Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hennepin County Transportation Systems Plan (HC-TSP) Traffic Forecasting Model.

Similar presentations


Presentation on theme: "Hennepin County Transportation Systems Plan (HC-TSP) Traffic Forecasting Model."— Presentation transcript:

1 Hennepin County Transportation Systems Plan (HC-TSP) Traffic Forecasting Model

2  Model initially developed in 1997-98  Derived from Met Council Regional Model  Minor Updates in 2000 & 2002  Conversion from TRANPLAN / TransPro to TransCAD begun in 2004 Background

3 Model Features  Land Use Based (sq-ft, Dwelling Units, etc.) – linked to Countywide parcel database  Strong GIS Linkage (ArcGIS)  Only Vehicle Trips Modeled  3-Purposes for Trip Productions / Attractions (HBW, HBO, NHB)  Trip Generation via ITE trip rates

4

5 Model Characteristics  To accurately depict Arterials – must model one level below (to collector street level) – this requires 50% increase in nodes / links

6 Model Characteristics  Huge databases to manage (parcel database 350,000+ records)

7 Model Characteristics  Met Council TAZ’s split about 3:1 500 Met Council TAZ -> 1,500 HC TAZ

8 Model Characteristics  High level of ADT calibration

9 Why TransCAD ?  Some previous familiarity with the package – had dabbled with Demo copy in 2003-04  Local Road Research Board Project in 2004 – Snowplow routing (2 licenses purchased)  Package had ITE Trip Generation built-in  Good GIS compatibility with ArcView

10 Status of Model Refinements  Existing Land Use verification completed (required 1-1/2 year effort)  TAZ’s refined – parcels allocated to both Met Council and Hennepin County TAZ’s  First attempt for existing trip generation completed

11

12

13 Schedule


Download ppt "Hennepin County Transportation Systems Plan (HC-TSP) Traffic Forecasting Model."

Similar presentations


Ads by Google