1 STRATEGY NAME OF THE PRESENTATION
01 JANUARY 2014 TÜRKİYE PETROLLERİ SİLİVRİ UNDERGROUND NATURAL GAS STORAGE FACILITIES & CAPACITY EXTENSION PROJECTS FOR THE STORAGE FACILITIES NATURAL GAS STORAGE MANAGEMENT STRATEJI PPT TEMPLATE

2 Purposes of Gas Storage
Seasonal Balancing Short-Term Peak Shaving Security of Supply Time Excessive Supply Stored Excessive Demand Compensated Demand Supply Daily Natural Gas Demand & Supply

3 Depleted Oil & Gas Fields
Types of Gas Storage (Worldwide Distribution) Pore (Depleted Reservoirs) % 76.8 Aquifers % 14.8 Salt Caverns % Abandoned Mines % Depleted Oil & Gas Fields & Aquifers Salt Caverns Abandoned Mines

4 Silivri Gas Storage Facilities Layout
DEĞİRMENKÖY Black Sea BOTAŞ Pipeline Bulgaria Greece Aegean Sea SHARED FACILITY Silivri İstanbul KUZEY MARMARA S E A O F M A R M A R A KUZEY MARMARA GATHERING STATION 2 1 3 m -16’’ 3.170 m -20’’ 4.500 m -24’’ 4 1 2 4 3

5 Kuzey Marmara Field – Wells and Surface Facilities
3 2 1 ~ 3000 m ~ 43 m ~1200 m STORAGE FACILITIES OFFSHORE WELLS ERD WELLS SURFACE FACILITIES 1 2 3

6 Flow Diagram of Injection Operation
SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATER HP SEP. P.ADJ. SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATER HP SEP. METERING INLET FILTERS Compressor Unit NATURAL GAS WELLS BOTAS Gas Line

7 Flow Diagram of Withdrawal Operation
SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATERS HP SEP. P.ADJ. SLUG CATCER HC DEWPOINT ABSORBER TEG REGEN. HEATERS HP SEP. METERING Compressor Unit Natural Gas WELLS BOTAS Gas Line

8 TPAO - SUNUM ADI 01 OCAK 2014 Storage Performance

9 Commencement of Third-Party Access to the Storage Facilities
Storage History Commencement of Third-Party Access to the Storage Facilities TPAO - BOTAŞ Contract S T O R A G E

10 Third Party Access

11 Capacity Reservations for the 2014-2015 Storage Year

12 CAPACITY EXTENSION PROJECTS
12

13 Shared Facility Capacity Revision
Gas Cooler Separator Absorber Maximum Withdrawal Rate : 20 MM Sm3/day

14 Mini Absorber 14

15 Storage Facilities Capacity Extension Projects
PHASE II – Değirmenköy Capacity Extension Project Değirmenköy-Osmancık Formation Batı Sinekli Field PHASE III – Kuzey Marmara Capacity Extension Project

16 Phase-II Project (General)
≈2.3 km - 20” Pipeline Construction Additional Process Facility Design & Additional Wells Drilling Integrating Batı Sinekli and D.Köy Osmancık Res. into the System

17 Phase-II Project (Location)

18 Phase-III Project (General)
New Surface Plant (NSP) 2 x m -24” Pipeline Construction Drilling new wells Addition of a new surface plant with a withdrawal rate of 50 MM Sm3/day

19 Phase-III Project (K.Marmara Location)

20 Phase-III Project (Platforms/Wells)
5 3 2 1 4 4 1 OLD PLATFORM & OFF-SHORE WELLS ERD WELLS 2 SHARED FACILITY (SF) 3 5 NEW SURFACE PLANT (NSP) 4 NEW PLATFORMS & NEW WELLS

21 Phase-III Project (Location of Facilities)
New Surface Plant (NSP) Location Existing Shared Facility (SF)

22 Projection of the Storage Capacity

23 STRATEGY NAME OF THE PRESENTATION
01 JANUARY 2014 ISTANBUL 2017 Thank you for your kind attention. 22nd WORLD PETROLEUM CONGRESS (WPC) WILL BE IN ISTANBUL IN 2017 TPAO ACTIVITIES