eu MontingEnergetika Group

20 Project Olkiluoto 3 – Finland Pipeline installations in the reactor and safety buildings Customer: EMPOWER Oy Duration: January 2012 – works in progres Value: 1.6 million € Scope: Engineering, prefabrication and erection of pipe on Nuclear Island 20www.m-e-g.eu MontingEnergetika Group

21 Project Olkiluoto 3 – Finland Reactor space Customer: Babcock Noell GmbH Duration: August 2010 – October 2011 Value: 292 ths € Scope: Steel works and welding in reactor space 21www.m-e-g.eu MontingEnergetika Group

22 Project Olkiluoto 3 – Finland Reactor and Fuel building – Leakage system II Customer: Babcock Noell GmbH Duration: April 2012 – Jully 2012 Value: 360 ths € Scope: Installation of leakage II system for pools in Reactor Building 30UJA and fuel building 30UFA pools Note: management of the overall project. 22www.m-e-g.eu MontingEnergetika Group

23 Project MontingEnergetika Group Empower Porvoo Tolkkinen – Finland Customer: Staff Alliance Starjobs Oy (EMPOWER Oy) Duration: June 2012 – December 2012 Value: 360 ths € Scope: Prefabrication, welding, installation

24 Project BASF – Ludwigshafen – Germany New tank storage CMM, Hydroxide solution Customer: BASF GmbH Duration: February 2009 – December 2009 Value: 250 ths € Scope: Prefabrication, welding, installation and maintenance pipelines 24www.m-e-g.eu MontingEnergetika Group

25 Project BASF – Ludwigshafen – Germany New plant for MSA (Methanesulfonic acid) Customer: BASF GmbH Duration: March 2010 – September 2010 Value: 193 ths € Scope: Prefabrication, welding, installation and maintenance pipelines 25www.m-e-g.eu MontingEnergetika Group

26 Project BASF – Ludwigshafen – Germany Project Camsy, BASF SE BAU 0530 Customer: BASF GmbH Duration: April 2011 – April 2012 Value: 992 ths € Scope: Prefabrication, welding, installation and maintenance pipelines 26www.m-e-g.eu MontingEnergetika Group

27 Project LINDE Gas – Germany Customer: Linde Gas GmbH Duration: March 2011 – October 2011 Value: 399 ths € Scope: Prefabrication, welding, installation and maintenance pipelines 27www.m-e-g.eu MontingEnergetika Group

28 Project RWE – Kraftwerk Weissweller Customer: Weber Roerleitungsbau GmbH Duration: June 2011 – August 2011 Value: 399, € Scope: Work on the high – pressure lines, welding and assembly 28www.m-e-g.eu MontingEnergetika Group

29 Project Public enterprise Elektroprivreda BiH Overhaul and modernization of Thermal Power Plant Tuzla Boiler unit 6 Customer: ZRE Katowice S.A. Duration: 2012 Value: 175 ths € Scope: Overhaul and modernization of Boiler unit 6 29www.m-e-g.eu MontingEnergetika Group

30 Project Public enterprise Elektroprivreda BiH Overhaul and modernization of Thermal Power Plant Tuzla Boiler unit 6 Customer: ALSTOM POWER Poland Duration: 2012 Value: 490 ths € Scope: Overhaul and modernization of turbine 13K MW 30www.m-e-g.eu MontingEnergetika Group

31 Costumers and Partners Bilfinger Piping Tehnologies GmbH (previous BHR) Weber Roerleitungsbau GmbH Babcock Noell GmbH Empower Oy BASF GmbH Linde Gas GmbH Areva ALSTOM POWER Poland ZRE Katowice S.A. 31www.m-e-g.eu MontingEnergetika Group

32 32www.m-e-g.eu MONTINGENERGETIKA d.o.o 6000 Ohrid – Macedonia, S.Velgosti : Ilindenska 152 MONTINGENERGETIKA d.o.o Tuzla - Bosnia & Herzegovina Prve inžinjerijske brigade bb phone: phone: phone: fax: MONTINGENERGETIKA d.o.o (GmbH) Ludwigshafen – Germany, Zweigniederlassung Ludwigshafen, Kirchenstr. 26 Phone: Phone: Fax: MONTINGENERGETIKA OY (AG) Pori / Suomi – Finland, Raatimiehenkatu 24 as 3 street Phone: MONTINGENERGETIKARS Group d.o.o Kikinda – Srbija 13. Vojvodjanskih Brigada 16 Phone : Fax: MONTINGENERGETIKA d.o.o Maribor - Slovenia Kraljevica Marka 19 MONTINGENERGETIKA d.o.o Zagreb / Croatia, Bartolici 51 FOR ANY QUESTIONS PLEASE DO NOT HESITATE TO CONTACT US MontingEnergetika Group


Download ppt "MontingEnergetika Group Presentation March 2013 1 www.m-e-g.eu MontingEnergetika Group."