Presentation is loading. Please wait.

Presentation is loading. Please wait.

Long Term Facilities Planning Committee January 2, 2013.

Similar presentations


Presentation on theme: "Long Term Facilities Planning Committee January 2, 2013."— Presentation transcript:

1 Long Term Facilities Planning Committee January 2, 2013

2 Current Buildings Aldrich Junior High School Gorton Junior High School Winman Junior High School Pilgrim High School Warwick Veterans Memorial High School Toll Gate High School Warwick Area Career & Technology Center

3 High Schools High Schools Junior High Schools Feeder school / Pods

4 Weighted Numbers Unweighted Numbers

5 Current Unweighted Enrollment Pilgrim Area Feeder Schools Francis, Holden, Holliman, Hoxsie, Norwood, Wyman Aldrich Junior High School Grade Grade 8 – 256 Total Pilgrim High School Grade Grade Grade Grade 12 – 275 Total: 1079

6 Current Unweighted Enrollment Veterans area Feeder schools Lippitt, Oakland Beach, Park, Sherman, Warwick Neck Gorton Junior High School Grade Grade 8 – 181 Total Veterans High School Grade Grade Grade Grade 12 – 234 Total - 991

7 Current Unweighted Enrollment Toll Gate Area Feeder Schools Cedar Hill, Greenwood, Robertson, Scott, Wickes Winman Junior High School Grade Grade 8 – 270 Total Toll Gate High School Grade Grade Grade Grade 12 – 230 Total: 976

8 7-12 School Enrollment School12/1313/1414/1515/1616/1717/18 Veterans Pilgrim Toll Gate Winman Gorton Aldrich Total:

9 pkk NESDEC12/ Oct difference 60 13/ / / / / / / / / / NESDEC PROJECTIONS

10 SchoolCurrent Enrollme nt ½ school No Aldrich No Gorton No WinmanRecd Cap Total Cap Aldrich Gorton Winman Proof # JHS School Options?


Download ppt "Long Term Facilities Planning Committee January 2, 2013."

Similar presentations


Ads by Google