1 27 October 2005Technical Committee Etat des lieux (from C-H Sicard)

2 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionwhoimpacts ALLALARMWill not work for FESA? Need LASER for e.g BTV(FESA) ALLAPPLICLASER ALLAPPLICChange of Console Manager on PS Complex as on LEIR???CO/AP ALLAPPLICMaintain Existing PS Java Applications and Console ManagerCO-OP ALLAPPLIC EqpSurvey: (old VB program using passerelle) to replace by shot-by-shot logging (OP work) ALLAPPLIC Beam Statistics: Not updated since Valerio’s leave; done for PSB but PS?? OP guy concerned should check the output and give early feedback.

3 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionwhoimpacts ALLCONSOLEEq-name from 16 to 32 chars: ?applics ALLCONSOLEGet_tgm_tg8 replaced by get_tgm_tim (validated on LEIR)CO/HT ALLCONSOLE Host name size in DB (8->21 chars): impact on DTM libs & servers, DB applics, DBRT, Need to Relink X-motif applicationsCO/DM CO libraries & applics ALLCONSOLE Move of tables from PSC.XXX to ABC.XXX ‘equivalent’ for new Java applications (Knobs/wsets LEIR) may impact PS applications using directory services (Vandorpe/Chromaticity control et al) ALLCONSOLENFS server: from psnfs1 to absrv1 (performance?)CO/IN ALLCONSOLEOracle client 9.2.6->10.1.3 ALLCONSOLEPOW-V changed by WH to cope with Linac3 multi-ej(?)CO/HT ALLCONSOLESLC3CO ALLCONSOLE Startup: rc.local to transfer.ref put in PS & AD, other machines next year (+ new columns in DB)CO/FC ALLCONSOLE TIM library hiding TG8/CTRV/CTRP hardware differences (validated on LEIR)CO/HT ALLCONSOLETiming Diagnostic tools:?CO/HT

4 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionwhoimpacts ALLDSCBlocking->TTL adapters for remote reset on RIO8064 to be changedCO ALLDSCLynx4.0 (CES 2.3.6) on PS complex DSCsCO/FC ALLDSCMemory upgrade to 64MB on some CPUsCO ALLINSTRUMBody BDI: limite max 36 BP sera passée à 48 ou 64 dans tgm-libBDIM.L. ALLINSTRUMSEMGRIDs ALLINSTRUMWire ScannersBDI ALLTIMING MTGs moved to B874 (except one MTGCTF), fibers plus reflect.memory for transfering changes & external conditionsCO ALLTIMINGPossible modif of tgm contents???OP ALLTIMING Telegram now sent every Basic period (and not once per cycle): may impact RT tasks which use wait_next_tgm()CO

5 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionwhoimpacts LIN2???crate/Ctl cable moved due to cut of passerelle for Lin4 (JJC) LIN2PO14 supplies changed to standard PO (remain 1553): recabling,timingPO LIN3RFnew dln3rf1 PSBINSTRUM QMEAS : renov HW prevue sue base LEIR (=>change to FESA et applic correspondante à changer) PSBINSTRUM Trafos (Inj: sw passé sur FESA avec HW existant, Ring:test fait ; Xfer-Lines : new board en devt, sera mis en place après startup via MDs)BDIM.L. PSBINSTRUMTraject.Injection : idem TrafosBDIM.L. PSBPO10 pulsed alims Camac to 1553 PSBPO12 DC alims (Q-strip&BDL) Camac SH to 1553, plus 4 BTM 250A. PSBPOQuestion of GFA-Matrix?

6 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionWhoImpacts ADINSTRUM1 week MD planned for schottky repl (BTF) asked by Fleming next summer ADINSTRUMRepair BTVs -> new HW ( ~LEIR) ADVIDEOSOS mux to be replaced by VOS mux (when?) : last remaining SOS system! ISOLDEINSTRUMBDI : new WireScan : SW done ISOLDEINSTRUMFixed Needle: wait for applic ISOLDEINSTRUMSEMgrids : SW done ISOLDEPOAlims (J.P-L) : à voir avec lui… ISOLDE New Linux PC gateway (not in piquet spares) and CTRP module REXINSTRUMBDI Faraday Cups: SW OK but waits for applic REXINSTRUMCtl Unit: SW OK (collab russe) but waits for applic REXINSTRUMImage (BTV replacing framegrabber on PC): need $$ to move

7 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionWhoImpacts CPSINSTRUM CODD: startup with old system, Digital Orbit (new HW,FESA) en prep, tests durant 2006. CPSINSTRUMOld Camac SEMgrids replaced by MPV908 ADCs (B 269) CPSINSTRUMQMEAS: idem PSB CPSINSTRUMSOS mux replaced by VOS mux CPSPOAlims FT16 from dcpsft16 to dcpspow CPSPOPFW: (J.P.Burnet) surtout 2007 mais à voir (pas dans meeting) CPSPOPlan of SMH57-61(A Beuret) pour zone Est CPSRFlow levelRFS.H.

8 27 October 2005Technical Committee PS Complex & SPS controls updates from Nov 2004 up to startup 2006 MachineSystemActionWhoImpacts SPSAPPLICBred: changed to allow more than 60 FECs (on SPS) SPSDSCBlocking->TTL adapters for remote reset on RIO8064 to be changedCO SPSTimingReplace TG3s by CTRVs in Faraday CageCO, RF SPSAPPLICRF- applics to modify for new Timing in Faraday cageCO-RF SPSSL-Equip not CMW compatibleCO SPSC-Tree replaced by LSACO-OP SPSTZ compatibility ( C-tree, SL-EQUIP/SEM, ROCS)CO SPSSetting management for RF,Kicker,Ring Orbit..OP SPSNew HW Interlocks (CNGS, TT60…)CO SPSSSIS (Needs CCC HW)CO-OP SPSMove to FESA of BDI equipment SPSMulti-Cycle Logging (Statistics)OP SPSVACMove to PVSS-v3, include North AreaVAC APPLIC VAC statistics (windows) pgm for PSB: get rid of J.M.Elyn’s pgm: work agreed to be done by AT/VAC VAC

9 27 October 2005Technical Committee (Based on J.W. CO Review -To be completed…) Timing moved to PS Style –Faraday Cage rebuild –RF applics to adapt SL-Equip not CMW compatible C-Tree: planned to be replaced by LSA TZ: still runs in 2006 – needs Ctree, SL-Equip/SEM,ROCS Other Settings Mgt (RF,Kicker,Ring Orbit..) Move to FESA –LTIM –BDI New HW Interlocks (CNGS, TT60…) SSIS (Needs CCC HW) Multi-Cycle Logging (Statistics)

10 27 October 2005Technical Committee FESA classes implemented in Injector Complex (excl. LEIR) MachineClassFront-endsMotivationWho PSBLTIM dpsbtbc1, dpsbblmlhctest beam LEIRIoan K. PSBBCTR sw devt CTFLTIMdctfmtv1 LIN3LRFSCdln3rf1 Jose Marques (LEIR)POWDF7000 REXREXRFcfc-170-rxplcgw REXREXPOWPpcgw18? REXREXDanfysikcfc-170-rxpow