1 KEY PERFORMANCE INDICATOR (KPI) LOGISTIC AND TECHNICAL DEPARTMENT TEC 2011

2 KEY PERFORMANCE INDICATOR FOR LNT

3 Key performance indicator (KPI) RateTime indicator basestretch Initiative Stationeries request dateline. 2 times.4 times. Dec till TEC’11 days Make sure all departments list down the stationeries needed. Follow up by LnT PIC for all departments. Follow up by LnT Ecs and also PIC Domestic inquiries will be carried out on the necessary of the stationeries needed. Inquiries upon request. Inquiries on each of the stationeries requested

4 KEY PERFORMANCE INDICATOR FOR LNT Key performance indicator (KPI) RateTime frame BaseStretch Initiative Tally with all departments through assigned PIC for materials required and due date Once a weekDaily within working days Dec till TEC’11 days Survey conducted earlier to identify stores and materials they sell Within Taman Maju Around Ipoh, Seri Iskandar, Seri Manjung