1 1 Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL HQ, Sep 2012 Current ASM process

2 2 Flexible Use of Airspace (FUA) Concept Flexible use of airspace is an airspace management concept described by the International Civil Aviation Organisation (ICAO) and developed by the European Organisation for the Safety of Air Navigation (Eurocontrol), according to which airspace should not be designated as either purely civil or purely military airspace, but should rather be considered as one continuum in which all users’ requirements have to be accommodated to the maximum extent possible.

3 3 ASM process Network Manager National AMC Military planning NEGOTIATION Military Users Civil Service Providers Civil users Civil demand Network Consistency NATIONAL PLAN

4 4 Enablers at Local, FAB and Network level Consistent Airspace Data National AMCs Sharing airspace demands at regular times (from snapshots to rolling airspace plans) Collaborative Decision Making (CDM) System support

5 5 Ensuring a 'Flexible Use of Airspace'…. Current ASM/ATFCM ANDERS HALLGREN Manager ASM procedures DNM/COO/NOM/OPL/PRO EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL HQ, Sep 2012 Processes and Interfaces

6 Click to edit Master title style 6 Exploit airspace availability Consistent application of FUA Safe, efficient and accurate data flows  Rolling UUP  Procedure 2&3  EAW  CDR network  TRA/TSA clarification  FL publication  CBA designation  Support Stakeholders  CDR inconsistencies  B2B  NOP portal  CIAM  ASM Support Systems ASM Improvements Initiative

7 Click to edit Master title style 7 Deliverables Achieved

8 Click to edit Master title style 8 Improved Processes and Procedures Procedure 1: –At pre-tactical level assess impact by expected airspace allocation Procedure 2: –Better exploitation of airspace opportunities on the day of operation

9 Click to edit Master title style 9 Improved Processes and Procedures Procedure 3 –Enhanced flexibility on the day of operations ATCO: –Tactical rerouting Rerouting via IFPS reprocessing = lower workload AO: –less overbooking on D-1 more capacity, –predictability, –less tactical actions by air crew

10 Click to edit Master title style ASM/ATFCM Process Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) Network impact assessment NM AUP UUP 1 Notificati on UUP 2 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request CFMU ENV Database Update eAUP Coordination Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D)

11 Click to edit Master title style ASM/ATFCM Process Network impact assessment Coordination Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) NM AUP UUP 1 Notificati on UUP 2 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request CFMU ENV Database Update eAUP Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D) Network impact assessment Coordination

12 Click to edit Master title style ASM/ATFCM Process FPLs CFMU ENV Database Update eAUP Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) Network impact assessment NM AUP UUP 1 Notificati on UUP 2 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request Coordination Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D) CFMU ENV Database Update eAUP FPLs

13 Click to edit Master title style 13 UUP ASM/ATFCM Process Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) Network impact assessment NM AUP UUP 1 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request CFMU ENV Database Update eAUP Coordination Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D) UUP 1 UUP 2

14 Click to edit Master title style ASM/ATFCM Process Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) Network impact assessment NM AUP UUP 1 Notificati on UUP 2 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request CFMU ENV Database Update eAUP Coordination Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D) Notification

15 Click to edit Master title style ASM/ATFCM Process Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) Network impact assessment NM AUP UUP 1 Notificati on UUP 2 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request CFMU ENV Database Update eAUP Coordination Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D) Rerouting Proposals to AOs

16 Click to edit Master title style ASM/ATFCM Process Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) Network impact assessment NM AUP UUP 1 Notificati on UUP 2 Notificati on Earlier area deactivat ion Coordin. with other Users D-1D Final airspace Request > Earlier area deactivat ion >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15>09.15> React (CGH, CNL or new FPL) Coordin. with AMC CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Coordin. with other Users Coordin. with AMC Final CDR Request CFMU ENV Database Update eAUP Coordination Draft UUP 1 Network and Local assessments Coordination with Users Draft UUP Network and Local assessments Coordination with Users Coordination with AMC Requests fine-tuning (D) Requests fine-tuning (D) React (CHG, CNL or new FPL) React (CHG, CNL or new FPL)

17 Click to edit Master title style 17 UUP PUBLICATION D D-1D-OPS Winter time

18 Click to edit Master title style 18 UUP PUBLICATION D-OPS D-OPS Winter time

19 Click to edit Master title style 19 CDR Network

20 Click to edit Master title style 20 Uptake CDRs

21 Click to edit Master title style 21 Rolling UUP

22 Click to edit Master title style 22 Rolling UUP

23 Click to edit Master title style 23 UUP Publication March 2012 Not Using CIAM Using UUP Not Using UUP

24 Click to edit Master title style 24 Improved Economies

25 Click to edit Master title style 25 Environmental Benefits

26 Click to edit Master title style 26 Ensuring a 'Flexible Use of Airspace'…. Thank you for attention!