Download presentation
Presentation is loading. Please wait.
Published byXavier Stark Modified over 3 years ago
1
1 01 2 3 4 5 km
2
2 Preliminary volumes Zirkon Gamma Gross rock volume: 4,6 – 7,2 Mm 3 HCPV: 1,0 – 1,7 Mm 3 If oil; STOOIP: 0,8 – 1,3 SMm 3 Chance of making a discovery: 44% If discovery: chance of oil: 70% chance of gas: 30% Zirkon Beta Gross rock volume: 3,5 – 6,5 Mm3 HCPV: 0,7 – 1,6 Mm3 If oil; STOOIP: 0,5 – 1,3 SMm3 Chance of making a discovery: 50% If discovery: chance of oil: 50% chance of gas: 50% Zirkon Alfa Gross rock volume: 7,0 – 11,0 Mm3 HCPV: 1,4 – 2,8 Mm3 If oil; STOOIP: 1,1 – 2,2 SMm3 Chance of making a discovery: 69% If discovery: chance of oil: 40% chance of gas: 60% Jaspis Zirkon Alfa Zirkon Beta Zirkon Gamma 01 2 3 km
3
3 Top Brent; old interpretation Top Brent; new interpretation Zirkon Alfa Zirkon Beta Zirkon Gamma
4
4 Topp Ness Bunn kritt Topp NER ST8511R92 ST9607FAR Topp Tarbert Zirkon Beta
5
5 Topp Tarbert Topp Ness Bunn kritt Topp NER ST8511R92 ST9607FAR Zirkon Beta
6
6 1980 1940 1980 1900 Zirkon Gamma L 2795 L 2753 L 2795 (Far offset -96, WG) – Zirkon Gamma (north) L 2753 (Far offset -96, WG) – Zirkon Gamma (south)
7
7 ST 9607 far offset amplitudes draped on top of Tarbert structure Gullfaks Zirkon Gamma Zirkon Alfa Zirkon Beta B-35 gas South North Prospect evaluation focusing specifically on the; trapping geometry Evaluate of the process of the slump geometry. Discuss the fluid fill/migration route Establish a drilling and drainage strategy.
Similar presentations
© 2018 SlidePlayer.com Inc.
All rights reserved.
Ppt on childhood obesity Ppt on care of public property band Ppt on review writing software Ppt on ms access 2003 Ppt on boiler used in sugar factory Ppt on retail marketing Ppt on 2 stroke ic engines Ppt on networking related topics to accounting Ppt on natural and artificial satellites in space Ppt on 3 phase rectifier