TÜRKİYE PETROLLERİ NATURAL GAS STORAGE MANAGEMENT SİLİVRİ UNDERGROUND NATURAL GAS STORAGE FACILITIES & CAPACITY EXTENSION PROJECTS FOR THE STORAGE FACILITIES.

Similar presentations


Presentation on theme: "TÜRKİYE PETROLLERİ NATURAL GAS STORAGE MANAGEMENT SİLİVRİ UNDERGROUND NATURAL GAS STORAGE FACILITIES & CAPACITY EXTENSION PROJECTS FOR THE STORAGE FACILITIES."— Presentation transcript:

1 TÜRKİYE PETROLLERİ NATURAL GAS STORAGE MANAGEMENT SİLİVRİ UNDERGROUND NATURAL GAS STORAGE FACILITIES & CAPACITY EXTENSION PROJECTS FOR THE STORAGE FACILITIES 1/6

2  Seasonal Balancing  Short-Term Peak Shaving  Security of Supply Time Excessive Supply Stored Excessive Demand Compensated Demand Supply Daily Natural Gas Demand & Supply Purposes of Gas Storage

3  Pore (Depleted Reservoirs)% 76.8  Aquifers% 14.8  Salt Caverns% 7.9  Abandoned Mines% 0.5 Salt Caverns Abandoned Mines Depleted Oil & Gas Fields & Aquifers Types of Gas Storage (Worldwide Distribution)

4 Silivri Gas Storage Facilities Layout DEĞİRMENKÖY Black Sea BOTAŞ Pipeline Bulgaria Greece Aegean Sea SHARED FACILITY Silivri İstanbul KUZEY MARMARA S E A O F M A R M A R A KUZEY MARMARA GATHERING STATION m -16’’ m -20’’ m -24’’ 4

5 Kuzey Marmara Field – Wells and Surface Facilities ~ 3000 m ~ 43 m ~1200 m STORAGE FACILITIES OFFSHORE WELLS ERD WELLS SURFACE FACILITIES

6 WELLS METERING SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATER HP SEP. SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATER HP SEP. Compressor Unit INLET FILTERS BOTAS Gas Line Flow Diagram of Injection Operation NATURAL GAS P.ADJ.

7 WELLS METERING SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATERS HP SEP. SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATERS HP SEP. Flow Diagram of Withdrawal Operation BOTAS Gas Line Compressor Unit Natural Gas P.ADJ.

8 Storage Performance

9 S T O R A G E S T O R A G E Commencement of Third-Party Access to the Storage Facilities TPAO - BOTAŞ Contract Storage History

10 hhttp://depolama.tpao.gov.tr Third Party Access

11 Capacity Reservations for the Storage Year

12 CAPACITY EXTENSION PROJECTS

13 Gas Cooler Absorber Separator Shared Facility Capacity Revision Maximum Withdrawal Rate : 20 MM Sm 3 /day

14 Mini Absorber

15 Storage Facilities Capacity Extension Projects  PHASE II – Değirmenköy Capacity Extension Project  Değirmenköy-Osmancık Formation  Batı Sinekli Field  PHASE III – Kuzey Marmara Capacity Extension Project

16 Phase-II Project (General) ≈2.3 km - 20” Pipeline Construction Additional Process Facility Design & Additional Wells Drilling Integrating Batı Sinekli and D.Köy Osmancık Res. into the System

17 Phase-II Project (Location)

18 Phase-III Project (General) New Surface Plant (NSP) 2 x m -24” Pipeline Construction Drilling new wells Addition of a new surface plant with a withdrawal rate of 50 MM Sm3/day

19 Phase-III Project (K.Marmara Location)

20 Phase-III Project (Platforms/Wells) OLD PLATFORM & OFF-SHORE WELLS ERD WELLS SHARED FACILITY (SF) 5 NEW SURFACE PLANT (NSP) 4 NEW PLATFORMS & NEW WELLS 4

21 Phase-III Project (Location of Facilities) New Surface Plant (NSP) Location Existing Shared Facility (SF)

22 Projection of the Storage Capacity

23 ISTANBUL nd WORLD PETROLEUM CONGRESS (WPC) WILL BE IN ISTANBUL IN 2017