Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 AFCEC FY14 Project Overview All projected FY14 procurements are.

Similar presentations


Presentation on theme: "Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 AFCEC FY14 Project Overview All projected FY14 procurements are."— Presentation transcript:

1 Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 AFCEC FY14 Project Overview All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. 21 Nov 2013

2 I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY14 Environmental Project Overview Environmental Quality Plan to invest approximately $221M overall in the management of natural and cultural resources at CONUS and overseas AF installations Projects provide for the responsible management of air and water resources and proper waste disposal activities to ensure installation operations capacity needs are met while maintaining compliance with Federal, state and local laws and regulations Program executed through multiple agents ESS, USACE, GSA, and local base contracting squadrons Execution includes Fence2Fence strategy (~$30M-$40M of $221M) via USACE/BIEST, GSA BPA & GSA awarded/722 ESS executed/administered BPAs (must be on GSA schedule) Remediation Installation Restoration (IR), Military Munitions Response (MMR) Programs ~$183.7M (~230 projects) executed through 772 ESS, USACE, and Base Contracting Office (BCO) All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. 221 Nov 2013

3 I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY14 Environmental Project Overview – EQ Program $163M is part of the total $221M EQ Program investment; balance of investment is operational costs All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. 321 Nov 2013

4 I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY14 MILCON, R&M, Sustainment and Demolition Project Overview All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. ProgramBASEProject Title Recommended Execution Agent SUSHILL AIR FORCE BASE REPAIR (N) ASPHALT PAVEMENT RW BAK-12 TO BAK-14 USACE SUSDOVER AIR FORCE BASE REPAIR (SUS) RUNWAY 01/19 AFCEC SUSALTUS AIR FORCE BASE AFLD-SUST: RWY OVERRUNS USACE R&MUSAF ACADEMYConst/Rpr Munitions StorageBase R&MUSAF ACADEMYTitle II, Rpr Mitchell Hall, Ph 8Base R&MUSAF ACADEMYRpr Pedestrian Bridges-FairchildBase R&MUSAF ACADEMYRpr HTHW - Phase 2Base R&MUSAF ACADEMYRpr CRAC Unit to Backup Generator Comm BldgBase R&MLANGLEY AIR FORCE BASERepair Renovate Main Exchange F 290 Demo F. 254TBD R&MMISAWA AIR BASEReplace Transformer and Fuel Tank, B939 Freq ConvBase R&MMINOT AIR FORCE BASEMILCON Fuel Line Companion ProjectBase R&MALTUS AIR FORCE BASEPAVE - MINOR: UPGRADE RD FOR COCO FUEL STATION, B975Base R&MJOINT BASE FT SAM HOUSTONNEW-FSH Site for DLA Fuel StationBase R&MCAMP BULLIS TRAINING ANNEXNEW-CBUL Site for DLA Fuel StationBase R&MUSAF ACADEMYAPF Infrastructure Support for NAF Major ConstructionBase R&MBEALE AIR FORCE BASECONSTRUCT UTILITIESBase R&MBUECHEL AIR BASECONSTRUCT SCC-ARMORY-LMF (US-SHARE)LBB R&MKLEINE BROGEL AIR BASECONSTRUCT KB VAULT SUPPORT FACILITY (US SHARE)RCI R&MKLEINE BROGEL AIR BASE CONSTRUCT KB MUNSS OPS CENTER-COMMAND POST-RMF (US SHARE) RCI R&MAVIANO AIR BASE(US SH) CONSTRUCT MUNITIONS STRGE MODULES ZULU LOOPNAVFAC R&MMINOT AIR FORCE BASERepair Runway Center Keel and AsphaltUSACE R&MPACIFIC AIR FORCESRepair HQ Building 1102 (HQ PACAF) - Ph 5NAVFAC R&MFORT EUSTISRepair Training Barracks, Bldg 805Base 421 Nov 2013

