®® Wyoming Municipal Power Agency 2011 Integrated Resource Plan Public Webinar Series Part 1: Study Introduction & Background.

Similar presentations


Presentation on theme: "®® Wyoming Municipal Power Agency 2011 Integrated Resource Plan Public Webinar Series Part 1: Study Introduction & Background."— Presentation transcript:

1 ®® Wyoming Municipal Power Agency 2011 Integrated Resource Plan Public Webinar Series Part 1: Study Introduction & Background

2 ®® Agenda Study Purpose Study Methodology WMPA Background Next Steps

3 ®® Study Purpose Balance costs of supplying electricity versus saving electricity Balance costs of supplying electricity versus saving electricity Determine long range future power supply

4 ®® Overview of Study Process Data Collection Peer Benchmarking & DSM Program Development for Demand Side Options Cost Estimates & Performance Development for Supply Side Options Supply Side Analysis Base Case Deterministic Scenario Case(s) Supply Side Analysis Base Case Deterministic Scenario Case(s) Demand Side Screening Benefit/Cost Tests Projected Impact Demand Side Screening Benefit/Cost Tests Projected Impact Avoided Cost $ Integrated Analysis Reporting & Presentations Load Forecast Review/Development Load Forecast Review/Development Supply-Side Analysis Track Demand-Side Analysis Track Kick Off Meeting Review Demand Side Appliance Saturation Load Control Options Existing Programs Review Demand Side Appliance Saturation Load Control Options Existing Programs Review Supply Side Reports Plans Contracts Review Supply Side Reports Plans Contracts Supply Analysis Milestone Meeting Supply Analysis Milestone Meeting DSM Screening Milestone Meeting DSM Screening Milestone Meeting

5 ®® Study Methodology Develop 25-year Load Forecast Ability of existing resources to meet future load demand Develop ModelEvaluation of demand side management Evaluation of supply side options Evaluation of integrated supply and demand side Conclusion & Recommendations Propose a 5- and 25-year plan to meet needs

6 ®® WMPA Background Wholesale provider for 8 power communities: Total of 15,500 customers in 2010

7 ®® WMPA Background Wholesale provider for 8 power communities: Total of 15,800 customers in 2010 CityCustomersPercentage Cody7,19746% Ft. Laramie1911% Guernsey7835% Lingle2872% Lusk1,1878% Pine Bluffs7865% Powell3,18020% Wheatland2,13814% Total15,762100%

8 ®® Customer Profile

9 ®® Existing Resources WMPA currently has four resources: UnitAbbreviationType Net Unit Capacity (MW) Laramie River Station LRS Coal23 Loveland Area Project LAP Hydro12 Salt Lake City Integrated Area Project SLCIP Hydro3 Dry Fork Station [1] DFS Coal26 Total65 [1] Expected Commercial Date of Operation is 8/1/2011

10 ®® Balance of Loads and Resources

11 ®® Load Duration Curve: 2012

12 ®® Load Duration Curve: 2022

13 ®® Next Steps Continuing Public Webinar Series: –Part 1 – Study Introduction & Background June 22: 12:00-1:00 pm Mountain Time –Part 2 – Demand Side Management June 29: 12:00-1:00 pm Mountain Time –Part 3 – Supply Side Options TBD –Part 4 – Integrated Analysis TBD

14 ®® Please send questions and comments to: irp@wmpa.org Visit WMPAs website for more information on the IRP: www.wmpa.org Thank you for your time. irp@wmpa.org www.wmpa.org Questions?