June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.

Similar presentations


Presentation on theme: "June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004."— Presentation transcript:

1 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004 PEP-II IR Upgrades

2 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 2 Outline Present Interaction Region Present Status Upgrade plans Plans for summer 2004 and summer 2005 Summary

3 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 3 PEP-II Interaction Region e + e - e e Luminosity signal

4 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 4 LER Synchrotron Radiation Fans

5 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 5 HER Synchrotron Radiation Fans

6 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 6 PEP-II Interaction Region and the BaBar Detector HER LER Collision point BaBar e e

7 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 7 PEP-II Upgrade Plans Lower y * from 10.5 to 8mm Increase number of bunches to 1720 Raise LER beam current from 2.4 to 4.5 A Increase LER bunch current from 1.6 mA to 2.6 mA Raise HER beam current to 1.4 to 2.2 A Increase HER bunch current from 1.0 mA to 1.3 mA Shorten bunch lengths to 9 mm Reach peak luminosity by Summer 2007 Increase luminosity to 2.4 10 34 cm -2 sec -1

8 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 8 Overall Parameters and Goals ParameterUnitsDesign Best in collision Future 2007 goal I+mA214024504500 I-mA75015502200 Number bunches 165815881715 y * cm15-20118 y 0.030.05, 0.080.055-0.08 Luminosityx10 33 3.09.224 Integrated lumi / day pb -1 1307101800 Over 5 design Over 3 design 2 design 3 design ½ design 8 design Over 13 design

9 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 9 Upgrade Current & Energy Requirements Current (A) Energy (GeV)SR power LER - Main Ring Design Limit33.5 FY2005 Goal3.63.1Less than design limit FY2007 Goal4.53.1Less than design limit HER - Main Ring Design Limit39 FY2005 Goal1.89Less than design limit FY2007 Goal2.29Less than design limit Interaction Region (IR) LER Beam Power Design Limit33.1 FY2005 Goal3.93.122% SR power increase FY2007 Goal4.53.150% SR power increase HER Beam Power Design Limit29 FY2005 Goal1.89Less than design limit FY2007 Goal2.2910% SR power increase

10 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 10 Upgrade Plan Other Requirements Increased HOM Heating, RF shielding –Bunch Length 2004: 11-12 mm 2006: 9 mm –Bunch Current LER 45% increase HER 30% increase New Lattice –IR Lattice and BSC

11 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 11 IR Modifications We think we can get to 8 mm y * without any major hardware changes in the near IR. We have achieved these y *s in machine development days, which is encouraging. However, we still have a lot of work to do to make these lower y * values perform. Vacuum chamber heating from SR power at the higher beam currents is being re-evaluated for all of the chambers in the IR. For the chambers inside +/- 3 m of the IP things look OK. SR masking for detector backgrounds is OK We presently see some beam-beam effects from the 1 st parasitic crossing in the by2 pattern, 63 cm from the IP. Presently, we can correct for most of this effect and get back the lost lumi. This parasitic crossing effect is made worse with lower y *s. Will we still be able to compensate? We want to maintain head-on collisions but keep open the option of introducing a small crossing angle at the collision point.

12 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 12 IR modifications (cont.) Looking at upgrading B1 magnets to improve the 1 st parasitic crossing effect Keep the B dl the same. Strengthen the inside magnetic slices and weaken or remove some of the outside slices. Need a rad hard magnetic material with a higher field strength We want to build new radial ion pumps. The present pumps are not working. Build new HER Q5 chambers and possibly new Q4 chambers Rebuild some of the LER vacuum chambers with NEG pumps (inadequate RF screens)

13 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 13 Modifications in the support tube Replace pumps Silicon vertex tracker

14 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 14 New orbits almost the same as present machine Keep new design orbit within 2 mm of present design

15 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 15 B1 Radial Ion Pump RF screen New BPM set Issues –Argon Instability –Both pumps are non-functional Status –Progressing on schedule for 2005 installation –New pump design near completion –Changed to a noble diode pump rebuild with tantalum plates –Split pump into two circuits –Added BPM set with the correct separation to decipher the position of the two beams –Replaced feedthru with a standard pump feedthru Baffles to prevent SR scatter hitting pump Example of work in progress

16 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 16 Q1/Q2 HOM Bellows Issue –HOM Power Absorbing ~10 KW presently Predict ~ 50 KW in 2007 Status –Using MAFIA optimizing a design solution Tiles need to absorb HOM power, without creating excessive HOM power. Significant amount of the power it absorbs is created by the beam passing by it. –Plan to build a test bellows this fall and replace an existing bellows in a straight section with trapped HOM power.

17 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 17 Summary of Rebuild Plans Summer/Fall 2004 –Synchrotron Light Monitor (SLM)– Pin Hole Camera Version –Frascati style Transverse Kicker –Longitudinal Feedback Kicker –RF cavities –New support tube chiller Summer/Fall 2004 – pending improvements –Q1/Q2 HOM test bellows –New gasket style ion pump screens –Q5 temporary chamber –LER IR2 NEG chambers Summer/Fall 2005 – pending improvements –Q2L Chamber –HER and LER Q4 and Q5 chambers –Stronger B1 magnet –Radial Noble Diode Ion Pump –Vertex Bellows –Q1/Q2 HOM Bellows –Q4/Q5 Bellows –10m Fixed Collimator in HER

18 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 18 Contributers/ Upgrade Staff Physicists –Michael Sullivan –John Seeman –Stan Ecklund –Sasha Novokhatski –Uli Wienands –Cho K. Ng –Keith Jobe –Mark Ross –Artem Kulikov –Alan Fisher –Daniel Wright Designers –Catherine Carr –Don Arnett –Ben Smith –Ben Bigornia –Ken Banuelos –Manual Trigos –Ho Dong –Ted Osier Engineering –Scott Debarger –Nadine Kurita –J Brian Langton –Rodd Pope –Albert Sheng –Stewart Metcalfe –Mohammad Dormiani –David Kharakh

19 June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 19 Conclusions We have a small but very dedicated staff We are in the process of identifying hardware that will limit future machine performance Working on hardware upgrades for both this coming summer 2004 and for summer 2005 We have several meetings each week to address various issues: –Tue vacuum – present status and upgrade progress –Wed vacuum – specifically for upgrade designs –Fri IR upgrade – all aspects of the IR upgrade –Fri bkgds – present and future projections of detector bkgds Near term upgrades are going well Planned upgrades toward a luminosity of 2.4 10 34 are on track