Initial Impact Assessment of CORS Technology for Land Surveying at BPN RI Imam Mudita 1, Rowland P. Sidjabat 2, Agustan 1, Heri Sudiarto 2, Farid Hendro.

Similar presentations


Presentation on theme: "Initial Impact Assessment of CORS Technology for Land Surveying at BPN RI Imam Mudita 1, Rowland P. Sidjabat 2, Agustan 1, Heri Sudiarto 2, Farid Hendro."— Presentation transcript:

1 Initial Impact Assessment of CORS Technology for Land Surveying at BPN RI Imam Mudita 1, Rowland P. Sidjabat 2, Agustan 1, Heri Sudiarto 2, Farid Hendro Adiyanto 2, Swasetyo Yulianto 1, Xerandy 1, Suryanto 1, Ruki Ardiyanto 1, Hari Priyadi 1, Sri Handoyo Mukti 1, Wawan Rusiawan 1 1 ) BPPT, 2 ) BPN RI 22/12/2009Footer1

2 CORS Technology 22/12/2009Footer2 Studying movement of the earths crust Reference datum research and precise orbit determinations, Augmentation services of GNSS for navigation, surveying and mapping (Source : Leica)

3 Technology Management Technology Impact Assessment a systematic attempt to foresee the consequences of introducing CORS technology in all spheres it is likely to interact with Strategic Environments – Opportunities – Challenges – Threats 22/12/2009Footer3 Surveyors are user Equipment costs are decreasing Other services of survey business Education. New jargon, new concepts. Requires effort to keep up- to-date with changes Danger that GNSS will become too easy. What else can the modern surveyor offer clients to maintain an advantage over competing professions?

4 Assessment Activities Collect and analyze existing documents/literatures – CORS systems and equipments – BPN RIs internal documentations BPN RI Cadastral Measurement Technical Standardization BPN RI Surveying Technical Manual and Instruction Guide Institutional Strategic Plan and Website of BPN-RI Survey and Interview – Local Land Title Offices (Kantah) Kabupaten Tangerang, Kota Bogor and Kota Bekasi – Data Center and Central Office of Survey, Survey and mapping of BPN RI 22/12/2009Footer4

5 STIP Methodology Scope Topic, Scope, Time Horizon Technology – Performances ; methods/algorithms (standardized or non standardized), accuracies, minimize distance dependent error, maximize use of satellite data, server or rover controlled network solution, traceability and repeatability, consistencies, cost of its development strategy (station distribution, scalability and hardware material component flexibility) and also business model between provider who supply the data and information and the user. – Information and telecommunication technology which feasible and performed practical, efective and reliable. – Alternative technology assessment could also be done to prevent technology failure so that we still have subsitute technologies. 22/12/2009Footer5

6 STIP Methodology Impact – what benefits are to be expected from CORS/JRSP technology economic and commercial, or environmental improvement, health benefits, or improvements in the social or political fabric of society – what needs does it satisfy, and – why is it superior to present, or rival technologies? Policy measures such as how much money invested, how much grant and subsidies given by the government during the development stage. Tax holiday offered in the services of the land titling. Training and program socialization, regulations and supporting facilities, even direct administrative support such as Program Larasita from BPN-RI. 22/12/2009Footer6

7 Fact Findings 22/12/2009Footer7 Nr.Point Order Target (points) Realisation (points) Remaining (points) Unit Cost (Rp) Cost (Rp) Devt Speed/yr (points) Time needed (yr) ,5 mio12,6 bio ,5 mio2,2 bio Technical Base Point (TDT) at BPN RI (BPN-RI, 2010) Furthermore, up to 2007 only ± ha from total ± of land parcel have been mapped, so the remaining ± ha have not been mapped (Rozak, 2010)

8 22/12/2009Footer8 Land Title Offices have interstation distance around ± 30 – 70 km. Data streaming (minimal) 4800 bit per seconds. Up to 1.4 Mb within an hour Kantah Kab. Tangerang experiencing an average of survey speed 100 land parcels and 30 control point per day using CORS technology Networked Transport of RTCM via Internet Protocol (NTRIP). Pilot Project

9 Existing & Expected Architecture 22/12/2009Footer9 Existing bandwidth allocated for each Local LTO 128 kbps, and bandwidth allocated for Deputi 1 BPN-RI (including master controller) 512 kbps. Around 400 of 500 Local LTO all over Indonesia have established data communications. Data communication provider depend on available local provider and their geographical location

