Data: 3 a 10 de novembro de 2008 Lisboa, Londres, Madri e Frankfurt CONCESSIONS OF RAILROADS CLEILSON QUEIROZ VALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS.

Similar presentations


Presentation on theme: "Data: 3 a 10 de novembro de 2008 Lisboa, Londres, Madri e Frankfurt CONCESSIONS OF RAILROADS CLEILSON QUEIROZ VALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS."— Presentation transcript:

1 Data: 3 a 10 de novembro de 2008 Lisboa, Londres, Madri e Frankfurt CONCESSIONS OF RAILROADS CLEILSON QUEIROZ VALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS S.A.

2 NORTH - SOUTH RAILROAD (EF 151) THE SUB-CONCESSION OF THE SECTION PALMAS (TO) –ESTRELA DOESTE (SP) THE SUB-CONCESSION OF THE SECTION PALMAS (TO) – ESTRELA DOESTE (SP) WEST - EAST INTEGRATION WEST - EAST INTEGRATION RAILROAD(EF 334) THE SUB-CONCESSION OF THE SECTION FIGUEIRÓPOLIS (TO) – ILHÉUS (BA) THE SUB-CONCESSION OF THE SECTION FIGUEIRÓPOLIS (TO) – ILHÉUS (BA)

3 Public company of the Ministry of Transport. Purpose: construction and operation of Brazilian railway infrastructure. VALEC - Engenharia, Construções e Ferrovias S.A.

4 RAILWAY CONCESSIONS OF VALEC RAILWAY CONCESSIONS OF VALEC BELÉM PANORAMA FIGUEIRÓPOLIS ILHÉUS LITORAL DO RIO DE JANEIRO RIO DE JANEIRO BOQUEIRÃO DA ESPERANÇA PORTO MURTINHO EF 151 EF 334 EF 234 EF 267

5 NORTH - SOUTH RAILROAD : CURRENT STAGE OF CONSTRUCTION BELEM ACAILANDIA COLINAS DO TOCANTINS TOCANTINS ANAPOLIS ESTRELA D`OESTE DESIGNED CONCLUDED UNDER CONSTRUCTION DESIGNED

6 Belém RIO DE JANEIRO SANTOS Palmas Estrela DOeste ESTIMATED INVESTMENT R$ 3,5 bilhões TOTAL EXTENSION OF THE SECTION TO BE GRANTED 2,600 MILES NORTH - SOUTH RAILROAD : SUB-CONCESSION SECTION SUB-CONCESSION SECTION SÃO LUIS EF 151

7 FIGUEIRÓPOLIS ILHEUS Belém SÃO LUÍS EF 151 TOTAL EXTENSION OF THE SECTION TO BE GRANTED 2,384 MILES ESTIMATED INVESTMENT R$ 3 BILHÕES WEST- EAST INTEGRATION RAILROAD: SUB-CONCESSION SECTION EF 334

8 EXTENSION OF SAVANA: 1,8 milhão km 2 AREA OF INFLUENCE OF THE NORTH - SOUTH RAILROAD: BRAZILIAN SAVANA

9 Soybeans and derivatives Soybean meal Soybean oil Maize Fertilizer Sugar Cotton PRODUCTIVE POTENTIAL OF SUB-CONCESSIONS AREA OF INFLUENCE PRODUCTIVE POTENTIAL OF SUB-CONCESSIONS AREA OF INFLUENCE Fertilizer Fertilizer Alcohol Alcohol Derived from petroleum Derived from petroleum Containers Containers Iron ore Iron ore Bauxite Bauxite

10 RAILROAD GENERAL CARGO ORETOTAL EF EF ESTIMATED DEMAND FOR TRANSPORT (TON.MIL)

11 Term of sub-concession: 30 years Provides resources: fully paid for the VALEC, as stipulated in the contract schedule and the announcement of the sub-concession. THE SUB-CONCESSION PROCESS

12 Law nº ( February 13, 1995) Law nº , (June 7, 1995 ) Article 175 of the Federal Constitution Law nº ( June 21, 1993) Law nº ( May 27, 1998) Announcement of the sub-concession, and annex THE LEGAL FRAMEWORK OF THE SUB-CONCESSION PROCESS

13 The participation of individual Brazilian and Foreign Companies is permitted. The participation of consortiums between Brazilian and / or Foreign Companies in one Consortium is also permitted. Acquisition of the Bidding Documents. The presentation of a commitment to form a consortium indicating the participation of each member of the consortium and the leader. REQUISITES FOR THE PARTICIPATION OF COMPANIES OF COMPANIES

14 FIRST STAGE OF THE BIDDING PROCESS – PRE-QUALIFICATION (Special Bidding Committee of VALEC) Legal Qualification Technical Qualification Economic and Financial Qualification Clean Fiscal Standing STAGES OF THE BIDDING PROCESS

15 Delivery of the BOVESPAs instructions to the pre-qualified companies STAGES OF THE BIDDING PROCESS

16 SECOND STAGE OF THE BIDDING PROCESS – AUCTION IN THE BOVESPA (The Sao Paulo Stock Exchange) STAGES OF THE BIDDING PROCESS Deposit of the Bid Guarantee (two days prior to the Auction) Proceedings in accordance with the BOVESPA Manual Adjudication of the result based on the Highest Payment offered for the grant of the Concession Disqualification of Proposals below the Minimum Value established for the grant of the Concession Confirmation of the Winning Bid by the auctioneer Publication of the Result of the Auction indicating the winning company Creating a Specific Purpose Society for signing the contract

17 NORTH - SOUTH RAILROAD ( EF 151) 1st installment - 50% of the winning bid of the auction upon financial settlement - the signing of the sub concession - in conclusion of construction of the of the section Palmas (TO) – Anápolis (GO), scheduled for December nd installment - 25% of the winning bid in conclusion of construction of the Ouro Verde de Goias (GO) - Rio Verde (GO), scheduled for July rd installment - 25% of the winning bid in the auction in conclusion of construction of the section Rio Verde (GO) – Estrela DOeste (SP), scheduled for December SUB CONCESSION PAYMENT

18 WEST- EAST INTEGRATION RAILROAD WEST- EAST INTEGRATION RAILROAD ( EF 334) 1st installment - 40% of the winning bid of the auction upon financial settlement - the signing of the sub concession - in conclusion of construction of the section Ilhéus (BA) - Caetité (BA), scheduled for July nd Tranche - 30% of the winning bid in conclusion of construction of the section Caetité (BA) - Correntina / Barriers (BA), scheduled for July rd installment - 30% of the winning bid in the auction in conclusion of construction of the section Figueirópolis (TO) - Correntina / Barreiras (BA), scheduled for December SUB CONCESSION PAYMENT

19 VALEC – Engenharia, Construções e Ferrovias S.A. SAN – Quadra 3 – Sala 1100 Edifício Núcleo dos Transportes Brasília – DF

20 Data: 3 a 10 de novembro de 2008 Lisboa, Londres, Madri e Frankfurt THANKS !


Download ppt "Data: 3 a 10 de novembro de 2008 Lisboa, Londres, Madri e Frankfurt CONCESSIONS OF RAILROADS CLEILSON QUEIROZ VALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS."

Similar presentations


Ads by Google