Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operativni program Slovenija– Avstrija 2007–2014/Operationell Programm Slowenien-Osterreich 2007-2014 Fifth working meeting of the MURMAN project in Fehring,

Similar presentations


Presentation on theme: "Operativni program Slovenija– Avstrija 2007–2014/Operationell Programm Slowenien-Osterreich 2007-2014 Fifth working meeting of the MURMAN project in Fehring,"— Presentation transcript:

1 Operativni program Slovenija– Avstrija 2007–2014/Operationell Programm Slowenien-Osterreich Fifth working meeting of the MURMAN project in Fehring, Austria, on 11 October 2012 MURMAN project, Fehring, Austria, 11 October

2 UVOD / INTRODUCTION  WP1, WP 4 – responsible partner  WP 2 and WP 3 – working partner  Activities planed /Work done  1st period: –  2nd period: –  Activities planed  the 3rd reporting period MURMAN project, Fehring, Austria, 11 October

3 NAČRTOVANE AKTIVNOSTI / ACTIVITIES PLANED_WP1  Coordination of project partners regarding project handling  Coordination of interaction between project partners  Synoptic work schedule ( ) MURMAN project, Fehring, Austria, 11 October

4 IZVEDENO DELO / WORK DONE  Synoptic work schedule ( )  meeting minutes MURMAN project, Fehring, Austria, 11 October

5 REZULTATI / RESULTS  Meeting minutes  Project – arhive MURMAN project, Fehring, Austria, 11 October

6 RAZMERJA DO DRUGIH DP / RELATIONS TO OTHER WP  Main objective – cooperation between partners  Specific topics  WP2_Development of database for collection and management of groundwater measurement/quality data  WP4_Web-page development/Data visualisation MURMAN project, Fehring, Austria, 11 October

7 ČASOVNICA - NAČRT AKTIVNOSTI / ACTIVITIES PLANNED BY WP  Synoptic work schedule ( )  Date of the next meeting  2 W March 2013 (proposal)  Apaško polje - Zgornje Konjišče  Minutes  corrective action  draft version prepared in 1 W  partner answer – 2 W  minutes from past period can not be corrected MURMAN project, Fehring, Austria, 11 October

8 NAČRTOVANE AKTIVNOSTI / ACTIVITIES PLANED_WP4  Development of a Web-based information system  Workshops and excursions  Preparation of different brochures and other information materials  Organisation of a scientific conference  Creation of a platform for all water suppliers in the project region MURMAN project, Fehring, Austria, 11 October

9 IZVEDENO DELO / WORK DONE  Development of a Web-based information system  visualisation of the Austrian – Slovenian web site (some more details in pm section)  Workshops and excursions  Synoptic work schedule  Dan evropskega sodelovanja/Der Tag der Europäischen Zusammenarbeit MURMAN project, Fehring, Austria, 11 October

10 IZVEDENO DELO / WORK DONE  Organisation of a scientific conference  starting activities (some more details in pm section)  Creation of a platform for all water suppliers in the project region  starting activities (some more details in pm section) MURMAN project, Fehring, Austria, 11 October

11 REZULTATI / RESULTS  Development of a Web-based information system  Web site activity and use  Workshops and excursions  minutes  Dan evropskega sodelovanja/Der Tag der Europäischen Zusammenarbeit- minutes, photos, film MURMAN project, Fehring, Austria, 11 October

12 REZULTATI / RESULTS  Organisation of a scientific conference  proposal for scientific and organisational Committee  Creation of a platform for all water suppliers in the project region  Problemska konferenca komunalnega gospodarstva/Problem conference of the public utility sector MURMAN project, Fehring, Austria, 11 October

13 RAZMERJA DO DRUGIH DP / RELATIONS TO OTHER WP  Main objective  dissemination  cooperation with other partners  Specific topics  WP2_Development of database for collection and management of groundwater measurement/quality data MURMAN project, Fehring, Austria, 11 October

14 ČASOVNICA - NAČRT AKTIVNOSTI / ACTIVITIES PLANNED BY WP  Organisation of a scientific conference  proposal 1/  Creation of a platform for all water suppliers in the project region  proposal ¼ 2013 MURMAN project, Fehring, Austria, 11 October

15 NAČRTOVANE AKTIVNOSTI / ACTIVITIES PLANED_WP2 - cooperation  Development and operation of virtual database  Groundwater monitoring and assessments  Identification of individual groups of contaminant causes and the individual influence of contaminants on the ground water  Risk assessment of freshwater supply systems Apaškega polja MURMAN project, Fehring, Austria, 11 October

16 IZVEDENO DELO / WORK DONE  Development and operation of virtual database  statistically evaluated data  Slo ground water:  Slo drinking water:  Slo river Mura: MURMAN project, Fehring, Austria, 11 October

17 IZVEDENO DELO / WORK DONE  Identification of individual groups of contaminant  NO3  atrazine, metabolite  Risk assessment of freshwater supply systems Apaškega polja  health aspects of the higher value of NO3 in drinking water MURMAN project, Fehring, Austria, 11 October

18 REZULTATI / RESULTS  Development and operation of virtual database  Identification of individual groups of contaminant  date prepared to use them in data base  date prepared for visualisation MURMAN project, Fehring, Austria, 11 October

19 RAZMERJA DO DRUGIH DP / RELATIONS TO OTHER WP  WP2_Development of database for collection and management of groundwater measurement/quality data  Styria, IEI, GSO MURMAN project, Fehring, Austria, 11 October

20 ČASOVNICA - NAČRT AKTIVNOSTI / ACTIVITIES PLANNED BY WP  Synoptic work schedule  On-line visualisation of the nitrate distribution chart of the Murtal and time development of the nitrate concentration - 12/2012 MURMAN project, Fehring, Austria, 11 October


Download ppt "Operativni program Slovenija– Avstrija 2007–2014/Operationell Programm Slowenien-Osterreich 2007-2014 Fifth working meeting of the MURMAN project in Fehring,"

Similar presentations


Ads by Google