H. GierhardtEA-1 10.01.00 - 1 Kick Off Meeting “24h Design and Development” January 10th-12th, 2000.

Similar presentations


Presentation on theme: "H. GierhardtEA-1 10.01.00 - 1 Kick Off Meeting “24h Design and Development” January 10th-12th, 2000."— Presentation transcript:

1 H. GierhardtEA-1 10.01.00 - 1 Kick Off Meeting “24h Design and Development” January 10th-12th, 2000

2 H. GierhardtEA-1 10.01.00 - 2 Goal for Kick Off Meeting Know each other Cooperation Communication Consensus Build Team@work Why Distribution Design Task Design Methodology Common Understanding !?

3 H. GierhardtEA-1 10.01.00 - 3 Schedule Kick Off Meeting Monday, January 10th Welcome 9.00 -10.00 am (Heiko) – Project introduction (with Mr. Langen, Dr. Thomson, Prof. Lindemann) – Task presentation (Heiko, Dieter, Thomas) Presentation “Team dynamics” 10.00 -10.30 am (Christiane) Team gaming 10.30 -12.00 am (Christiane, all) – The Egg Game (Team Design Task) Lunch break 12.00 am -1.00 pm Possible evening program: – Sausolitos – Pub and club area Schwabing Task discussion 1.00 - 4.00 pm (Heiko, Dieter, Thomas)

4 H. GierhardtEA-1 10.01.00 - 4 Schedule Kick Off Meeting Tuesday, January 11th FIZ-Mile 9.00 -11.30 am Lunch Break 11.30 -12.30 am Task discussion 12.30 am - 3.30 pm (all) – Presentation methodological design (Manfred) 12.30 am - 1 pm Visit BMW Test Bed Area4.00 - 5.30 pm (all) Possible evening program: – Raclett – Pub and club area Schwabing

5 H. GierhardtEA-1 10.01.00 - 5 Schedule Kick Off Meeting Wednesday, January 12th Task discussion 9.00 - 12.00 am (all) – Presentation Hyperwave (Barbara) 9.00 am - 9.30 am Lunch break12.00 am - 1.00 pm (all) Possible evening program: – Andechser – Pub and club area Schwabing – Kunstpark Ost Visit Deutsches Museum (Science and Technology) Guided Tour 1.00 - 6.00 pm (all)

6 H. GierhardtEA-1 10.01.00 - 6 Design and Development Process Optimized use of resources knowledge capital human labor space A globally distributed project - Why? Globalization – fusion of companies – global markets – world wide competition – global flow of capital – global availability of information Product complexity – complexity of function – complexity of production Market pressure – reduce time to market – optimize quality – minimize cost Distribution of resources – Chances – Challenge – Problems

7 H. GierhardtEA-1 10.01.00 - 7 Questions to solve Is it possible to realize 24hr design and development ? What is the potential of quality, cost and time? What is the additional effort? What can we learn for future projects? Is the distribution methodology a clever approach? How is the inter cultural impact on team work? Is the concept for 24hr design and development working? What tools supporting information logistics are necessary? What methods supporting information logistics are necessary?

8 H. GierhardtEA-1 10.01.00 - 8 Start of work Jan 17 Kick-off-Meeting Jan 10-12, Munich Touch Down Meeting End Apr 14 Gateway 1 Functions Feb 2 Gateway 2 Principal Solutions Mar 1 Gateway 3 Concept Combination Mar 8 Phase IPhase IIIPhase II Time Schedule

9 H. GierhardtEA-1 10.01.00 - 9 Distribution of time 8.00 – 12.30 Uhr Design Team Munich Central European Time Design Team Darmstadt 12.00 – 17.00 Uhr Design Team Clemson 16.30 – 21.30 Uhr Design Team Munich 21.00 – 21.30 Uhr 21.00 – 21.30 Uhr

10 H. GierhardtEA-1 10.01.00 - 10 Distribution Scenario 1 Design Team Munich Design Team Darmstadt Design Team Clemson Variable stroke Mass balance Assembly

11 H. GierhardtEA-1 10.01.00 - 11 Distribution Scenario 2 Design Team Munich Design Team Darmstadt Design Team Clemson Variable stroke Mass balance Assembly

12 H. GierhardtEA-1 10.01.00 - 12 Distribution of Scenario 3 Design Team Munich Design Team Darmstadt Design Team Clemson Variable stroke Mass balance Assembly

13 H. GierhardtEA-1 10.01.00 - 13 Project roles Project Management and Distribution Coaching – Prof. Dr. Georges Fadel – Daniel Fuchs – Hans-Dieter Gaul – Heiko Gierhardt – Thomas Ott Design – Mirja Beukenberg – Miroslav Filipovich – Manfred Fraenk – Christian Helbig – Christian Koletzko – Jonathan Maier – Joe Mozingo – Falk Petry – Christian Steuer – Chris Szymendera

14 H. GierhardtEA-1 10.01.00 - 14 Focus of Design - System Boundaries Focus of Design = System Crank case Crank shaft Mass balance (e.g. balance shaft) System boundaries (engine) Cylinder (interface) Cylinder head Valve train Piston System boundaries (test bed) pallet

15 H. GierhardtEA-1 10.01.00 - 15 Variable Stroke ? Why? Reduce design time Improve flexibility in testing Minimize cost Why? Reduce design time Improve flexibility in testing Minimize cost Approach Analyze Kinematics Approach Analyze Kinematics

16 H. GierhardtEA-1 10.01.00 - 16 Mass Balance Why? Functionality Low vibrations Weak point Why? Functionality Low vibrations Weak point Forces and moment of inertia Excitation forces Machine vibrations Approach Analyze Dynamics Approach Analyze Dynamics Sample Motorbike engine

17 H. GierhardtEA-1 10.01.00 - 17 Design for Ease of Assembly Why? Easy integration in test bed easy assembling reduce change time Why? Easy integration in test bed easy assembling reduce change time ? Approach Analyze boundaries Analyze design guide lines Approach Analyze boundaries Analyze design guide lines System boundaries (engine) Cylinder (interface) Valve train Piston System boundaries (test bed) pallet