Presentation is loading. Please wait.

Presentation is loading. Please wait.

Clean Sky 2 2 December 2013 F.F. Verduijn.

Similar presentations


Presentation on theme: "Clean Sky 2 2 December 2013 F.F. Verduijn."— Presentation transcript:

1 Clean Sky 2 2 December 2013 F.F. Verduijn

2

3

4

5

6 Clean Sky 2 Joint Technical Proposal

7

8 Clean Sky 2 Programme Overview
1.8b€ Total Funding Assumption Fraunhofer Gesellschaft Eco-Design Fast Rotorcraft Agusta Westland Eurocopter Large Passenger Aircraft Airbus Regional Aircraft Alenia Aermacchi Vehicle IADPs Airframe ITD Dassault – EADS-CASA – Saab Technology Evaluator (TE) German Aerospace Center (DLR) Large Systems ITDs Engines ITD Safran – Rolls-Royce – MTU Small Air Transport Evektor – Piaggio Systems ITD Thales – Liebherr Building on Clean Sky, going further into integration at full aircraft level And developing new technology streams for the next generations of aircraft CS2 Website (June 2013)

9

10

11 IADPs and ITDs detailed
Large Passenger 1- Large Passenger Aircraft (LPA) IADP - Michel Goulain (Airbus) F.pdf Regional 2- Regional Aircraft (R) IADP - Vito Perrupato, Alenia Aermacchi F.pdf Fast Rotorcraft 3a- Fast Rotorcraft IADP - Philippe Cabrit, Eurocopter F.pdf 3b- Fast Rotorcraft IADP - Colin Turner (AW) F.pdf Airframe 4- Airframe ITD - Alain Bouillon, Dassaut Aviation F.pdf Systems 6- Systems ITD - Marc Fabreguetter, Thales F.pdf Engines 5- Engines ITD - Keith Nurney, Rolls-Royce F.pdf SAT

12 SAT topics

13

14

15

16 Status Clean Sky 2 20 juni: Clean Sky-2 Joint Technical Proposal overhandigd aan de Europese Commissie op de Paris Airshow 27 juni: De Europese Commissie, het Europees Parlement en de EU-lidstaten zijn het eens over de meerjarenbegroting voor de komende 7 jaar van H2020 10 juli: Commission Proposal Innovation Package Barosso anounces: “The EU plans to invest maximum 1.8 bn€ in the Clean Sky 2 July: Proposed Technical Program (1.0) beschikbaar 12 november: Evaluation by Experts afgerond 21 november: General Kick-off Information session on Clean Sky 2 hierna infodagen door Europa

17 De weg naar de call for core partner
2-3 december “General Approach” van de Council verwacht tijdens de Competitiveness Council 9 januari: EP rapportage goedkeuring door ITRE commissie Februari: EP planair goedkeuring Maart: Council adoptie verwacht Maart/April Governing Board CS-2 -> adoption workplan, rules for indiening voorstellen en selectie en evaluatie criteria van de core partners Juni: launch call for core partners

18 Clean Sky info days

19 Budget Aviation in H2020 Transport share is 8.23% of overall H2020 budget. (H2020 transport budget is 70,2 B€). Share of Aviation in Transport is 45%. In case of 70B€ -> 5.76B€ transport -> aviation 2,6B€ (1B€ lager dan gevraagd, 0,5B€ hoger dan FP7) Gevraagd: Collaborative research is 1,2 B€, CS-2 1,8B€ and SESAR 0.6B€ (is above budget) Indien CS-2 en SESAR2 niet worden aangepast: Collaborative wordt 200M€ -> 1B€ lager dan begroot!

20 Core Partner selectie

21 Evaluatie van voorstellen

22 Conditions for participating as Core Partner

23

24

25

26

27 Nederlandse clusters, deelnemers en omvang
Scope, leader, deelnemers LPA/Airframe Airborne Fokker Aerstructures Fokker ELMO NLR TUD KE Works CoDet Engines Dutch Aero Atkins DAEC

28 Nederlandse clusters, deelnemers
Systems NDF TUD NLR Aeronamic Fokker Landing Gear Fast Rotorcraft Fokker Aerostructures Airborne Microflown

29 Nederlandse clusters, deelnemers
SAT ACQ ADSE Airborne AkzoNobel Microflown Selfly Technobis Fibre Technologies TUD TUE KVE Ten Cate Advanced Composites ALE AdCuenta

30 NL-clusterleiders

31 Cluster overleg Clusters intern
Ter voorbereiding van info/consultation days Coördinerend om bijdrages en budgeten af te stemmen Clusteroverleg tussen de NL clusters: 25 januari 28 maart 26 juni 4 juli 29 augustus 26 september 30 oktober

32 Questions?


Download ppt "Clean Sky 2 2 December 2013 F.F. Verduijn."

Similar presentations


Ads by Google