10 22/12/2009Footer10 MessageDescriptionNo. of DataBytesBandwith (bps) 1004Extended L1&L2 GPS RTK Observables *ns Stationary RTK Ref. Stn. ARP w/ Ant. Hgt Antenna Descriptor & Serial Number Network Auxiliary Station Data GPS Combined Geometric and Ionospheric Correction Differences *ns GPS Network RTK Residual Message *ns Physical Reference Station Position Message The oretical bandwith of the main RTCM 3.1 messages for 12 satellites (GPS only) and including a transport layer of 48 bits Data Communication Aspect

11 Financial Aspect 22/12/2009Footer11 Point Order TDT Target as mandated by PMNA/Ka.BP N No. 3/97 Realisation upto 2009Remaining Average per year Average time needed TDT Cost per Point Cost per Ha Total Cost (million) PointHectarePointHectarePointYearRp Convensional 28,9906,69966,990,0002,29122,910, ,500,000 12, ,00014,0855,634,000885,91584,366,0003, ,500,000 2,214,787.5 Jumlah 2,227,388.0 CCORS/JRSP 113,010, ,0001,695,150.0

12 Business Process Aspect 22/12/2009Footer12 Nr.FactorPositive ImpactDrawbacks 1. Sophistication (accuracy) Accuracy improvement to prevent or solve overlapping parcels mapping problem Need trained surveyors & quality management 2.Easiness Easy to conduct & quality managementNeed IT & Communication technology infrasturucture support, and business process change to support the easiness 3.Speed With high measurement speed increase productivity and better services High risk in transmitting information 4.Maintenance Maintenances are relatively easierNeed special technician in IT and Communication technology 5.Cost Lower operational cost, lower charges to public Need high initial budget for investment to build especially base station/reference station and other supporting infrastructures 6.Supporting (IT) Increase surveyor capability in IT and data communication technology Need costs to upgrade surveyor capability and to provide bandwidth Technoware Impact

13 Business Process Aspect 22/12/2009Footer13 Nr.FactorPositive ImpactDrawbacks 1.Competency (qualification) Encourage surveyors to increase their capability Need costs to upgrade their qualification 2.PersonnelLesser survey personnelNeed effort to provide personnel 3.ProductivityIncrease productivity per surveyorNeed special expertise Need better capability 4.Culture/EthicModernized working environmentNeed to change work ethic Humanware Impact

14 Business Process Aspect 22/12/2009Footer14 Infoware Impact Orgaware Impact Nr.FactorPositive ImpactDrawbacks 1.Law & Regulation DeregulationsNeed adaptation to new regulations 2.Directives, Operating procedures Seamless operating proceduresNeed to make new user guide or operating manual 3.Process formReduce survey forms (paperless)Need digital recording equipment Nr.Influencing FactorPositive ImpactDrawbacks 1.Proses flowchartShortened workflowNeed adaptation to new working environment 2.Organization structureEfficient and right size organisationNeed organisation restructuring 3.Task & function, Job description Detail job descriptionsNeed adaptation to new job descriptions

15 Business Process Aspect 22/12/2009Footer15 Nr.FactorPositive ImpactDrawbacks 1.SpeedShortened measurement and mapping time Failures cause critical downtime 2.Service process Speeding up land titling processNeed socialisation about land titling process 3.CostLower cost of Technical Base Point development, and decrease land parcels measurement tarif Need accurate calculation to determine tarif 4.Data securityDigital recording with higher accuracyVulnerable to virus dan hardware failure 5.PoliticsPrevent horisontal & vertical conflict between public and government Public accountability Impact to Public

16 Summaries 22/12/2009Footer16 CORS/JRSP technology could potentially support BPN-RIs cadastral tasks and functions efficiently and effectively to survey and mapping land parcels challenges such as : 1.provide national cadastral reference point network, 2.accelerate land parcels survey and mapping problem solving 3.unifying coordinate reference system of land titling which is in turn to give certificate on a land parcel There are many remaining infrastructure problems and constrains in applying CORS technology, such as Information and Data Communication infrastructure, which will be facing a high risk of failure especially in giving real time services. Therefore, in the near future it should need improvements and comprehensive actions to overcome those infrastructure problems before this technology is widely applied by BPN-RI

17 Recommendations 22/12/2009Footer17 Need to have strategic plan, including scheduling and budgeting to implement CORS system all over Indonesia. The strategic plan should consider aspect such as: 1.Improvements and up-gradable of hardware and software of the system 2.Futuristic data security improvement Improvement on data management, human resources development, defining business process and CORS system maintenance.

18 Thank You 22/12/2009Footer18