1 Saudi Arabia Project Summary Wednesday, 23 September 2009

2 Surface Sites Deployment Abha AirportSouda MountainBaha Airport Khamis AirbasePolice AcademyTaif Airport

3 Surface Sites Installed

4 Site NameLatitudeLongitudeAltitude (m) Instruments (Site Number) Notes SaudiSfcSite Rain Gauge (1), AWS (1), Disdrometer (2) PME Facility on Top of Souda Mountain. SaudiSfcSite Rain Gauge (2) AWS (2) Police Academy Training Center SaudiSfcSite Rain Gauge (37)Abha Radar SaudiSfcSite Rain Gauge (38) AWS (3) Disdrometer (2) Baha Radar SaudiSfcSite Rain Gauge (39) AWS (4) Disdrometer (3) Taif Radar SaudiSfcSite Rain Gauge (40)Khamis AB