5 I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY14 MILCON, R&M, Sustainment and Demolition Project Overview All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. ProgramBASEProject Title Recommended Execution Agent R&MVANDENBERG AIR FORCE BASERPR: 30 OG & JSpOC Consolidation into 7000,7015,7025AFCEC R&M CHEYENNE MOUNTAIN AIR STATION Repair Cooling Tower PlatformsBase R&MKADENA AIR BASEREPAIR AIRCRAFT CONTROL TOWER WINDOWS, B3423Base R&MKUNSAN AIR BASEREPAIR FIRE PROTECTION SYSTEM, PHASE HANGAR B2242USACE R&M DAVIS-MONTHAN AIR FORCE BASE Rpr Corrosion Control Hangar, Fac 5255Base R&MLANGLEY AIR FORCE BASERepair Replace Chillers and Install Diverters, F. 10Base R&MKADENA AIR BASEREPAIR SEWERAGE SYSTEM FROM TAXIWAY J TO G,Base R&MJOINT BASE FT SAM HOUSTONRENV-Correct FSDs & Renovation, Multiple FacilitiesUSACE R&MELMENDORF AIR FORCE BASECONSTRUCT PHYSICAL SECURITY WATER RESERVOIRBase R&MMAXWELL AIR FORCE BASEREPL NATURAL GAS DIST SYS PH 1Base R&MMINOT AIR FORCE BASEREPAIR ALCM MX TRAINING FACILITY - BLDG 1113Base R&MRAMSTEIN AIR BASEREPAIR PRECISION GUIDED MUNITIONS ADMINBase R&MMAXWELL AIR FORCE BASEREPL WATER MAINS, PH 1 MAXWELLBase R&MCOLUMBUS AIR FORCE BASEADD ALTER HANGAR 456, T-6 MAINTENANCE HANGARBase R&MLANGLEY AIR FORCE BASERepair/Renovate Interior, 633 CONS F. 90Base R&M NEW BOSTON AIR FORCE STATION REPAIR FIRE SUPPRESSION SYSTEM - MULTI FACILITYAFCEC R&MKADENA AIR BASEREPAIR PAVEMENT, AIRCRAFT HOLD LOCATIONSBase R&MSHAW AIR FORCE BASEREPR CATM VENTILATION, B1833Base R&MMELROSE AIR FORCE RANGEUPGRADE FIRE SUPPRESSION CAPABILITIES, MAFRAFCEC R&MHILL AIR FORCE BASEUpgrade Fire Alarm and High Pressure Pumps System, Bldg. 200Base R&MHOLLOMAN AIR FORCE BASEINSTALL FIRE SUPPRESSION, HYDRAULICS/FUELS MAINT SHOP, B/315Base 521 Nov 2013

6 I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY14 MILCON, R&M, Sustainment and Demolition Project Overview All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. ProgramAFCECProject Title Recommended Execution Agent R&MBELLOWS AIR FORCE STATIONREPLACE EXISTING LARGE CAPACITY CESSPOOLS, BELLOWS AFSAFCEC R&MSHAW AIR FORCE BASEREPR FITNESS CENTER B806Base R&MKADENA AIR BASEREPAIR PAVEMENTS, AIR CRAFT HOT GAS, FARP SITESBase R&MJOINT BASE FT SAM HOUSTONRENV-Repair Wells and Install SCADA SystemsUSACE R&M DAVIS-MONTHAN AIR FORCE BASE Cns/Rpr (Add/Renovate) Vehicle Ops, 4701Base R&MRANDOLPH AIR FORCE BASERepair OSI B200AFCEC R&MSCOTT AIR FORCE BASEREPAIR (R&M), Perimeter Fence, BasewideBase R&MVANDENBERG AIR FORCE BASERPR: Repair Fire Suppression at Bldg 1900Base R&MMOODY AIR FORCE BASEAD/RPR DINING FACILITY, B571Base R&MTRAVIS AIR FORCE BASEREPAIR (R&M) TXWY LIGHTS, D,G,H,M,N,R,T; Phase 1NAVFAC DEMOCHARLESTON AIR FORCE BASEVISITORS QUARTERS - SITE PREP (APF COMPANION) Base DEMOMACDILL AIR FORCE BASEDemo Bldgs 13, 60 & 694 (Site Prep Companion NAF) Base DEMOTINKER AIR FORCE BASEDEMO CONTAMINATED SOIL AND GROUNDWATER, FUEL TRANSFER LINE USACE DEMONELLIS AIR FORCE BASEDemo Gymnasium (NAF Companion) Base DEMONELLIS AIR FORCE BASEDemo Pool Facilities (NAF Companion) Base P341BARKSDALE AIR FORCE BASEFire Station No. 2AFCEC P341MELROSEConstruct Range Control Officer TowerAFCEC P341MINOT AIR FORCE BASEConstruct Multi-Cube Storage StructureAFCEC 621 Nov 2013

7 I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY14 MILCON, R&M, Sustainment and Demolition Project Overview All projected FY14 procurements are based on the best information available. Information presented herein is subject to modification and is in no way binding on the government. More specific information relating to any individual item or class of items will not be furnished until the proposed acquisition is synopsized through the Government Wide Point of Entry (GPE). Small business set-asides may be involved, but that determination will be made only when acquisition action is initiated. Consult the Procuring Contracting Officer (when identified) for further information. ProgramBASEProject Title Recommended Execution Agent ECIPMT HOME AIR FORCE BASEInstall Efficient Irrigation & LandscapingAFCEC ECIPHICKAM AIR FORCE BASESolar PV SystemAFCEC ECIPHICKAM AIR FORCE BASESolar PV SystemBase ECIPARNOLD AIR FORCE BASEInstall Steam Trap MonitorsBase ECIPSHEPPARD AIR FORCE BASELED Lighting Retrofit Street and Parking LightsAFCEC ECIPRANDOLPH AIR FORCE BASEDistrict CW Plant B496 Thermal Storage TankAFCEC ECIPLAUGHLIN AIR FORCE BASEInstall Basewide Xeriscape Phase 2AFCEC ECIPSHAW AIR FORCE BASEConvert Oil Fired Boilers to GasBase ECIP SYMOUR –JOHNSON AIR FORCE BASE Basewide LED LightsBase Reference SUS - Sustainment R&M - Restoration and Modernization P341 - MILCON Program ECIP - Energy Conservation Investment Program 721 Nov 2013