Presentation is loading. Please wait.

Presentation is loading. Please wait.

Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop 20-21 September 2012.

Similar presentations


Presentation on theme: "Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop 20-21 September 2012."— Presentation transcript:

1 Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop 20-21 September 2012

2 ASM Directions of Work - Statement The vision: 1.INTRODUCES a performance driven ‘modus operandi’ based on management of Airspace Configurations 2.PROVIDES processes that support utilisation of more dynamic and flexible elements 3.DESCRIBES a seamless ASM/ATFCM/ATS process with advanced real time management of Airspace Configurations as well as continuous sharing of information enabled by SESAR

3 Airspace Configurations – Background Airspace Configuration (as defined in the Airspace Strategy and mentioned in the SESAR Target Concept of Operations [2.2.4.1.3]): “Is a pre-defined and coordinated organisation of routes and their associated airspace structures, temporary airspace reservations and ATC sectorisation ”

4 FUA 2017 Directions of Work Current v. New Levels 1,2 & 3 fixed in time Levels 1,2 & 3 interactive Independent national ASM Consolidated Network mngt Fixed ATS Route System Free Route Airspace (FRA) Fixed Scenarios Dynamic Airspace Configurations Time constrained snapshotsAMC & FMP separatedFixed sectors Proactive sector management Static TRA/TSAs Moving/Mobile/Variable Areas CDRs Conditional Structures (CDS) Europe-wide CBO sharing CBO only between neighbours AUP, CRAM, eAMI,….. SWIM enabled NOP Continuous process Integrated civil/military function

5 Airspace Configurations – Background Airspace Configurations : Comprise: Pre-defined fixed or flexible route options Optimised trajectories (e.g. FRA) Optimised sectorisation Environmental constraints (if determined) Initially expected: To be pre-planned strategically Capable of being dynamically adapted To respond to different performance objectives Finally expected: To become fully dynamic (towards 2020+)

6 Airspace Configuration – Cycle Strategic Level 1 Pre-tactical Level 2 Tactical Level 3 OPERATIONS 1 H before OPSDays before OPS Years before OPS High Level Policy BodyEUR Network ManagerCivil Airspace UsersMilitary Airspace Users Integrated Civ/Mil Function (AMC/FMP/Sector planning) Civil AOsMilitary AOsEUR Network Manager Integrated Civ/Mil Function (AMC/FMP/Sector planning) EUR Network Manager Civil ATS UnitMilitary ATS UnitCivil AOsMilitary AOs

7 Airspace Configuration – Deliverables Strategic Level 1 Days before OPS Year(s) before OPS High Level Policy BodyEUR Network ManagerCivil Airspace UsersMilitary Airspace Users SES II Regulations European airspace policy Cross-Border airspace policy National/FAB airspace policy National/FAB airspace design and AOM Local/FAB/Network capacity/complexity constraints Local/FAB/Network performance targets Historical/anticipated civil traffic demand Historical/anticipated military traffic demand Environmental constraints (e.g. quotas) PRELIMINARY (PREDEFINED) AIRSPACE CONFIGURATION SENT TO NOP

8 Airspace Configuration – Deliverables Pre-tactical Level 2 1 H before OPS Days before OPS AGREED (REFINED) AIRSPACE CONFIGURATION Planned activation of Airspace Structures, e.g. FRA Civil and Military traffic demand Anticipated Hot-spots Anticipated over demanding flows Reserved/segregated airspace requests Anticipated airport constraints Known environmental constraints Anticipated capacity/complexity constraints Weather constraints Anticipated sector number, layout, configuration Staff Integrated Civ/Mil Function (AMC/FMP/Sector planning) Civil AOsMilitary AOsEUR Network Manager SENT TO NOP

9 Airspace Configuration – Deliverables Pre-tactical Level 2 X H before OPS Days before OPS Planned activation of Airspace Structures, e.g. FRA Civil and Military traffic demand Anticipated Hot-spots Anticipated over demanding flows Reserved/segregated airspace requests Anticipated airport constraints Known environmental constraints Anticipated capacity/complexity constraints Weather constraints Anticipated sector number, layout, configuration Staff Integrated Civ/Mil Function (AMC/FMP/Sector planning) Civil AOsMilitary AOsEUR Network Manager CONTINUOUSLY: NEW AIRSPACE CONFIGURATION FOR EVERY NEXT TIME PERIOD! SENT TO NOP

10 Airspace Configuration – Deliverables Tactical Level 3 Until next Hour 1 H before OPS Civil and/or Military Ad Hoc request Real-time Hot-spots Real-time critical flows (e.g. in FRA)Real-time airport constraintsReal-time ATC sector constraints Real-time local and/or FAB airspace performance Sudden real-time constraints (e.g. security)Sudden adverse weather constraints (e.g. CB) FINETUNED AIRSPACE CONFIGURATION SENT TO NOP Integrated Civ/Mil Function (AMC/FMP/Sector planning) EUR Network Manager Civil ATS Unit Military ATS Unit Civil AOs Military AOs

11 ASM Directions of Work – Work Area 2 Development of Airspace Configuration Process 2012-2017 Develop detailed criteria for definition of Airspace Configuration Develop process and procedures for Airspace Configurations development Define roles and responsibilities of actors involved Describe functioning of the Joint Civil-Military function Describe the required dynamism Develop operational requirements for systems supporting ACs Define final ops requirements and implement in the network system Promote local/regional CDRM processes

12 Thank you for your attention!


Download ppt "Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop 20-21 September 2012."

Similar presentations


Ads by Google