Presentation is loading. Please wait.

Presentation is loading. Please wait.

Monte Rio – Original 3 Dimensional Drawing – Actual Plant

Similar presentations


Presentation on theme: "Monte Rio – Original 3 Dimensional Drawing – Actual Plant"— Presentation transcript:

1

2 Monte Rio – Original 3 Dimensional Drawing – Actual Plant
MONTE RIO POWER PLANT Monte Rio – Original 3 Dimensional Drawing – Actual Plant NOV 2001

3 Basic Project Specifications – 101 MWe
MONTE RIO POWER PLANT Basic Project Specifications – 101 MWe Owner: Monte Rio Power Corporation, Ltd. Contractors: Energy International, HMV Engineers, Caterpillar International Power systems, and SEG/AVK Engines: Cat Gensets model 9CM43 manufactured in Germany, with rated output of RPM Fuel: cSt/50 C heavy fuel oil Application: Independent Power Plant to Public Utility Generator: Phase synchronous generator 9,758 kVA, 13.8 kV, Hertz Switchyard: kV double bus bar substation, 3 transformers 47/70 MVA ONAN/ONAF, 13.2/138 kV, 2 line bays, control and monitoring Switchgear: High Voltage, low voltage, control and monitoring Waste Heat Boiler: Exhaust gas fired steam boiler 7493 kg/h (4849 kW) at 8 bar(g) NOV 2001

4 MRPC - Chronological Progress Report
MONTERIO 100 MW POWER PLANT PERSONAL EN OBRA DAY NIGHT CONTRACTOR STAFF LABOR TOTAL STAFF LABOR TOTAL HMV 97 263 360 ENERGY INTER. 2 2 CODEMON 43 279 322 2 62 64 TERMOTECNICA 2 23 25 METAL AMERICA 6 26 32 CONELCA 12 49 61 CEMEX 11 12 23 SECURITY 8 8 8 8 TOTAL 833 72 NOV 2001

