Introduction & Up-date 20 th August 2012. Contents • The Background • The Teams • The Facilities • Location & Layout • The Planning • Communications •

Similar presentations


Presentation on theme: "Introduction & Up-date 20 th August 2012. Contents • The Background • The Teams • The Facilities • Location & Layout • The Planning • Communications •"— Presentation transcript:

1 Introduction & Up-date 20 th August 2012

2 Contents • The Background • The Teams • The Facilities • Location & Layout • The Planning • Communications • Your Input

3 The Background •Current Campus Designed for Max Capacity of 1200 students We are now c.1150 & growing •Campus Master Plan - completed 2008 Find it on InsideASH>Search “Campus Master Plan” Historically 5 small locations in & around The Hague New Campus 20 years ago MS “temporary” wing added 15 years ago New ES Wing in 2003 •Purchased Land from Municiapality of Wassenaar for ECC Boerderij (farm) Ter Weer (area name) Located on small Deijlerweg, 5/7 minutes walk Construction commenced early

4 The Background The key parties in the negotiations: • Municapality of Wassenaar – owned the land & farmhouse “Boerderij Ter Weer” •SJW Youth Club had clubhouse in the Farmhouse - were already being re-located by Gemeente •Olympia ‘72 Handball Club will share sports facilities •ASH – now own land & buildings 4

5 Location & Layout 5

6 6

7 7 •Ground cleared & prepared late 2011/ early 2012 •Groundbreaking Ceremony took place 16 th February 2012 •Handball fields complete (for new handball season) •Construction drawings & foundation work completed over the summer - passed a key risk phase •Sport complex and Gym due for completion end of December 2012 •Main ECC instructional areas doe for completion July •Currently on schedule – weather permitting •Now: Fixtures & Fittings & Landcaping The Planning

8 The Teams ASH ECC Project Team Tim Messick, Ton Ravensbergen, Rick Spradling, Hans Carmiggelt, Lesley Murphy, Project Managers (External) ECC Design Team Tim Messick, Fereshteh Dastani, Matthew Steuer, Ann Pleij, Carla Bruzual, Hans Carmiggelt, Project Managers External Project Manager – Themelion Arjen Brandon, Marije Bierenbroodspot Architect – Kraaijvanger Urbis Hans Goverde Landscape Architect – recently selected Design Studio Van Ginneken 8

9 Communications Stakeholders •Staff •Parents •Students •Board of Trustees •Client Companies •Neighbors •Municipality •Media How •Staff meetings •Display units •Flash & PTO Bulletin articles •InsideASH •Website •Newsletters •Internal & external events •Groundbreakin g Ceremony •Vist site •Completion of gymnasium building •landscaping •Official opening Frequency •Project meetings •on-site meetings •design team meetings •PTO Bulletin •Website up- dates •5 Newsletters (2 more to be completed) •Information evenings at ASH & Ter Weer •Communicate at all new phases of the project •www.ash.nl/ec c 9

10 Your Input Thank you for you valuable input to date. We welcome your ideas about any aspect of the project: Contact a member of The Design Team or The Project Team Watch out for up-dates on the website, InsideASH & PTO Bulletin Check out the model in the main entrance Get students involved Direct non-staff members with inquiries to Let us know in advance when you would like to visit – we’ll pick time slots per week - hard hats must be worn at all times on the construction site. 10