1 Country Status Presentation by Eghert Daniel Copenhagen April 20, 2007

2 NoProject Identification (name) Estimated amount of CO2 reductions until 2012 (Tones) Estimated amount of CO2 reductions after 2012 (Tones) 7 years Estimated Start Date StatusFinancial due diligence Tentative Price (EUR/Tone s) Priority 1 “Landfill Gas Capturing and Utilization in Bishkek, Kyrgyzstan” LoA received, partners shall be identified and project shall be registered Project host does not have financing for the project implementation Ordubad Hydroelectric Project, Nakhchivan Autonomous Republic of Azerbaijan LoI signed and LoE issued. PDD is prepared and shall be submitted for validation. State company Azerenergy provides needed financing and can apply also loans 52 3 Argichi Small Hydroelectric Project, Armenia PDD is validated and LoA issued.Company needs additional loan arrangement “Jradzor” Small Hydro Electric Project, Armenia PDD is validated and LoA issued.Company needs additional loan arrangement Optim. of raw material grinding, clinker burning, fuel burning and clinker consumption for the production of cement at CJSC “MICA-CEMENT, Armenia PDD is prepared but not validated due to the different opinions between the Consultant and Validator Plant is in operation and part of financing can be provided by the owner Production of synthetic rubber from butadiene instead of using natural gas in CISC “Nairit –Plant”, Armenia ≥ LoI is signed, and new owners are preparing feasibility study plan. PDD preparation is not started New owner is interested to use new technology. Loan will be used for process reconstruction 5 6 PRIORITY PROJECTS

3

4 ARMENIA

5 Argichi Small Hydroelectric Project Estimated annual CER-s: t CO2, Estimated CER-s until t CO2 “Jradzor” Small Hydro Electric Project Estimated annual CER-s: 8215 t CO2, Estimated CER-s until 2012: t CO2

6 Optimization of raw material grinding, clinker burning, fuel burning and clinker consumption for the production of cement at CJSC “MICA-CEMENT”, Armenia Total investment cost of the project activities is estimated to be 3,623mill. EURO (4,348 mill. USD Estimated annual (2008) CER –s: tons CO2, Estimated CER-s up to 2012: tons CO2 Estimated CER-s after tons CO2

7 Production of synthetic rubber from butadiene instead of using natural gas in CISC “Nairit – Plant” Estimated annual CER-s: t CO2, Estimated CER-s until 2012: t CO2 Estimated CER-s after 2012: t CO2

8 AZERBAIJAN

9 Reduction of gas leakages at Azerigaz company,Baku, Project description: Identification of gas leakages, fulfillment of repair works at gas network and main units, change of equipment at compressor stations.

10 Ordubad Hydroelectric Project, Nakhchivan Autonomous Republic of Azerbaijan Estimated annual CER-s: t CO2, Estimated CER-s until 2012: t CO2 Estimated CER-s after 2012: t CO2 Ordubad 36 MW HPP investment cost is estimated to be 80 million Euros or 2.2 mill. Euro/MWe installed. Financing will be secured by the State.

11 GEORGIA

12 Catalytic N2O destruction project at the Nitric Acid Plant of AZOTI JSC/Energy Invest JSC, Rustavi The implementation of the project activity will result in an ex-ante estimation of GHG emission reductions of conservatively calculated 160,000 t CO2e per year. Please note - that estimates of GHG emission reductions are made for reference purposes only - actual emission reductions will be determined based on measurement results on ex-post basis.

13 Emissions reduction in gas distribution network at KazTransGaz LTD enterprise in Tbilisi

14 MOLDOVA

15 Waste Water Treatment Plant – biogas collection from sludge, Chisinau The GHG emission relevant for this project includes: the open release of CH4 from open anaerobic sludge pits;CO2 emissions due to production of electricity by fossil fuels.

16 KAZAKHSTAN

17 Landfill gas capturing at Almaty Landfill, Almaty, Kazakhstan and Astana District Heating leakages reduction in distribution network, Astana, Kazakhstan

18 KYRGYZSTAN

19 “Landfill Gas Capturing and Utilization in Bishkek The financial situation of the Project proponent would not allow them to finance the project totally. Landfill operator company Meenet-Service has no savings or other free capital, and therefore the investment must be based on the upfront payment for the future CER-s. Estimated annual (2008) CER-s: t CO2, Estimated CER-s until 2012: t CO2 Estimated CER-s after 2012: t CO2 Based on the test pumping results, maximum total expected emission reduction when the plant is in full operation throughout a year is approx tons CO2/year. The plant was expected to be in operation by mid Total investment need for Stage 1: approx 0,8 mill EUR.

20 Bishkel Landfill CDM Project, Kyrgyzstan

21 UZBEKISTAN

22 Nitrous Oxide Reduction at Navoiyazot Fertilizer Industry, Navoi Reduction of nitrous oxide emissions in the production of nitrogen fertilizers Open JSC "ELECTRKIMESANOAT" Chirchik Utilization of tail oil gas at “Uzneftegas” Karaulbazarsky district, Buharsky region