5 MRPC - Chronological Progress Report
SITE LOCATION NOV 2001

6 Site Preparation DEC 2001

7 MRPC - Chronological Progress Report
2001 JAN 2002

8 MRPC - Chronological Progress Report
2001 JAN 2002

9 MRPC - Chronological Progress Report
2001 FEB 2002

10 MRPC - Chronological Progress Report
2001 MAR 2002

11 MRPC - Chronological Progress Report
Base No. 10 Base No. 9 Base No. 8 2001 MAR 2002

12 MRPC - Chronological Progress Report
2001 MAR 2002

13 MRPC - Chronological Progress Report
2001 APR 2002

14 MRPC - Chronological Progress Report
2001 APR 2002

15 MRPC - Chronological Progress Report
2001 MAY 2002

16 MRPC - Chronological Progress Report
2001 MAY 2002

17 MRPC - Chronological Progress Report
2001 MAY 2002

18 MRPC - Chronological Progress Report
2001 JUN 2002

19 MRPC - Chronological Progress Report
2001 JUN 2002

20 MRPC - Chronological Progress Report
2001 JUN 2002

21 MRPC - Chronological Progress Report
2001 JUL 2002

22 MRPC - Chronological Progress Report
2001 JUL 2002

23 MRPC - Chronological Progress Report
2001 AUG 2002

24 MRPC - Chronological Progress Report
2001 AUG 2002

25 MRPC - Chronological Progress Report
2001 AUG 2002

26 MRPC - Chronological Progress Report
2001 SEP 2002

27 MRPC - Chronological Progress Report
2001 SEP 2002

28 MRPC - Chronological Progress Report
2001 OCT 2002

29 MRPC - Chronological Progress Report
2001 OCT 2002

30 MRPC - Chronological Progress Report
2001 OCT 2002

31 MRPC - Chronological Progress Report
2001 NOV 2002

32 MRPC - Chronological Progress Report
2001 NOV 2002

33 MRPC - Chronological Progress Report
2001 NOV 2002

34 MRPC - Chronological Progress Report
2001 DEC 2002

35 MRPC - Chronological Progress Report
2001 DEC 2002

36 MRPC - Chronological Progress Report
2001 DEC 2002

37 MRPC - Chronological Progress Report
2001 2002 2003

38 MRPC - Chronological Progress Report
2001 2002 JAN 2003

39 MRPC - Chronological Progress Report
Testing of Units 2001 2002 FEB 2003

40 MRPC - Chronological Progress Report
Commercial Operations – April 2003 2001 2002 MAR 2003

41 MRPC - QUANTITIES OF MATERIALS SUPPLIED
CIVIL WORKS ITEM DESCRIPTION UNIT QUANTITY 1 EARTHMOVING M3 69,015.0 2 PILINGS (3,872 M3 OF CONCRETE) M (linear) 17,400.0 2 CONCRETE M3 8,616.2 2.1 CONCRETE FOR ENGINE BASES M3 2,188.0 2.2 STRUCTURAL CONCRETE M3 5,108.2 2.3 CONCRETE FOR INTERNAL ROADS (8,800 M2) M3 1,320.0 3 REINFORCED STEEL TON 1,212.6 4 METAL STRUCTURES TON 995.2 4.1 METAL STRUCTURE FOR POWERHOUSE TON 620.0 4.2 STRUCTURES FOR SMOKESTACKS TON 216.2 4.3 STRUCTURES FOR THE SUB-STATION TON 52.9 4.4 STRUCTURES FOR SIDING TON 33.9 4.5 ESTRUCTURE TO SUPPORT SILENCERS TON 7.2 4.6 PLATFORMS AND LADDERS TON 65.0

42 MRPC - QUANTITIES OF MATERIALS SUPPLIED
CIVIL WORKS ITEM DESCRIPTION UNIT QUANTITY 5 BUILDINGS M2 6,402.6 5.1 ADMINISTRATIVE BUILDING M2 455.4 5.2 GUEST HOUSE M2 352.1 5.3 FUEL TREATMENT HOUSE M2 184.0 5.4 POWER HOUSE M2 5,008.0 5.5 SUBSTATION M2 176.8 5.6 GATE HOUSE M2 15.3 5.7 INCINERATOR ENCLOSURE M2 26.0 5.8 SOLID WASTE MATERIAL ENCOLOSURE M2 33.4 5.9 WATER PUMP HOUSE M2 60.0 5.10 ENCLOSURE FOR SUBESTACION - GUEST HOUSE M2 31.0 5.11 EMERGENCY GENSET ENCLOSURE M2 43.2 5.12 ENCLOSURE EMERGENCY BATTERYS–POWER HOUSE M2 17.5 6 PERIMETER FENCING M (linear) 1,175.0

43 MRPC - QUANTITIES OF MATERIALS SUPPLIED
MECHANICAL ERECTION ITEM DESCRIPTION UNIT QUANTITY 1 PIPING 1.1 PREFABRICATION OF PIPING TON 169.1 1.2 PIPING ERECTION TON 289.8 2 MECHANICAL ERECTION OF EQUIPMENT TON 2,962.1 2.1 ERECTION OF ENGINES (9CM43-13 UND) TON 1,599.0 2.2 ERECTION OF GENERATORS (13 UND) TON 455.0 2.3 CHIMENEY STACKS (DIAMETER 1,220 MM) TON 129.4 2.4 EXHAUST DUCTS TON 27.7 2.5 COMBUSTION DUCTS TON 12.2 2.6 VENTILATION DUCTS TON 33.4 2.7 ERECTION AUX. EQUIPMENT SKID MODULES TON 372.5 2.8 AIR DUCTS TON 3.9 2.9 BOILER ASH TANK TON 1.4 2.10 RADIATORS FOR COOLING WATER TON 214.9 2.11 VENTILATION FANS MECHANICAL ANNEX, FUEL TREATMENT ENCLOSURE AND OTHERS TON 6.0 2.13 VENTILATION FANS FOR POWER HOUSE TON 89.6

44 MRPC - QUANTITIES OF MATERIALS SUPPLIED
MECHANICAL ERECTION ITEM DESCRIPTION UNIT QUANTITY 2.14 DIESEL EMERGENCY GENEREATOR TON 3.1 3 ERECTION OF PROCESS TANKS TON 76.4

45 MRPC - QUANTITIES OF MATERIALS SUPPLIED
ELECTRICAL ERECTION ITEM DESCRIPTION UNIT QUANTITY 1 LAYING OF MULTI-CONDUCTOR CABLE Km 72.9 2 LAYING OF MV CABLE IN CABLE TRAYS Km 7.6 6 INSTALLATION 600V CABLE MANOCONDUCTOR #3 + 1, 2 AWG Km 0.3 4 INSTALLATION GROUNDING SYSTEM CABLE 1/0 Km 2.5 3 INSTALLATION & ERECTION CABLE TRAYS M (linear) 3,598.0 5 INSTALLATION OF CONDIUT & ACCESSORIES M (linear) 2,600.0 6 MOVEMENT AND INSTALLATION OF ELECTRIC EQUIPMENT: INCLUDING A LARGE GROUP OF DIFFERENT EQUIPMENTSUCH AS CURRENT TRANSFORMERS, POWER TRANSFORMERS, VOLTAGE TRANSFORMERS, ISOLATORS, HOUSINGS AND CABINETS, INSTRUMENT PANELS, CONTROL PANELS, SWITCHES, CIRCUIT BREAKERS, ETC., ECT., ETC., THE INDIVIDUAL WEIGHTS OF THIS EQUIPMENT WAS NOT AVAILABLE.