1 Vance Brand Municipal Airport Airport Master Plan

2 Vance Brand Municipal Airport Based Aircraft Forecast

3 Vance Brand Municipal Airport AIRPORT AND RUNWAY DATA Airport elevation feet Mean daily maximum temperature of the hottest month F. Maximum difference in runway centerline elevation.. 24 feet EXISTING RUNWAY LENGTH feet RUNWAY LENGTHS RECOMMENDED FOR AIRPORT DESIGN Small airplanes with less than 10 passenger seats 75 percent of these small airplanes feet 95 percent of these small airplanes feet 100 percent of these small airplanes feet Small airplanes with 10 or more passenger seats feet Large airplanes of 60,000 pounds or less 75% of large airplanes at 60% useful load 6860 feet Source: FAA software. Runway Length Guidelines

4 Vance Brand Municipal Airport Preliminary Alternatives Alternative 1 – Do-Nothing (Maintain 4,800 length) Alternative 2 – Extend runway to 6,360 Alternative 3 – Extend runway to 6,860

5 Vance Brand Municipal Airport Final Alternatives Alternative 1 – Do-Nothing (Maintain 4,800 length) Alternative 4 – Extend to 5,650 (adds 850 fully usable length and does not relocate N. 75 th Street) Note: Alternatives 2 and 3 were eliminated from further consideration by vote of the Airport Advisory Board. Alternative 4 was added following the first public information meeting and third regular meeting of the AAB.

6 Vance Brand Municipal Airport Alternative 1: Do Nothing

7 Vance Brand Municipal Airport Alternative 4: Extend Runway (adds 850 fully usable length)

8 Vance Brand Municipal Airport Evaluation Criteria Safety Ability to meet aviation needs Airspace Surface Access Environmental Factors Availability of Utilities Land Requirements Costs Community Compatibility Local Acceptability

9 Vance Brand Municipal Airport Evaluation Results Safety: Alternative 1 does not address the needs of larger aircraft types that currently use the airport e.g., Cessna Citation Bravo, KingAir 90, etc. Alternative 4 provides additional distance for take-off, landing, and emergency operations.

10 Vance Brand Municipal Airport

11 Evaluation Results Meet Aviation Needs: Alternative 1 (current length 4,800) meets the needs of 75 percent of small airplanes with <10 passenger seats. Alternative 4 provides (length of 5,650) nearly 90 percent of the runway length recommended for these small airplanes.

12 Vance Brand Municipal Airport

13

14 Airspace: Alternative 1 does not alter existing airspace requirements. The change imposed by Alternative 4 is to small to cause any major disadvantage. Evaluation Results

15 Vance Brand Municipal Airport Airport Influence Area: Do-Nothing and Alternative 4

16 Vance Brand Municipal Airport Evaluation Results Surface Access: Neither Alternative requires an disruption of the surface access system, notably North 75 th Street, in the area of the airport.

17 Vance Brand Municipal Airport Evaluation Results Environmental Factors: Alternative 1 enjoys an advantage because it does not require any development. Alternative 4 would generate construction impacts (dust, etc.) that will need to be mitigated. Alternative 4 will also require land acquisition (approx. 27 acres and relocation of one affected owner. Noise exposure exceeding 65 Ldn would not extend beyond proposed airport land and easements.

18 Vance Brand Municipal Airport Evaluation Results Availability of Utilities: The alternatives are considered equal with respect to this criterion. Neither will impose significant new requirements.

19 Vance Brand Municipal Airport Evaluation Results Land Requirements: Alternative 1 does not require land acquisition. Acquisition of avigation easements would be recommended. Fee simple acquisition of approximately 27 acres and one residence would be recommended under Alternative 4.

20 Vance Brand Municipal Airport Costs: Alternative 1 does not require capital expenditures for runway extension. Estimated costs for Alternative 4 are $2.4 million ($2.16 FAA; $120,000 state; and $120,000 local) Evaluation Results

21 Vance Brand Municipal Airport Evaluation Results Community Compatibility: Alternative 4 requires no zoning or land use changes and community compatibility impacts are minimal. It requires no zoning or land use changes. Alternative 1 has no additional compatibility effects.

22 Vance Brand Municipal Airport Local Acceptability: Alternative 1 is preferred by opponents of airport expansion. Alternative 4 is a compromise generating less opposition than more ambitious runway extension alternatives. Evaluation Results

23 Vance Brand Municipal Airport Conclusions Alternative 1 imposes fewer impacts because it makes no improvements. Alternative 4 addresses aviation safety for airplanes that use the airport now and in the future. Consultants and AABs recommendation: Alternative 4.

24 Vance Brand Municipal Airport South Side Airport Development Current and Proposed Master Plan

25 Vance Brand Municipal Airport VANCE BRAND AIRPORT DEVELOPMENT Compatible Commercial Development Options: –Aviation Manufacturing Operations –Non-Aviation Manufacturing Operations –Community College Aviation Technical School –Aviation Paint Shop –Aircraft Maintenance Facility

26 Vance Brand Municipal Airport VANCE BRAND AIRPORT DEVELOPMENT Compatible Commercial Development Options: –Aircraft Restoration Service –Fixed Base Operator –Avionics Repair Facilities –Commercial Restaurant –Aviation Related Service Operations

27 Vance Brand Municipal Airport South Side Airport Development Current and Proposed Master Plan PROPOSED FRCC CAMPUS (30 acres)

28 Vance Brand Municipal Airport Airport Noise Abatement Procedures: Updated in 2002.

29 Vance Brand Municipal Airport Traffic pattern altitude 6,050 MSL (raised 150 feet) Pilots should climb to at least 500 hundred feet AGL after takeoff before turning crosswind. Pilots are requested to avoid making touch and go landings at the Longmont Municipal Airport before 8AM and after 8 PM. Avoid flying over the city and outlying residential areas as much as possible. New Procedures Include:

30 Vance Brand Municipal Airport Airport Master Plan Summary and Notes: The Airport Master Plan is a planning tool to help guide the future of the airport for all aspects of aviation and community needs. This is a ten-year plan that will be updated again in the future. The projects contained in the Airport Master Plan are unfunded at this time.

31 Vance Brand Municipal Airport Airport Master Plan Schedule : Staff and AAB to receive City Council direction on January 7, Approximately 6 weeks for completion of final draft. Final Draft of the Master Plan with the Council chosen options to be presented in March Anticipate adoption of final Master Plan by Resolution in April 2003.