1 MONGOL GAZAR LLC OLON OVOOT GOLD PROJECT
LAND PROPERTY EXPLORATION MINING PROCESSING PLANT

2 OLON OVOOT GOLD PROPERTY LOCATION
ULAANBAATAR Mandal ovoo OLON OVOOT GOLD DEPOSIT Dalanzadgad

3 LAND PROPERTY MONGOL GAZAR OWNED HECTAR EXPLORATION LICENCE

4 EXPLORATION GEOLOGICAL MAPPING GROUND GEOPHYSICAL SURVEY SAMPLING
TRENCHING CORE DRILLING RC DRILLING ASSAY

5 DIAMOND CORE AND REVERSE CIRCULATION DRILLING

6 KHANIIN KHETS OROGENIC GOLD FIELD
UNEGEN DEL Length km Width km ITGEL MODOT DIORITE BOROODON GAVUU OLON OVOOT BURKHAN DEL OVOOT III

7 KHANIIN KHETS GENERAL STRUCTURAL PLAN
GOYOT SYNCLINE KHORIMT ANTICLINE OVOOT SYNCLINE

8 OLON OVOOT – GREENSTONE HOSTED, OROGENIC GOLD DEPOSIT
HOST ROCK: -ANDESITE, ANDESITIC TUFF, SUBVOLCANIC BODIES OF DIORITE, ALL COMPETENT -SANDSTONE, MUDSTONE, PHYLLITIC SHALES, SERICITIC SHALES, ALL INCOMPETENT STRUCTURE: - DEFORMATION STYLE STRUCTURE: - FOLDS, HINGE AND HINGE SURFACE ZONE LEG ZONE, SADDLE REEF ZONE. - FAULTS, SHEAR ZONES, MYLONITE AND CATACLASITE ZONE ALONG SHEARING, REVERSE FAULTS

9 ALTERATION AND MINERALIZATION
SERICITIZATION SILICIFICATION CHLORITIZATION CARBONATIZATION PROPYLLITIZATION MINERALIZATION QUARTZ-LOW SULPHIDE Au-QUARTZ-ANKERITE QZ-SERICITE-PYRITE-ANK QZ-SER- ANK-As-c PYRITE CHLORITE-QZ-SER-ANK-PY

10

11

12 GOYOT ULAAN EXPLORATION TARGET AREA

13 MURGUTSUG EXPLORATION TARGET AREA

14 GEOLOGICAL MAP OF BURKHAN DEL GOLD DEPOSIT 2D MODEL

15 DRILL HOLE LOCATION OF OLON OVOOT GOLD DEPOSIT

16 GEOLOGICAL CROSS SECTION OF OLON OVOOT OROGENIC GOLD DEPOSIT LINE 433010

17 GEOLOGICAL CROSS SECTION OF OLON OVOOT OROGENIC GOLD DEPOSIT LINE 433170

18 GEOLOGICAL CROSS SECTION OF OLON OVOOT OROGENIC GOLD DEPOSIT LINE 433330

19 TSAGAAN TOLGOI ORESHOOT OF OLON OVOOT OROGENIC GOLD DEPOSIT

20 HUREN TOLGOI ORESHOOT OF OLON OVOOT OROGENIC GOLD DEPOSIT

21 BASIC GEOSTATISTIC PARAMETERS OF THE OLON OVOOT OROGENIC GOLD DEPOSIT

22 BASIC GEOSTATISTIC PARAMETERS OF THE OLON OVOOT OROGENIC GOLD DEPOSIT

23 OLON OVOOT ORE SHOOTS LOOKING FROM NORTH-EAST

24 OLON OVOOT ORE SHOOTS LOOKING TOP

25 OLON OVOOT BLOCK MODEL

26 3D MODEL ORESHOOTS OF BURKHAN DEL GOLD DEPOSIT
Looking from SE

27 PIT DESIGN TO 200 M DEPTH

28 PLAN VIEW OLON OVOOT MINING

29 MAIN PIT AREA

30 WASTE HAULING

31 INSIGHT SECTIONS OF OLON OVOOT GOLD DEPOSIT LINE 433000
ORE ZONE ORE ZONE

32 INSIGHT SECTIONS OF OLON OVOOT GOLD DEPOSIT LINE 433204
ORE ZONE

33 INSIGHT SECTIONS OF BURKHAN DEL GOLD DEPOSIT LINE 433250
ORE ZONE

34 MONGOL GAZAR OLON OVOOT AREA GOLD RESOURCES (FEBRUARY 2007, WARDROP ESTIMATE)
CATEGORY TONNES GOLD G/T GOLD OUNCES / TONNE GOLD INDICATED 7,100,000 2.9 660,000 INFERRED 1,300,000 1.5 62,500 (A) 722,500 UNCAPPED 3.5 797,000 1.8 75,000 (B) 872,000 BURKHAN DEL CATEGORY TONNES GOLD G/T GOLD OUNCES / TONNE GOLD INDICATED 2,100,000 1.6 108,000 INFERRED 355,000 1.3 15,000 (A) 123,000 UNCAPPED 2.3 155,000 (B) 170,000

35 OLON OVOOT AND BURKHAN DEL GOLD RESOURCE
CATEGORY TONNES GOLD G/T GOLD OUNCES CAPPED INDICATED 9,300,000 2.6 775,000 INFERRED 1,600,000 1.5 77,000 (A) 852,000 UNCAPPED 3.2 954,000 1.7 88,000 (B) 1,042,000 TOTAL RESOURCES ESTIMATE FOR OLON OVOOT AND BURKHAN DEL PROPERTIES OUNCES

36 PROCESSING PLANT CONSTRUCTION AT 2003

37 CIP PROCESSING PLANT PROJECT CAPACITY 2000 tn ORE PER 24 HOUR

38 IN FUTURE FIND OUT 15-20 MILLION TN ORE
BIULD NEW 5000 TN PROCESSING PLANT

39 THE END