Emergency Mask (EM) Integrating MBSE Into Ongoing Projects: Requirements Validation and Test Planning for ISS SAFER, AIAA Annual Technical Symposium, May.

Similar presentations


Presentation on theme: "Emergency Mask (EM) Integrating MBSE Into Ongoing Projects: Requirements Validation and Test Planning for ISS SAFER, AIAA Annual Technical Symposium, May."— Presentation transcript:

1 Emergency Mask (EM) Integrating MBSE Into Ongoing Projects: Requirements Validation and Test Planning for ISS SAFER, AIAA Annual Technical Symposium, May 18, 2012, G. Pierce/T. Williams

2 Emergency Mask Hardware Overview Gore hood Visor Adjustable head strap Butyl Rubber N eckdam One size fits all Seals at the neck Dual bayonet connectors accommodate either: Two Fire Cartridges Two 3M Ammonia Cartridges Emergency Mask with Fire Cartridges (Side) Exhalation port Inhalation port (2x) w/ keyed bayonet fittings Emergency Mask without Cartridges (Front) EM Design is based on heritage mask already in service with DoD… with a change in hood material to improve flammability resistance and permeation resistance, but… The hood material touches almost every interface in the mask

3 Qualification/Acceptance Tests Performed Key: Fabrication Leakage Test (Water) Inhale/Exhale Valve Test Leakage Test (Salt) Neckdam Stretch Test PDA/PIA Visor/Gasket Leak Leakage Test (Water) Leakage Test (Salt) Functional Tests (as required) Functional Tests (as required) Neckdam Stretch Qual 1 Qual 2 Qual 3 Qual 4 Qual 5 Qual 6 Field of Vision Thermal Cycle Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Don/Doff Cycle Test (7 cycles) Inhalation Resistance Exhalation Resistance CO 2 Buildup WSTF Activity JSC Activity Gentex Activity Possibly Destructive Possibly Destructive Outside Vendor Molten Drip After Flame WSTF A WSTF C WSTF B Ammonia Permeability Thermal Cycle Hood Strap Pull Cartridge Axial Pull Cartridge Torque Cartridge Cantilever Pull Don/Doff Cycle Test (28 cycles) Don/Doff Cycle Test (28 cycles) Protection Factor Depress/ Repress Depress/ Repress Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Salt Water Salt Water Salt Water Salt Water Salt Water Salt Water Salt Water Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Water Salt Neckdam Water Salt Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Salt Water Neckdam Demos Prototype testing covered every high risk test planned for qualification testing… Post-test evaluation was digital, rather than analog

4 Lessons/Summary ChallengesOpportunities / Lessons Learned Integration of new tech into an existing design may be easy to characterize as a simple modifications – the devil is in the details Simple changes that touch nearly all interfaces in the design are not always simple. Clear understanding of the interfaces and how they may be affected by changes can assist in test planning and risk assessments Prototyping is essential, but prototypes can be false positives Stretch to get maximum value from the prototypes – understand your margins