Presentation is loading. Please wait.

Presentation is loading. Please wait.

SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview SERIES 2000 User’s Group.

Similar presentations


Presentation on theme: "SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview SERIES 2000 User’s Group."— Presentation transcript:

1

2 SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview SERIES 2000 User’s Group

3 “What Is Being Done to Reduce Congestion?” SV-ITS Program Silicon Valley Intelligent Transportation System Program SV-ITS PROGRAM

4 Why is there traffic congestion?  Limited roadway capacity  Spill-over Fwy traffic  Non-coordinated agency systems  Few methods to communicate with drivers  Lots of cars! SV-ITS PROGRAM

5 “What Can Be Done to Reduce Congestion?” Integrate traffic management centers Integrate traffic management centers Share data with commuter Share data with commuter Deploy devices to monitor and manage traffic Deploy devices to monitor and manage traffic SV-ITS PROGRAM

6 An Example: Silicon Valley Smart Corridor The largest ITS project in Northern California. 35 mile fiber network, including arterials, expressways, and freeway. 15 miles

7 SV-ITS PROGRAM  City of San Jose  City of Campbell  City of Milpitas  City of Santa Clara  Town of Los Gatos  County of Santa Clara  VTA (Valley Transportation Authority  MTC (Metropolitan Transportation Comm)  Caltrans (California Dept of Transportation)  CHP (California Highway Patrol) THE PROJECT PARTNERS  DKS Associates  IBI Group  CCS Planning and Engineering  Transcore/SAIC  Gardner Systems

8 SV- ITS PROGRAM Little or no data from field + Non-integrated systems + No means to operate multiple systems + No method for sharing real- time data with travelers = WITHOUT CORRIDOR ROAD RAGE

9 SV- ITS PROGRAM Cameras & loops + Data Exchange Network + Communication between multiple control centers + HAR, CMS, EMS, TravInfo for sharing data = Happy Travelers WITH CORRIDOR

10 SV-ITS PROGRAM COORDINATED SIGNALS VIDEO & DETECTOR LOOPS CMS EMS HAR DATA EXCHANGE NETWORK INTERNET

11 SV- ITS PROGRAM GETTING OVER- FLOW TRAFFIC BACK TO ROUTES TO ON-RAMPS northbound traffic only EMS #3 EMS #2 EMS #1

12 THE SV-ITS PROGRAM  Regional ITS needs  SVSC design permits expansion (DEN)  Address “Market Package” Concept  Benefits of Partnering  San Jose - Design Agency  County - Construction Agency  VTA - Funding Agency  Other Agencies - Project specific partners SV-ITS PROGRAM

13 San Jose International Airport Area Advanced Transportation Management System ($2.0 million) NEW SV-ITS PROJECTS

14 SV-ITS PROGRAM SVSC - ITS Enhancement ($4.1 million) NEW SV-ITS PROJECTS

15 SVSC - MILPITAS- FREMONT ATMS ($2.9 million ($2.9 million) SV-ITS PROGRAM NEW SV-ITS PROJECTS

16 SILICON VALLEY – WEST CORRIDOR (pending funding $3.0 million est.) SV-ITS PROGRAM NEW SV-ITS PROJECTS

17 “What is being done to reduce congestion?” Agencies are working cooperatively on regional solutions Agencies are working cooperatively on regional solutions SV-ITS projects are multi-jurisdictional to encourage cooperation. SV-ITS projects are multi-jurisdictional to encourage cooperation. The projects improve efficiency by adding ITS technology. The projects improve efficiency by adding ITS technology. SV-ITS PROGRAM


Download ppt "SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview SERIES 2000 User’s Group."

Similar presentations


Ads by Google