Presentation is loading. Please wait.

Presentation is loading. Please wait.

40S Applied Math Mr. Knight – Killarney School Slide 1 Unit: Design & Measurement Lesson: DM-L2 Construction Costs Learning Outcome B-3 DM-L2 Objectives:

Similar presentations


Presentation on theme: "40S Applied Math Mr. Knight – Killarney School Slide 1 Unit: Design & Measurement Lesson: DM-L2 Construction Costs Learning Outcome B-3 DM-L2 Objectives:"— Presentation transcript:

1 40S Applied Math Mr. Knight – Killarney School Slide 1 Unit: Design & Measurement Lesson: DM-L2 Construction Costs Learning Outcome B-3 DM-L2 Objectives: Apply the unit cost of materials and labour to a measured project, in order to determine an overall cost.

2 40S Applied Math Mr. Knight – Killarney School Slide 2 Unit: Design & Measurement Lesson: DM-L2 The cost of construction is a factor that must be considered when building something. If the cost is too high, the project may have to be modified or cancelled. In this lesson, you will use your knowledge of perimeter, area, surface area, and volume, as well as costs of construction materials and labour, to determine the total costs of building projects. Theory – Intro

3 40S Applied Math Mr. Knight – Killarney School Slide 3 Unit: Design & Measurement Lesson: DM-L2 You plan to install a driveway as pictured in the drawing below. Sample Problem

4 40S Applied Math Mr. Knight – Killarney School Slide 4 Unit: Design & Measurement Lesson: DM-L2 There are two choices for finishing the driveway. The first method is to use concrete 4" thick over a layer of gravel 1 ft deep. Sample Problem – cont’d The second method is to use paving stones which are placed over 1 ft. of crushed limestone covered by 3.5 in. of sand, as shown in the diagram. The paving stones are 2.5 in. thick, and you need to allow 10 percent for waste because of breakage and cutting.

5 40S Applied Math Mr. Knight – Killarney School Slide 5 Unit: Design & Measurement Lesson: DM-L2 For each method of hard surfacing the driveway, the present earth driveway will have to be excavated to the necessary depth. The costs of materials and excavation are as follows: Sample Problem – cont’d Excavation costs:$60.00/yd 3 Gravel:$12.00/ yd 3 Concrete:$130.00/ yd 3 Crushed limestone:$15.00/ yd 3 Sand:$4.00/ yd 3 Paving stones:$2.25/ ft 2

6 40S Applied Math Mr. Knight – Killarney School Slide 6 Unit: Design & Measurement Lesson: DM-L2 Compare costs for the two methods for a driveway that has the measurements shown on the diagram above. Do not include the costs of labour (you and your buddies will be doing the work). Do include the costs of PST and GST for all materials, and GST only for the cost of excavation. PST and GST are 13 percent total. Sample Problem – cont’d

7 40S Applied Math Mr. Knight – Killarney School Slide 7 Unit: Design & Measurement Lesson: DM-L2 Solution


Download ppt "40S Applied Math Mr. Knight – Killarney School Slide 1 Unit: Design & Measurement Lesson: DM-L2 Construction Costs Learning Outcome B-3 DM-L2 Objectives:"

Similar presentations


Ads by Google